Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Study on Flood Discharge and Countermeasures of ShiQiao Reservoir Spillway

View through CrossRef
The ShiQiao Reservoir was built in the 1950s, whose main functions are irrigation and flood control. With the increasing number of downstream agricultural water, the contradiction is increasingly prominent between pettier beneficial capacity and the raising downstream agricultural water; at the same time, due to the disrepair of spillway and the increase of upstream inflow, the original spillway flood discharge capacity cannot meet the requirements for flood control. On the basis of systematical investigations of engineering geology and hydrogeological, an effective method is proposed for plain reservoirs to solve these problems. The method is, by improving the weir crest elevation and widening spillway to address the inadequate of beneficial capacity and the low standard of flood control spillway. Through the validation of analysis and calculation, this method is feasible and economical. It fundamentally solves the problems of ShiQiao Reservoir, and ensures the safe operation of this reservoir.
Title: Study on Flood Discharge and Countermeasures of ShiQiao Reservoir Spillway
Description:
The ShiQiao Reservoir was built in the 1950s, whose main functions are irrigation and flood control.
With the increasing number of downstream agricultural water, the contradiction is increasingly prominent between pettier beneficial capacity and the raising downstream agricultural water; at the same time, due to the disrepair of spillway and the increase of upstream inflow, the original spillway flood discharge capacity cannot meet the requirements for flood control.
On the basis of systematical investigations of engineering geology and hydrogeological, an effective method is proposed for plain reservoirs to solve these problems.
The method is, by improving the weir crest elevation and widening spillway to address the inadequate of beneficial capacity and the low standard of flood control spillway.
Through the validation of analysis and calculation, this method is feasible and economical.
It fundamentally solves the problems of ShiQiao Reservoir, and ensures the safe operation of this reservoir.

Related Results

CFD analysis of flow over ogee spillway with varying upstream face slope
CFD analysis of flow over ogee spillway with varying upstream face slope
Abstract Spillway design plays a vital role in the management of water resources. Because of its high hydraulic performance and ability to transmit flows safely and ...
Assessment of Flood Risk Analysis in Selangor
Assessment of Flood Risk Analysis in Selangor
Flood events occur every year especially during the monsoon season. Although its consequences are not as disastrous as other natural disasters such as earthquakes and tornado storm...
Lithostratigraphy of the southeastern part of the Ethiopian flood basalt province
Lithostratigraphy of the southeastern part of the Ethiopian flood basalt province
Abstract Fully preserved continental flood basalt stratigraphy provides a perfect window to comprehend the temporal evolution and geological history of plume-related volcan...
Impact of Sedimentation Counter Measure on the Performance of Flood Control: A Case Study of Wonogiri Reservoir
Impact of Sedimentation Counter Measure on the Performance of Flood Control: A Case Study of Wonogiri Reservoir
The Wonogiri Reservoir with 1.343 km2 catchment area has a major problem of sedimentation. To overcome this issue, a new spillway has been built and closure dike is being construct...
Rotating characteristics of glow discharge filament on liquid electrode surface
Rotating characteristics of glow discharge filament on liquid electrode surface
Atmospheric pressure glow discharge above liquid electrode has extensive application potentials in biomedicine, chemical degradation,environmental protection,etc.In this paper,such...

Back to Top