Constant Bottomhole Pressure: Managed-Pressure Drilling Technique Applied in an Exploratory Well in Saudi Arabia
View through CrossRef
Abstract
The proposed well is an exploratory well where the formation pressures were estimated based on the experience in drilling offset wells in the area. The 8 3/8" and 5 7/8" hole sections, have a wide range of predicted pore pressure, indicating a considerable span of uncertainty in addition to other related conventional drilling problems as tight hole and gas influx. In previous wells drilled in the area, many drilling problems and wellbore stability issues were experienced. One of the possible cuases of the mechanical instability could be attributed to the large fluctuations in the bottom hole pressure that is intrinsic to conventional drilling practices. These fluctuations are originated from the stopping and starting of drilling fluid circulation during jointed pipe connections, specifically, they result from the fluctuation in the equivalent circulating density (ECD), which occurs when the pumps are turned on and off. This fluctuation could triger a kick-Loss scenario that increases the Non Productive Time (NPT). drilling-related flat time further indicate a necessity for a technology that enables more precise wellbore pressure management.
Constant Bottom Hole Pressure (CBHP) which is variation of MPD, is applicable to avoid changes in ECD by applying appropriate levels of surface backpressure, a technique that maintains constant bottom-hole pressure during the complete drilling operation. The primary objective of drilling this well using the Managed Pressured Drilling technology was to reach the target depth with minimum drilling complication, avoid uncontrolled event by maintaining a constant bottom hole pressure and properly managing the well in case an underbalanced condition occurs while drilling the 8 3/8" and 5 7/8" hole sections.
As with any advanced drilling technique, successful application of MPD technology required a detailed understanding of the potential benefits as well as limitations. This paper summarizes the process that was used to identify, plan, and implement MPD as a technology to drill the well to the target depth and prevent conventional. Planning and operational results are presented in this paper.
Title: Constant Bottomhole Pressure: Managed-Pressure Drilling Technique Applied in an Exploratory Well in Saudi Arabia
Description:
Abstract
The proposed well is an exploratory well where the formation pressures were estimated based on the experience in drilling offset wells in the area.
The 8 3/8" and 5 7/8" hole sections, have a wide range of predicted pore pressure, indicating a considerable span of uncertainty in addition to other related conventional drilling problems as tight hole and gas influx.
In previous wells drilled in the area, many drilling problems and wellbore stability issues were experienced.
One of the possible cuases of the mechanical instability could be attributed to the large fluctuations in the bottom hole pressure that is intrinsic to conventional drilling practices.
These fluctuations are originated from the stopping and starting of drilling fluid circulation during jointed pipe connections, specifically, they result from the fluctuation in the equivalent circulating density (ECD), which occurs when the pumps are turned on and off.
This fluctuation could triger a kick-Loss scenario that increases the Non Productive Time (NPT).
drilling-related flat time further indicate a necessity for a technology that enables more precise wellbore pressure management.
Constant Bottom Hole Pressure (CBHP) which is variation of MPD, is applicable to avoid changes in ECD by applying appropriate levels of surface backpressure, a technique that maintains constant bottom-hole pressure during the complete drilling operation.
The primary objective of drilling this well using the Managed Pressured Drilling technology was to reach the target depth with minimum drilling complication, avoid uncontrolled event by maintaining a constant bottom hole pressure and properly managing the well in case an underbalanced condition occurs while drilling the 8 3/8" and 5 7/8" hole sections.
As with any advanced drilling technique, successful application of MPD technology required a detailed understanding of the potential benefits as well as limitations.
This paper summarizes the process that was used to identify, plan, and implement MPD as a technology to drill the well to the target depth and prevent conventional.
Planning and operational results are presented in this paper.
Related Results
Pit Less Drilling Significantly Reduces Wells Environmental Footprint
Pit Less Drilling Significantly Reduces Wells Environmental Footprint
Abstract
Pit less Drilling technology is a technology that eliminates the requirement for earthen pits or sumps to capture waste fluid. In this paper we will examine...
Application of Innovative High Temperature Deep Pyrolysis Technology to Treat Drilling Cuttings Harmlessly in Tarim Basim
Application of Innovative High Temperature Deep Pyrolysis Technology to Treat Drilling Cuttings Harmlessly in Tarim Basim
Abstract
Due to high temperature, high pressure, and gypsum-salt formations in the Tian Mountain Front Block in Tarim Basin, the stability and rheology of traditiona...
Horizontal Re-entry Drilling With Coiled Tubing: A Viable Technology
Horizontal Re-entry Drilling With Coiled Tubing: A Viable Technology
Abstract
Horizontal drilling technology has been the fastest growing segment of the oil and gas industry over the last few years. With the diversity of reservoirs...
Horizontal Re-entry Drilling With Coiled Tubing: A Viable Technology
Horizontal Re-entry Drilling With Coiled Tubing: A Viable Technology
Abstract
Horizontal drilling technology has been the fastest growing segment of the oil and gas industry over the last few years. With the diversity of reservoirs...
Maximizing Extended Reach Drilling Efficiency with Unconventional Thinking
Maximizing Extended Reach Drilling Efficiency with Unconventional Thinking
Abstract
This case study outlines how drilling times and costs were reduced for an oilsands steam-assisted gravity drainage (SAGD) operation. It describes the primar...
A New Measurement While Drilling System Designed Specifically For Drilling Unconventional Wells
A New Measurement While Drilling System Designed Specifically For Drilling Unconventional Wells
Abstract
The recent drilling explosion targeting unconventional reservoirs has created extraordinary opportunities for growth in the oil industry and has also presen...
Data-Driven Optimization of Drilling Parameters
Data-Driven Optimization of Drilling Parameters
Abstract
A major challenge during drilling is to identify sub-formation change, enabling near-real-time adjustment of the drilling parameters to enhance performance....
Improvements In Deep Drilling Techniques
Improvements In Deep Drilling Techniques
This paper was prepared for the 1972 Deep Drilling Symposium of the Society of Petroleum Engineers of AIME, to be held in Amarillo, Texas, September 11–12, 1972. Permission to copy...