Perencanaan Rehabilitasi Drainase Ruas Jalan Telaga Warna Tlogomas Malang
View through CrossRef
The people of the Tlogomas sub-district, especially the residents of RT 07 RW 06, are facing the problem of rainwater inundation on the Telaga Warna road. Therefore the Tlogomas sub-district community needs competent personnel with Civil Engineering expertise and requires supporting equipment in terms of surveys and analysis equipment to plan drainage rehabilitation. This community service activity uses the AutoCAD program to apply topography measurement technology applications and drainage designs. The results of the topographic survey describe the longitudinal and transverse sections of the Telaga Warna road section. The cross-sectional design of the drainage channel using precast concrete/U-Gatter measuring 100x100 cm. From the calculation of the volume of drainage and rehabilitation needs for the Telaga Warna road section, a cost of Rp. 676,187,000,-. As a result of this community service activity, partners receive assistance in terms of planning so that a good and efficient implementation of the drainage rehabilitation plan is obtained.ABSTRAKMasyarakat kelurahan Tlogomas khususnya warga RT 07 RW 06 menghadapi permasalahan genangan air hujan di ruas jalan Telaga Warna. Oleh karena itu masyarakat kelurahan Tlogomas membutuhkan kompetensi personil yang mempunyai keahlian Teknik Sipil serta membutuhkan peralatan yang mendukung dalam hal survei maupun peralatan analisa untuk merencanakan rehabilitasi drainase. Tujuan dari kegiatan pengabdian kepada masyarakat ini adalah penerapan aplikasi teknologi pengukuran topografi serta desain drainase menggunakan program AutoCAD. Hasil survey topografi menggambarkan penampang memanjang dan melintang ruas jalan Telaga Warna. Serta desain penampang saluran drainase yang menggunakan beton precast/ U-Gatter ukuran 100x100 cm dari hasil perhitungan volume kebutuhan rehabilitasi drainase ruas jalan Telaga Warna dibutuhkan biaya sebesar Rp. 676.187.000,-. Hasil dari kegiatan pengabdian masyarakat ini, mitra memperoleh pendampingan dalam hal perencanaan sehingga diperoleh implementasi perencanaan rehabilitasi drainase yang baik dan efisien
Title: Perencanaan Rehabilitasi Drainase Ruas Jalan Telaga Warna Tlogomas Malang
Description:
The people of the Tlogomas sub-district, especially the residents of RT 07 RW 06, are facing the problem of rainwater inundation on the Telaga Warna road.
Therefore the Tlogomas sub-district community needs competent personnel with Civil Engineering expertise and requires supporting equipment in terms of surveys and analysis equipment to plan drainage rehabilitation.
This community service activity uses the AutoCAD program to apply topography measurement technology applications and drainage designs.
The results of the topographic survey describe the longitudinal and transverse sections of the Telaga Warna road section.
The cross-sectional design of the drainage channel using precast concrete/U-Gatter measuring 100x100 cm.
From the calculation of the volume of drainage and rehabilitation needs for the Telaga Warna road section, a cost of Rp.
676,187,000,-.
As a result of this community service activity, partners receive assistance in terms of planning so that a good and efficient implementation of the drainage rehabilitation plan is obtained.
ABSTRAKMasyarakat kelurahan Tlogomas khususnya warga RT 07 RW 06 menghadapi permasalahan genangan air hujan di ruas jalan Telaga Warna.
Oleh karena itu masyarakat kelurahan Tlogomas membutuhkan kompetensi personil yang mempunyai keahlian Teknik Sipil serta membutuhkan peralatan yang mendukung dalam hal survei maupun peralatan analisa untuk merencanakan rehabilitasi drainase.
Tujuan dari kegiatan pengabdian kepada masyarakat ini adalah penerapan aplikasi teknologi pengukuran topografi serta desain drainase menggunakan program AutoCAD.
Hasil survey topografi menggambarkan penampang memanjang dan melintang ruas jalan Telaga Warna.
Serta desain penampang saluran drainase yang menggunakan beton precast/ U-Gatter ukuran 100x100 cm dari hasil perhitungan volume kebutuhan rehabilitasi drainase ruas jalan Telaga Warna dibutuhkan biaya sebesar Rp.
676.
187.
000,-.
Hasil dari kegiatan pengabdian masyarakat ini, mitra memperoleh pendampingan dalam hal perencanaan sehingga diperoleh implementasi perencanaan rehabilitasi drainase yang baik dan efisien.
Related Results
Pendataan Ruas Jalan (Leger Jalan) pada Ruas Jalan Palembang - Betung
Pendataan Ruas Jalan (Leger Jalan) pada Ruas Jalan Palembang - Betung
AbstractAs national assets, roads are vital to establish the means of national development, especially in term of achieving balanced inter-regional development and equitable distri...
Analisa Ring Road Ngawi Sta 3+200- Sta 6+200 Kabupaten Ngawi Propinsi Jawa Timur
Analisa Ring Road Ngawi Sta 3+200- Sta 6+200 Kabupaten Ngawi Propinsi Jawa Timur
Proyek pembangunan jalan Ring Road Ngawi ini merupakan jalan alternatif untuk mengurangi kemacetan yang terjadi pada ruas jalan dari arah Surabaya menuju Solo dan sebaliknya. Proy...
Analisis Penerapan Jalan Satu Arah di Ruas Jalan Raya Leles-Jalan Lingkar Leles
Analisis Penerapan Jalan Satu Arah di Ruas Jalan Raya Leles-Jalan Lingkar Leles
Penelitian ini bertujuan untuk mengetahui penyebab kemacetan yang sering terjadi di ruas Jalan Raya Leles pada saat jam-jam sibuk dan mengetahui dampak penerapan jalan satu arah te...
ANALISA KERUSAKAN PERKERASAN LENTUR JALAN NIKI-NIKI - OENLASI
ANALISA KERUSAKAN PERKERASAN LENTUR JALAN NIKI-NIKI - OENLASI
Kinerja jalan sebagai prasarana transportasi darat merupakan faktor yang sangat penting dalam bidang perhubungan terutama untuk kesinambungan distribusi barang dan jasa. Kinerja in...
ANALISIS KINERJA RUAS JALAN DI WILAYAH PUSAT KOTA STUDI KASUS ( RUAS JALANANDI DJEMMA EX. JALAN JENDERAL SUDIRMAN KOTA PALOPO
ANALISIS KINERJA RUAS JALAN DI WILAYAH PUSAT KOTA STUDI KASUS ( RUAS JALANANDI DJEMMA EX. JALAN JENDERAL SUDIRMAN KOTA PALOPO
Dalam menentukan kinerja lalulintas pada ruas jalan Andi Djemma ex. Jalan Jenderal Sudirman Kota Palopo dapat digunakan beberapa populasi variabel utama, yaitu volume, kecepatan, k...
Pengaruh Gerak U-Turn pada Bukaan Median terhadap Karakteristik Arus Lalu Lintas di Ruas Jalan Jenderal Ahmad Yani Kabupaten Ketapang
Pengaruh Gerak U-Turn pada Bukaan Median terhadap Karakteristik Arus Lalu Lintas di Ruas Jalan Jenderal Ahmad Yani Kabupaten Ketapang
Jalan Jenderal Ahmad Yani Kabupaten Ketapang merupakan jalan arteri dengan tipe lingkungan yaitu komersial dan terdapat hambatan samping yang berdampak terhadap kinerja lalu lintas...
ANALISIS KERUSAKAN JALAN DENGAN MENGGUNAKAN METODE PCI (PAVEMENT CONDITION INDEX), DAN SDI (SURFACE DISTRESS INDEX) Studi Kasus: Jalan Yasmin Raya, Taman Yasmin, Bogor
ANALISIS KERUSAKAN JALAN DENGAN MENGGUNAKAN METODE PCI (PAVEMENT CONDITION INDEX), DAN SDI (SURFACE DISTRESS INDEX) Studi Kasus: Jalan Yasmin Raya, Taman Yasmin, Bogor
Jalan adalah infrastruktur yang sangat penting dalam kehidupan manusia, jalan merupakan bagian dari infrastruktur transportasi yang digunakan untuk menghubungkan suatu tempat ke te...
EVALUASI DAN PERENCANAAN SALURAN DRAINASE PROYEK SPBU JALAN SILIWANGI RANGKASBITUNG – BANTEN
EVALUASI DAN PERENCANAAN SALURAN DRAINASE PROYEK SPBU JALAN SILIWANGI RANGKASBITUNG – BANTEN
Pembangunan suatu SPBU memerlukan perencanaan saluran drainase baik bagi keperluan
drainase dalam SPBU maupun untuk keperluan drainase lingkungan. Drainase lingkungan
d...