Abstract
Operational since 26th December 2020 on Saudi Aramco's premises in Qurayyah (KSA), TVP Solar thermal plant has been conceived as a sizeable industrial pilot for Saudi Aramco to show the potential of energy and CO2 savings offered by the solar thermal technology of the Swiss company TVP Solar.
Because of its proven performances, Qurayyah's TVP thermal solar plant has been awarded in 2021 with the Environment Excellence Award assigned to the See Water Injection Department (SWID) within Saudi Aramco and with the Energy Efficiency Award assigned both to SWID and the Research and Development Center (R&DC).
Qurayyah's TVP Solar plant has been engineered to preheat from 93 °C up to 174 °C the water fed to a set of two diesel fueled boilers used to generate steam.
Experience gained in Qurayyah shows that at this location 1 MW of peak thermal power requires 1,700 m2 of TVP Solar collectors (for about 3,000 m2 of total occupation space) to produce 1.5 GWhT/year, thus reducing fuel consumption by 200 m3/year of diesel and avoiding 520 tons/year of CO2 emissions. The specific ability of TVP Solar collectors to harvest energy from diffuse light allowed the solar field to have its performance minimally impacted by fouling, even if the panels were never cleaned during more than one year of operations.
Title: Saudi Aramco Awards Winning Project
Description:
Abstract
Operational since 26th December 2020 on Saudi Aramco's premises in Qurayyah (KSA), TVP Solar thermal plant has been conceived as a sizeable industrial pilot for Saudi Aramco to show the potential of energy and CO2 savings offered by the solar thermal technology of the Swiss company TVP Solar.
Because of its proven performances, Qurayyah's TVP thermal solar plant has been awarded in 2021 with the Environment Excellence Award assigned to the See Water Injection Department (SWID) within Saudi Aramco and with the Energy Efficiency Award assigned both to SWID and the Research and Development Center (R&DC).
Qurayyah's TVP Solar plant has been engineered to preheat from 93 °C up to 174 °C the water fed to a set of two diesel fueled boilers used to generate steam.
Experience gained in Qurayyah shows that at this location 1 MW of peak thermal power requires 1,700 m2 of TVP Solar collectors (for about 3,000 m2 of total occupation space) to produce 1.
5 GWhT/year, thus reducing fuel consumption by 200 m3/year of diesel and avoiding 520 tons/year of CO2 emissions.
The specific ability of TVP Solar collectors to harvest energy from diffuse light allowed the solar field to have its performance minimally impacted by fouling, even if the panels were never cleaned during more than one year of operations.
Related Results
Implementation of Saudi Aramco's SDGS to Preserve the Environment in Meeting Global Energy Needs
Implementation of Saudi Aramco's SDGS to Preserve the Environment in Meeting Global Energy Needs
The Sustainable Development Goals (SDGs) have become a key guide for global organisations to preserve the environment while meeting global energy needs. Saudi Aramco, one of the wo...
Money, prestige, publicity Literary awards and awards in Sweden 1786-2009
Money, prestige, publicity Literary awards and awards in Sweden 1786-2009
Jerry Määttä, Pengar, prestige, publicitet. Litterära priser och utmärkelser i Sverige 1786–2009 (Pay, Prestige, Publicity: Literary Prizes and Awards in Sweden, 1786–2009)The aim ...
The Integration of Drilling Sensor Real-Time Data with Drilling Reporting Data at Saudi Aramco using WITSML
The Integration of Drilling Sensor Real-Time Data with Drilling Reporting Data at Saudi Aramco using WITSML
Abstract
The Wellsite Information Transfer Standard Markup Language (WITSML) is a global open standard for the exchange of geotechnical data in the upstream oil and ...
Hawiyah NGL Recovery Project: Operational Considerations during Project Design
Hawiyah NGL Recovery Project: Operational Considerations during Project Design
ABSTRACT
Saudi Aramco new NGL Recovery Project has been managed by an integrated team from project managements and proponent. Project management team members have...
Production Water Management
Production Water Management
R.W. Hintermaier, SPE, Saudi Arabian Oil Company (Saudi Aramco)
Abstract
Since 1979, water produced from Saudi Aramco's largest ...
Low BTU Gas Monetisation Technology Commercial Evaluation
Low BTU Gas Monetisation Technology Commercial Evaluation
Abstract
Natural gas is normally composed of three types of group components; i.e., hydrocarbons, inert and sour components.
The natural gas hyd...
Safaniya Lagoon Biodiversity Sanctuary
Safaniya Lagoon Biodiversity Sanctuary
Among the many goals of environmental management in Saudi Aramco, protection of special environmental areas is recognized as high priority to both the company and the Kingdom of Sa...
Bouncing Back- KhPD's Story of Resilience and Recovery from the 2019 Attack
Bouncing Back- KhPD's Story of Resilience and Recovery from the 2019 Attack
Abstract
The Khurais Central Processing Facility (CPF), a cornerstone of Saudi Aramco's oil production infrastructure, sufferred adron attack on September 14, 2019, ...