Javascript must be enabled to continue!
Role of geogrids in load transfer of pile-supported embankments
View through CrossRef
A series of physical model tests on a geosynthetic-reinforced pile-supported (GRPS) embankment were performed in the laboratory to investigate the role of a geogrid on the load transferred to the pile-supported embankment. Two geogrid types, which differ in tensile stiffness by a factor of 2, were used to study the effects of geogrid stiffness. Different embankment configurations having different total embankment heights were employed so as to allow a comparison of the effects of different relative settlements between the soft soil and the piles. From the test results, it was shown that the relative settlement between the soft soil and the piles is necessary to form soil arching. In particular, when the embankment was geogrid-reinforced, the additional vertical stress transferred to the piles by the reinforcement with the geogrid became significant only when this relative settlement was sufficiently allowed. Furthermore, a larger additional vertical stress transferred to the piles was achieved by reinforcement with a stiffer geogrid. However, the difference in the vertical stresses transferred to the piles was substantially smaller than the difference in the geogrid stiffness.
Title: Role of geogrids in load transfer of pile-supported embankments
Description:
A series of physical model tests on a geosynthetic-reinforced pile-supported (GRPS) embankment were performed in the laboratory to investigate the role of a geogrid on the load transferred to the pile-supported embankment.
Two geogrid types, which differ in tensile stiffness by a factor of 2, were used to study the effects of geogrid stiffness.
Different embankment configurations having different total embankment heights were employed so as to allow a comparison of the effects of different relative settlements between the soft soil and the piles.
From the test results, it was shown that the relative settlement between the soft soil and the piles is necessary to form soil arching.
In particular, when the embankment was geogrid-reinforced, the additional vertical stress transferred to the piles by the reinforcement with the geogrid became significant only when this relative settlement was sufficiently allowed.
Furthermore, a larger additional vertical stress transferred to the piles was achieved by reinforcement with a stiffer geogrid.
However, the difference in the vertical stresses transferred to the piles was substantially smaller than the difference in the geogrid stiffness.
Related Results
Slope stability enhancements through soil arching
Slope stability enhancements through soil arching
Earth embankments built over soft foundations require the use of ground improvement measures of the foundation such as installation of rigid inclusions or piles. The vertical piles...
Analysis Of Three-Dimensional Pile Groups With Nonlinear Soil Response And Pile-Soil-Pile Interaction
Analysis Of Three-Dimensional Pile Groups With Nonlinear Soil Response And Pile-Soil-Pile Interaction
ABSTRACT
Present methods of pile group analysis are either limited to special geometric cases or do not consider pile-soil-pile interaction. An analytical procedu...
Model Test of Jacked Pile Penetration Process Considering Influence of Pile Diameter
Model Test of Jacked Pile Penetration Process Considering Influence of Pile Diameter
In order to investigate the influence of different diameters on pile end resistance, pile side resistance, pile axial force and pile force transmission law of jacked pile penetrati...
Anchor-PiIe Design for Ocean-FIoor Environments Using Finite-Element Analysis
Anchor-PiIe Design for Ocean-FIoor Environments Using Finite-Element Analysis
ABSTRACT
This paper analyzes some aspects of anchor-pile design for marine environments, using a finite-element mathematical model of the pile, soil, and the pile...
Simplified Heat Transfer Model for Spiral‐Coil Energy Pile Groups and the Pile–Pile Thermal Interference
Simplified Heat Transfer Model for Spiral‐Coil Energy Pile Groups and the Pile–Pile Thermal Interference
ABSTRACTThe spiral heat exchanger of the energy pile groups is divided into multiple segments. Each heat exchanger segment is regarded as a three‐dimensional spiral heat source of ...
A New Mechanical Pile Connector Speeds Offshore Contruction Projects
A New Mechanical Pile Connector Speeds Offshore Contruction Projects
Abstract
During the past year, a new mechanical pile connector has been introduced to the offshore construction industry. This connector has been the culmination ...
Pile–Soil Interaction and Group Pile Effect in Composite Foundation Under Different Pile Length Conditions
Pile–Soil Interaction and Group Pile Effect in Composite Foundation Under Different Pile Length Conditions
With the rapid development of urbanization and infrastructure construction, the requirements for the foundation design of high-rise buildings and large bridges are increasing. Pile...
Pile Driving Measurements On The Heather Platform Installation
Pile Driving Measurements On The Heather Platform Installation
Abstract
The first leg piles of the Heather Platform were instrumented using strain transducers and accelerometers that were attached to the pile just below its t...

