Role of geogrids in load transfer of pile-supported embankments

View through CrossRef
A series of physical model tests on a geosynthetic-reinforced pile-supported (GRPS) embankment were performed in the laboratory to investigate the role of a geogrid on the load transferred to the pile-supported embankment. Two geogrid types, which differ in tensile stiffness by a factor of 2, were used to study the effects of geogrid stiffness. Different embankment configurations having different total embankment heights were employed so as to allow a comparison of the effects of different relative settlements between the soft soil and the piles. From the test results, it was shown that the relative settlement between the soft soil and the piles is necessary to form soil arching. In particular, when the embankment was geogrid-reinforced, the additional vertical stress transferred to the piles by the reinforcement with the geogrid became significant only when this relative settlement was sufficiently allowed. Furthermore, a larger additional vertical stress transferred to the piles was achieved by reinforcement with a stiffer geogrid. However, the difference in the vertical stresses transferred to the piles was substantially smaller than the difference in the geogrid stiffness.
Title: Role of geogrids in load transfer of pile-supported embankments
Description:
A series of physical model tests on a geosynthetic-reinforced pile-supported (GRPS) embankment were performed in the laboratory to investigate the role of a geogrid on the load transferred to the pile-supported embankment.
Two geogrid types, which differ in tensile stiffness by a factor of 2, were used to study the effects of geogrid stiffness.
Different embankment configurations having different total embankment heights were employed so as to allow a comparison of the effects of different relative settlements between the soft soil and the piles.
From the test results, it was shown that the relative settlement between the soft soil and the piles is necessary to form soil arching.
In particular, when the embankment was geogrid-reinforced, the additional vertical stress transferred to the piles by the reinforcement with the geogrid became significant only when this relative settlement was sufficiently allowed.
Furthermore, a larger additional vertical stress transferred to the piles was achieved by reinforcement with a stiffer geogrid.
However, the difference in the vertical stresses transferred to the piles was substantially smaller than the difference in the geogrid stiffness.

Related Results

Slope stability enhancements through soil arching
Slope stability enhancements through soil arching
Earth embankments built over soft foundations require the use of ground improvement measures of the foundation such as installation of rigid inclusions or piles. The vertical piles...
Analysis Of Three-Dimensional Pile Groups With Nonlinear Soil Response And Pile-Soil-Pile Interaction
Analysis Of Three-Dimensional Pile Groups With Nonlinear Soil Response And Pile-Soil-Pile Interaction
ABSTRACT Present methods of pile group analysis are either limited to special geometric cases or do not consider pile-soil-pile interaction. An analytical procedu...
Simplified Heat Transfer Model for Spiral‐Coil Energy Pile Groups and the Pile–Pile Thermal Interference
Simplified Heat Transfer Model for Spiral‐Coil Energy Pile Groups and the Pile–Pile Thermal Interference
ABSTRACTThe spiral heat exchanger of the energy pile groups is divided into multiple segments. Each heat exchanger segment is regarded as a three‐dimensional spiral heat source of ...
Pile–Soil Interaction and Group Pile Effect in Composite Foundation Under Different Pile Length Conditions
Pile–Soil Interaction and Group Pile Effect in Composite Foundation Under Different Pile Length Conditions
With the rapid development of urbanization and infrastructure construction, the requirements for the foundation design of high-rise buildings and large bridges are increasing. Pile...
Contact between Prefabricated Pile and Pile Clamping Jaws under Pile Driving
Contact between Prefabricated Pile and Pile Clamping Jaws under Pile Driving
Pile clamping mechanism with hydraulic static pile driver has advantages of convenient for the design, improvement and use. The maximum transmission pile driving force of pile clam...
Cometary Physics Laboratory: spectrophotometric experiments
Cometary Physics Laboratory: spectrophotometric experiments
<p><strong><span dir="ltr" role="presentation">1. Introduction</span></strong&...
A procedure to determine resistance factors for a newly developed rotation steel pile
A procedure to determine resistance factors for a newly developed rotation steel pile
The aim of this study is to establish a procedure to determine resistance factors for newly developed pile products through an example of the rotational intrusion steel pile (RI pi...
A Procedure to Determine Resistance Factors for a Newly Developed Rotation Steel Pile
A Procedure to Determine Resistance Factors for a Newly Developed Rotation Steel Pile
The aim of this study is to establish a procedure to determine resistance factors for newly developed pile products through an example of the rotational intrusion steel pile (RI pi...