Javascript must be enabled to continue!
Cost benefit analysis of applying PHM for Subsea Applications
View through CrossRef
The decrease in oil price has been a hot topic over recent years and has directly affected oil companies and original equipment manufacturers (OEMs) of systems used for oil production (subsea assets in particular). Numerous technologies, methodologies, processes and tools are being developed to support lifecycle cost reductions for subsea assets and to maximize the overall profits for the industry. Prognostic and Health Management (PHM) is a technology that can assess and predict the remaining useful life (RUL) of a system, enabling operations and maintenance strategies to be better planned. One goal of PHM is to lower the cost for a system during the operational period by reducing the downtime cost and risk of unanticipated failures. Traditionally, failure was accepted in this industry sector through the incorporation of functional safety features of critical components. Unfortunately, a fail-safe strategy has significant downtime costs associated with it. However, introduction of new technology (e.g. PHM) requires a business case to demonstrate the potential benefits. At present there is a lack of literature on the topic of PHM cost-benefit-risk analysis for subsea production systems. This paper will provide a background of lifecycle cost and the potential cost savings PHM can deliver in the subsea application will be provided. The paper will also expand on four categories of factors contributing to the cost benefit analysis as well as a case study to illustrate the potential cost savings and the side-effects from PHM integration on subsea equipment.
Title: Cost benefit analysis of applying PHM for Subsea Applications
Description:
The decrease in oil price has been a hot topic over recent years and has directly affected oil companies and original equipment manufacturers (OEMs) of systems used for oil production (subsea assets in particular).
Numerous technologies, methodologies, processes and tools are being developed to support lifecycle cost reductions for subsea assets and to maximize the overall profits for the industry.
Prognostic and Health Management (PHM) is a technology that can assess and predict the remaining useful life (RUL) of a system, enabling operations and maintenance strategies to be better planned.
One goal of PHM is to lower the cost for a system during the operational period by reducing the downtime cost and risk of unanticipated failures.
Traditionally, failure was accepted in this industry sector through the incorporation of functional safety features of critical components.
Unfortunately, a fail-safe strategy has significant downtime costs associated with it.
However, introduction of new technology (e.
g.
PHM) requires a business case to demonstrate the potential benefits.
At present there is a lack of literature on the topic of PHM cost-benefit-risk analysis for subsea production systems.
This paper will provide a background of lifecycle cost and the potential cost savings PHM can deliver in the subsea application will be provided.
The paper will also expand on four categories of factors contributing to the cost benefit analysis as well as a case study to illustrate the potential cost savings and the side-effects from PHM integration on subsea equipment.
Related Results
A Reference Stack for PHM Architectures
A Reference Stack for PHM Architectures
This paper suggests a reference model for PHM processes that aids the customer of PHM in developing a business case for adopting PHM in his or her supply chain...
Subsea Factory–Standardization of the Brownfield Factory
Subsea Factory–Standardization of the Brownfield Factory
Abstract
As part of the corporate technology strategy Statoil has launched a technology plan for the Subsea Factory concept. The plan describes how to combine subsea...
Ormen Lange Subsea Production System
Ormen Lange Subsea Production System
Abstract
This paper presents the concept and the technical solutions developed and applied to the Ormen Lange subsea production system. First, the key technical c...
Subsea Facilities
Subsea Facilities
Abstract
This paper presents the system design and concept solutions selected for the Ormen Lange subsea facilities.
The field is located in a r...
Implementing Deepwater Subsea Reliability Strategy
Implementing Deepwater Subsea Reliability Strategy
Abstract
For more than a decade, subsea technology has been perceived as delivering innovative, reliable and cost effective solutions to oil & gas exploitatio...
Subsea Concept Alternatives for Brazilian Pre-Salt Fields
Subsea Concept Alternatives for Brazilian Pre-Salt Fields
The objective is to identify and compare subsea development concept alternatives for typical Brazilian pre-salt deep water applications, based on generic system functional requirem...
Systems Engineering Approach to PHM in Aerospace
Systems Engineering Approach to PHM in Aerospace
Systems engineering approaches to PHM are established by first capturing the right data. Understanding prominent component failure modes and their system level effects allows engin...
Subsea Production Controls-The Trend Toward Simplification
Subsea Production Controls-The Trend Toward Simplification
Abstract
Control of subsea wellheads has evolved from the earliest diver operated wellheads to systems involving sophisticated electro-hydraulic techniques. With ...

