Javascript must be enabled to continue!
Determining Circulating Fluid Temperature in Drilling, Workover, and Well Control Operations
View through CrossRef
Summary
Estimation of fluid temperature in both flow conduits (drillpipe or tubing and the annulus) is required to ascertain the fluid density and viscosity and, in turn, to calculate the pressure drop or the maximum allowable pumping rate for a number of operations. These operations include drilling, workover, and well control. The fluid temperature estimation becomes critical for high-temperature or geothermal reservoirs where significant heat exchange occurs or when fluid properties are temperature sensitive, such as for a non-Newtonian fluid.
In this work, we present an analytical model for the flowing fluid temperature in the drillpipe/tubing and in the annulus as a function of well depth and circulation time. The model is based on an energy balance between the formation and the fluid in the drillpipe/tubing and annulus. Steady-state heat transfer is assumed in the wellbore while transient heat transfer takes place in the formation. Solutions are obtained for two possible scenarios: (1) the fluid flows down the annulus and up the drillpipe/tubing, and (2) the fluid flows down the tubing and up the annulus. The analytic model developed is cast in a set of simple algebraic equations for rapid implementation. We also show that the maximum temperature occurs not at the well bottom, but at some distance higher from the bottom for flow up the annulus.
The solution approach is flexible enough to use the formation temperature distribution function, TD, developed by various authors. A limited sensitivity study shows that all the TD models give comparable solutions, with the exception of line-source solution at early times.
Society of Petroleum Engineers (SPE)
Title: Determining Circulating Fluid Temperature in Drilling, Workover, and Well Control Operations
Description:
Summary
Estimation of fluid temperature in both flow conduits (drillpipe or tubing and the annulus) is required to ascertain the fluid density and viscosity and, in turn, to calculate the pressure drop or the maximum allowable pumping rate for a number of operations.
These operations include drilling, workover, and well control.
The fluid temperature estimation becomes critical for high-temperature or geothermal reservoirs where significant heat exchange occurs or when fluid properties are temperature sensitive, such as for a non-Newtonian fluid.
In this work, we present an analytical model for the flowing fluid temperature in the drillpipe/tubing and in the annulus as a function of well depth and circulation time.
The model is based on an energy balance between the formation and the fluid in the drillpipe/tubing and annulus.
Steady-state heat transfer is assumed in the wellbore while transient heat transfer takes place in the formation.
Solutions are obtained for two possible scenarios: (1) the fluid flows down the annulus and up the drillpipe/tubing, and (2) the fluid flows down the tubing and up the annulus.
The analytic model developed is cast in a set of simple algebraic equations for rapid implementation.
We also show that the maximum temperature occurs not at the well bottom, but at some distance higher from the bottom for flow up the annulus.
The solution approach is flexible enough to use the formation temperature distribution function, TD, developed by various authors.
A limited sensitivity study shows that all the TD models give comparable solutions, with the exception of line-source solution at early times.
Related Results
Research on Protecting Formation Low-Damage Workover Fluid in Low Permeability Reservoir
Research on Protecting Formation Low-Damage Workover Fluid in Low Permeability Reservoir
During the workover treatment process, poorly compatible workover fluids infiltrating into reservoir could cause serious formation damage. To tackle the aformentioned issues, in th...
Pit Less Drilling Significantly Reduces Wells Environmental Footprint
Pit Less Drilling Significantly Reduces Wells Environmental Footprint
Abstract
Pit less Drilling technology is a technology that eliminates the requirement for earthen pits or sumps to capture waste fluid. In this paper we will examine...
Workover/Well Intervention and Regulatory Challenges
Workover/Well Intervention and Regulatory Challenges
Abstract
Historically classification of ships was introduced for the maritime industry. This was back in the 18th. Century when all ships had very similar tasks. ...
MEGATHYST - A Compact Dynamically Positioned Semisub for Deep Waters
MEGATHYST - A Compact Dynamically Positioned Semisub for Deep Waters
Abstract
MSV Amethyst is a compact, fully Dynamically Positioned semisub, designed for workover on subsea wells in the North Sea, supplied in 1987. In 1996 a new ...
Completion And Workover Well Control Needs Are Different!
Completion And Workover Well Control Needs Are Different!
Abstract
Applying blowout prevention concepts that have been developed for drilling operations to a completion/workover situation is improper in many cases. In fa...
Recent Innovations in Offshore Completion and Workover Systems
Recent Innovations in Offshore Completion and Workover Systems
ABSTRACT
Humble Oil &Refining Company has developed an offshore completion and workover system, for use with multi-well fixed platform development, which util...
Application of Innovative High Temperature Deep Pyrolysis Technology to Treat Drilling Cuttings Harmlessly in Tarim Basim
Application of Innovative High Temperature Deep Pyrolysis Technology to Treat Drilling Cuttings Harmlessly in Tarim Basim
Abstract
Due to high temperature, high pressure, and gypsum-salt formations in the Tian Mountain Front Block in Tarim Basin, the stability and rheology of traditiona...
Lessons Learned in Drilling Pre-Salt Wells With Water Based Muds
Lessons Learned in Drilling Pre-Salt Wells With Water Based Muds
Abstract
Drilling operations in salt zones have gained importance in Brazil due to the discovery of large oil and gas reserves in the Pre-Salt area. Thus, the pur...

