SAVING RESOURCES IN THE CONSTRUCTION OF HYDROELECTRIC POWER PLANTS
View through CrossRef
The article describes run-of-the-river hydroelectric power plants. The authors specify the importance of performing technical and economic calculations in justifying the large-sized units of the water-supplying channel of a run-of-the-river hydroelectric power plant: turbine pits and suction (discharge) pipes. The study shows that the amount of construction work and the total cost of building a hydroelectric power plant depend on the size of these water supply units. The research objective is to analyze the validity of establishing the main dimensions of the suction pipes for modern technical and economic conditions. The researchers use the discounted income method. The calculations are performed for a hydroelectric power plant with an elbow suction pipe. The analysis of how the operating conditions of a hydroelectric power plant influence the savings of construction resources is carried out. The analysis shows that saving construction resources by reducing the length of the suction pipe is justified if the hydroelectric power plamt is designed to work only at peak power loads. For hydroelectric power plants operating at semi-peak or base power loads, the additional construction costs would be appropriate if leading to the decrease in pressure loss and to the increase in electricity generation.
Title: SAVING RESOURCES IN THE CONSTRUCTION OF HYDROELECTRIC POWER PLANTS
Description:
The article describes run-of-the-river hydroelectric power plants.
The authors specify the importance of performing technical and economic calculations in justifying the large-sized units of the water-supplying channel of a run-of-the-river hydroelectric power plant: turbine pits and suction (discharge) pipes.
The study shows that the amount of construction work and the total cost of building a hydroelectric power plant depend on the size of these water supply units.
The research objective is to analyze the validity of establishing the main dimensions of the suction pipes for modern technical and economic conditions.
The researchers use the discounted income method.
The calculations are performed for a hydroelectric power plant with an elbow suction pipe.
The analysis of how the operating conditions of a hydroelectric power plant influence the savings of construction resources is carried out.
The analysis shows that saving construction resources by reducing the length of the suction pipe is justified if the hydroelectric power plamt is designed to work only at peak power loads.
For hydroelectric power plants operating at semi-peak or base power loads, the additional construction costs would be appropriate if leading to the decrease in pressure loss and to the increase in electricity generation.
Related Results
Potential of Micro Hydroelectric Generator Embedded at 30,000 PE Effluent Discharge of Sewerage Treatment Plant
Potential of Micro Hydroelectric Generator Embedded at 30,000 PE Effluent Discharge of Sewerage Treatment Plant
A micro hydroelectric generator is an energy conversion approach to generate electricity from potential (motion) energy to an electrical energy. In this research, it is desired to ...
PENGARUH SUKU BUNGA DAN PENDAPATAN PERKAPITA TERHADAP TABUNGAN DI KABUPATEN BANYUMAS
PENGARUH SUKU BUNGA DAN PENDAPATAN PERKAPITA TERHADAP TABUNGAN DI KABUPATEN BANYUMAS
The Research that entitled “The Influence of Interest Rate and Earnings Percapita To Saving In Banyumas Regency”. Data that used are secondary data : interest rate of deposit at pu...
[RETRACTED] Keto Max Power - BURN FATINSTEAD OF CARBS with Keto Max Power! v1
[RETRACTED] Keto Max Power - BURN FATINSTEAD OF CARBS with Keto Max Power! v1
[RETRACTED]Keto Max Power Reviews: Warning! Don’t Buy Dragons Den Pills Fast Until You Read This UK Latest Report Weight gain’s principle of “energy intake exceeding energy spent”...
Recreating Prometheus
Recreating Prometheus
Prometheus, chained to a rock, having his liver pecked out by a great bird only for the organ to grow back again each night so that the torture may be repeated afresh the next day ...
Fabrication and Characterization of Floating Small Hydroelectric Power Generator using Spiral Water Wheel
Fabrication and Characterization of Floating Small Hydroelectric Power Generator using Spiral Water Wheel
For the practical application of small hydroelectric power generation, the authors designed a floating small hydroelectric power generation system equipped with a float, and fabric...
A new energy-saving block and invisible multiribbed frame structure
A new energy-saving block and invisible multiribbed frame structure
Purpose
Based on the conceptual design of seismic resistance in buildings, this study aims to put forward a new construction structure energy-saving block structure with invisible ...
ANALYSIS OF THE OPERATION MODE OF THE SOLAR POWER PLANT
ANALYSIS OF THE OPERATION MODE OF THE SOLAR POWER PLANT
The article examines the load change schedule of the solar power plant in the Ukraine-Moldova energy union. The analysis of data averaged at minute and 15-minute intervals in the p...
Desa Pekerja Bangunan: Pemberdayaan Masyarakat Menuju Desa Penghasil Pekerja Bangunan Profesional Dan Bersertifikat Dengan Pemasaran Jasa Online Di Kelurahan Gunungpati
Desa Pekerja Bangunan: Pemberdayaan Masyarakat Menuju Desa Penghasil Pekerja Bangunan Profesional Dan Bersertifikat Dengan Pemasaran Jasa Online Di Kelurahan Gunungpati
The needs of construction workers play a very important role in society. However, based on the results of a survey of several construction workers from Gunungpati Village, problems...