Environmentally Friendly Subsea Pipeline Decommissioning

View through CrossRef
Abstract Objectives/Scope Subsea pipeline decommissioning for either abandonment or retrieval is hazardous for both divers and the marine environment. This presentation reports on the development of a Fast Intervention Tool (FIT) for pipeline decommissioning by Webtool with input from Chevron Energy Technology Company. The FIT reduces the risks to divers and enables a quicker operation while avoiding the need for a containment dome during pipeline cutting and retrieval. Methods, Procedures, Process Sophisticated measures are taken to reduce the hazards to divers and the impact on the marine environment during pipeline decommissioning. Yet, traditional cutting technologies can undermine these best intentions. Diamond wire or other types of saw are time consuming and prone to jamming as the pipe moves during the cut. The containment dome used to catch contaminants that leach out during cutting and retrieval cannot "follow" the pipe as it is retrieved via a crane, therefore additional measures are needed to plug or seal to the pipe end before retrieval. The Fast Intervention Tool presented here addresses these shortcomings. Results, Observations, Conclusions The FIT combines lifting, crimping, injection and cutting in a single deployment frame which also contains the hydraulic control system. Deployed using a barge crane, the FIT assembly is lowered over a pipeline on the seabed, with either a diver or ROV to position it. The FIT cycle time to lift, crimp, inject sealant and cut is under 1 hour (excluding vessel or set up time) after which the pipe can now be safely recovered topside without leakage. The spike injector and blades will perform a number of cycles, therefore running costs are low; the only major consumable cost is the sealant itself. Webtool has completed FIT conceptual design and in-house development and testing and is now preparing a working prototype for hyperbaric and sea trials. Novel/Additive Information Safer and more environmentally friendly method of pipeline decommissioning.
Title: Environmentally Friendly Subsea Pipeline Decommissioning
Description:
Abstract Objectives/Scope Subsea pipeline decommissioning for either abandonment or retrieval is hazardous for both divers and the marine environment.
This presentation reports on the development of a Fast Intervention Tool (FIT) for pipeline decommissioning by Webtool with input from Chevron Energy Technology Company.
The FIT reduces the risks to divers and enables a quicker operation while avoiding the need for a containment dome during pipeline cutting and retrieval.
Methods, Procedures, Process Sophisticated measures are taken to reduce the hazards to divers and the impact on the marine environment during pipeline decommissioning.
Yet, traditional cutting technologies can undermine these best intentions.
Diamond wire or other types of saw are time consuming and prone to jamming as the pipe moves during the cut.
The containment dome used to catch contaminants that leach out during cutting and retrieval cannot "follow" the pipe as it is retrieved via a crane, therefore additional measures are needed to plug or seal to the pipe end before retrieval.
The Fast Intervention Tool presented here addresses these shortcomings.
Results, Observations, Conclusions The FIT combines lifting, crimping, injection and cutting in a single deployment frame which also contains the hydraulic control system.
Deployed using a barge crane, the FIT assembly is lowered over a pipeline on the seabed, with either a diver or ROV to position it.
The FIT cycle time to lift, crimp, inject sealant and cut is under 1 hour (excluding vessel or set up time) after which the pipe can now be safely recovered topside without leakage.
The spike injector and blades will perform a number of cycles, therefore running costs are low; the only major consumable cost is the sealant itself.
Webtool has completed FIT conceptual design and in-house development and testing and is now preparing a working prototype for hyperbaric and sea trials.
Novel/Additive Information Safer and more environmentally friendly method of pipeline decommissioning.

Related Results

Subsea Pipelines and Flowlines Decommissioning: What We Should Know for a Rational Approach
Subsea Pipelines and Flowlines Decommissioning: What We Should Know for a Rational Approach
Offshore and subsea decommissioning will increase in the next five years or so as many producing fields are matured and cease production while the oil price continues to remain low...
Subsea Factory–Standardization of the Brownfield Factory
Subsea Factory–Standardization of the Brownfield Factory
Abstract As part of the corporate technology strategy Statoil has launched a technology plan for the Subsea Factory concept. The plan describes how to combine subsea...
Ormen Lange Subsea Production System
Ormen Lange Subsea Production System
Abstract This paper presents the concept and the technical solutions developed and applied to the Ormen Lange subsea production system. First, the key technical c...
Subsea Facilities
Subsea Facilities
Abstract This paper presents the system design and concept solutions selected for the Ormen Lange subsea facilities. The field is located in a r...
Current Situation and Development Trend of Decommissioning of Nuclear Power Plants
Current Situation and Development Trend of Decommissioning of Nuclear Power Plants
Abstract The complete life of a nuclear power plant consists of three stages: construction, operation and decommissioning. In the last stage of the operation life of...
Collaborations Involving Malaysia Upstream Regulator to Enhance Decommissioning
Collaborations Involving Malaysia Upstream Regulator to Enhance Decommissioning
Abstract This paper aims to share the collaboration efforts of Malaysia's governing body for Upstream oil & gas industry with various stakeholders to enhance dec...
Seismic Vulnerability of the Subsea Pipeline
Seismic Vulnerability of the Subsea Pipeline
Abstract Unburied marine pipeline vulnerability under seismic impact, a new approach of investigation, and conclusion / recommendations for certain analyzed cases...
Installation Analysis of Matterhorn Pipeline Replacement
Installation Analysis of Matterhorn Pipeline Replacement
Abstract The paper describes the installation analysis for the Matterhorn field pipeline replacement, located in water depths between 800-ft to 1200-ft in the Gul...