Measurement and Simulation of Hydro-Generator’s Asynchronous Operation
View through CrossRef
The extended testing of hydro-generator with Pelton turbine (rated 35 MVA) was performed on a generator whose lifespan expired and it was going to be replaced. This was the perfect opportunity to do some specific and uncommon testing. The complex testing plan was designed in order to enable recording of as much relevant data as possible (electrical, electromechanical, mechanical). Therefore, in some phases of testing, 29 to 44 quantities were measured simultaneously. Among the tests, there are short circuits with lowered voltage, bad synchronization at approximate angle of 15 degrees, asynchronous operation, generator overspeed and operation with short circuited field winding on one pole. The most interesting and the most critical operation during this testing is asynchronous operation of hydro-generator [1, 2, 3, 4, 5], which is also very dangerous for generator and drive equipment. During such operation synchronous generator operates at a speed unequal to rated speed. This slip causes increased damping winding currents, which increases the thermal stress of this winding beyond the designed level. This makes these tests very infrequent. Asynchronous operating was achieved by decreasing the excitation current. Complex mathematical model for computer simulation of hydro-generator’s asynchronous operation has been made, taking into consideration the magnetic saturation, damper winding and generator transformer’s influence. Results obtained by simulations have been compared to those obtained by measurements.
International Council on Large Electric Systems - Cigre, Croatian National Committee
Title: Measurement and Simulation of Hydro-Generator’s Asynchronous Operation
Description:
The extended testing of hydro-generator with Pelton turbine (rated 35 MVA) was performed on a generator whose lifespan expired and it was going to be replaced.
This was the perfect opportunity to do some specific and uncommon testing.
The complex testing plan was designed in order to enable recording of as much relevant data as possible (electrical, electromechanical, mechanical).
Therefore, in some phases of testing, 29 to 44 quantities were measured simultaneously.
Among the tests, there are short circuits with lowered voltage, bad synchronization at approximate angle of 15 degrees, asynchronous operation, generator overspeed and operation with short circuited field winding on one pole.
The most interesting and the most critical operation during this testing is asynchronous operation of hydro-generator [1, 2, 3, 4, 5], which is also very dangerous for generator and drive equipment.
During such operation synchronous generator operates at a speed unequal to rated speed.
This slip causes increased damping winding currents, which increases the thermal stress of this winding beyond the designed level.
This makes these tests very infrequent.
Asynchronous operating was achieved by decreasing the excitation current.
Complex mathematical model for computer simulation of hydro-generator’s asynchronous operation has been made, taking into consideration the magnetic saturation, damper winding and generator transformer’s influence.
Results obtained by simulations have been compared to those obtained by measurements.
Related Results
Indirect temperature protection of an asynchronous generator by stator winding resistance measurement with superimposition of high-frequency pulse signals
Indirect temperature protection of an asynchronous generator by stator winding resistance measurement with superimposition of high-frequency pulse signals
The article deals with the indirect methods for calculating the temperature of asynchronous generators with the introduction of a pulse component in the power supply circuit of the...
Hydro-plankton characteristics and their relationship with sardine and anchovy distributions on the French shelf of the Bay of Biscay
Hydro-plankton characteristics and their relationship with sardine and anchovy distributions on the French shelf of the Bay of Biscay
The spatial pattern in hydro-plankton and fish distributions and their relationship were analysed based on the spring 2000 fisheries acoustic survey. The importance of this survey ...
Analisa Pengaruh Tegangan Harmonik Terhadap Regulasi Tegangan Eksitasi Generator Satu Fasa
Analisa Pengaruh Tegangan Harmonik Terhadap Regulasi Tegangan Eksitasi Generator Satu Fasa
Esensinya setiap generator listrik satu fasa maupun tiga fasa telah dilengkapi dengan sistem eksitasi. Sistem eksitasi generator ada tiga, yaitu sistem eksitasi statis, dinamis, da...
STUDI ANALISIS EFISIENSI STEAM TURBINE GENERATOR PADA BAGIAN ASAM SULFAT DAN UTILITAS DEPARTEMEN PRODUKSI IIIB PT PETROKIMIA GRESIK
STUDI ANALISIS EFISIENSI STEAM TURBINE GENERATOR PADA BAGIAN ASAM SULFAT DAN UTILITAS DEPARTEMEN PRODUKSI IIIB PT PETROKIMIA GRESIK
Sejumlah energi penggerak peralatan proses sangat diperlukan dalam proses produksi di seluruh pabrik yang ada pada PT Petrokimia Gresik. Departemen Produksi IIIB memiliki unit util...
SMART DISTRIBUTOR SYSTEM FOR MICRO GRID CONTROL
SMART DISTRIBUTOR SYSTEM FOR MICRO GRID CONTROL
A smart distributor system for controlling a micro grid has been developed in this work. The system switches ON different generators one after the other as the consumer load demand...
Modelling the Hydro-fracture driven collapse of the Larsen B ice shelf
Modelling the Hydro-fracture driven collapse of the Larsen B ice shelf
Ice shelves play a key role in buttressing upstream ice - modulating the flow of grounded ice into the ocean and in turn affecting ice sheet contribution to sea level. Iceberg calv...
Comparison of cardiopulmonary resuscitation that applied synchronous 30 compressions–2 ventilations with that applied asynchronous 110/min compression–10/min ventilation: A mannequin study
Comparison of cardiopulmonary resuscitation that applied synchronous 30 compressions–2 ventilations with that applied asynchronous 110/min compression–10/min ventilation: A mannequin study
Background:CPR model of a resuscitation to be ventilated with a bag valve mask constitutes a discussion when evaluated with the current guidance.Objective:This study aims to compar...
USE OF HYDRO-REMOVAL ASH FOR PREPARATION OF CRUSHED AND SAND MIXTURES, IN COMBINATION WITH MINERAL BINDERS AND COMPOSITIONS FOR ARRANGEMENT OF PAVEMENT BASE
USE OF HYDRO-REMOVAL ASH FOR PREPARATION OF CRUSHED AND SAND MIXTURES, IN COMBINATION WITH MINERAL BINDERS AND COMPOSITIONS FOR ARRANGEMENT OF PAVEMENT BASE
Introduction New scientific achievements, modern equipment and new materials have to be used for the quality rehabilitation of the road transport network. New materials have to m...