Innovative Procurement Adoption for Industrialised Building System (IBS) Projects
View through CrossRef
Industrialised Building System [IBS] is a new method that used prefabrication components in building construction as an alternative towards enhancing construction performance. The Construction Industry Development Board [CIDB] embraced the IBS method to enhance productivity and building quality, reduce wastage on site, increase occupational safety and health, and reduce overall cost of construction. Currently, most of the IBS project developments in Malaysia are still adopting traditional procurement system. However, traditional procurement system has been criticised for its fragmented procedure to project delivery in terms of integration and collaboration of the project team. As a result of that problem, a number of issues have recently arisen such as reworks, time delay, rising costs, lack of communication and coordination, and wastages. The purpose of this research is to identify challenges of the current procurement system and to investigate the possibilities of implementing innovative type of procurement method for IBS implementation. A deductive research approach was adopted. Reviewing relevant literature before embarking into any academic research project is one way of exploring a known theory in a holistic manner. It also appears to be one of an essential feature to create a firm foundation for the research. Based on extensive literature reviews; this paper describes what are initiatives that have been taken from developed nations which are known as earlier IBS adopters and through the findings these experiences may shed some light on the type of procurement that have been adopted. This study was conducted among Grade 7 IBS contractors in Malaysia to gain further clarification on the immensity of the issues as well as assessing the research instrument. The findings from this study reveal that financial matters, lack of early involvement, lack of integration and coordination, knowledge and understanding, role and responsibility, risk liability, communication and information, attitude and relationship matters are challenges embedded in the existing procurement approach in adopting IBS. Suggestion on how innovative type of procurement method such as Separation of IBS from Main Contract, Partnering and Integrated Project Delivery [IPD] will be able to minimise the fragmentation gaps will be concluded.
Title: Innovative Procurement Adoption for Industrialised Building System (IBS) Projects
Description:
Industrialised Building System [IBS] is a new method that used prefabrication components in building construction as an alternative towards enhancing construction performance.
The Construction Industry Development Board [CIDB] embraced the IBS method to enhance productivity and building quality, reduce wastage on site, increase occupational safety and health, and reduce overall cost of construction.
Currently, most of the IBS project developments in Malaysia are still adopting traditional procurement system.
However, traditional procurement system has been criticised for its fragmented procedure to project delivery in terms of integration and collaboration of the project team.
As a result of that problem, a number of issues have recently arisen such as reworks, time delay, rising costs, lack of communication and coordination, and wastages.
The purpose of this research is to identify challenges of the current procurement system and to investigate the possibilities of implementing innovative type of procurement method for IBS implementation.
A deductive research approach was adopted.
Reviewing relevant literature before embarking into any academic research project is one way of exploring a known theory in a holistic manner.
It also appears to be one of an essential feature to create a firm foundation for the research.
Based on extensive literature reviews; this paper describes what are initiatives that have been taken from developed nations which are known as earlier IBS adopters and through the findings these experiences may shed some light on the type of procurement that have been adopted.
This study was conducted among Grade 7 IBS contractors in Malaysia to gain further clarification on the immensity of the issues as well as assessing the research instrument.
The findings from this study reveal that financial matters, lack of early involvement, lack of integration and coordination, knowledge and understanding, role and responsibility, risk liability, communication and information, attitude and relationship matters are challenges embedded in the existing procurement approach in adopting IBS.
Suggestion on how innovative type of procurement method such as Separation of IBS from Main Contract, Partnering and Integrated Project Delivery [IPD] will be able to minimise the fragmentation gaps will be concluded.
.
Related Results
Investigating Significant Issues of BIM Implementation in Industrialised Building System Design and Production Process
Investigating Significant Issues of BIM Implementation in Industrialised Building System Design and Production Process
Industrialised Building System (IBS) has been considered a construction method to accelerate the development of the construction industry in attempt to boost the econo...
Construction Procurement in Industrialised Building System
Construction Procurement in Industrialised Building System
Abstract
The government, through CIDB Malaysia have continuously promoting Industrialised Building System (IBS) to increase the immense efficiency of the building pe...
Alterations in composition and diversity of the intestinal microbiota in patients with diarrhea‐predominant irritable bowel syndrome
Alterations in composition and diversity of the intestinal microbiota in patients with diarrhea‐predominant irritable bowel syndrome
AbstractBackground The intestinal microbiota has been implicated in the pathophysiology of irritable bowel syndrome (IBS). Due to the variable resolutions of techniques used to ch...
A comparison using standardized measures for patients with irritable bowel syndrome: Trust in the gastroenterologist and reliance on the internet
A comparison using standardized measures for patients with irritable bowel syndrome: Trust in the gastroenterologist and reliance on the internet
AbstractBackgroundIrritable bowel syndrome (IBS) patients’ use of the Internet for health information interacts with the way they trust their gastroenterologist. No standardized me...
THE READINESS AND CHALLENGES IN THE INDUSTRIALISED BUILDING SYSTEM (IBS) ADOPTION IN SARAWAK FROM G7 CONTRACTORS’ PERSPECTIVE
THE READINESS AND CHALLENGES IN THE INDUSTRIALISED BUILDING SYSTEM (IBS) ADOPTION IN SARAWAK FROM G7 CONTRACTORS’ PERSPECTIVE
Industrialised Building System (IBS) is defined as method for thorough integration of subsystems, components, and parts into a single overall system that utilizes industrialised ma...
Fostering Sustainable Practices through the Implementation of a Green Procurement Management System for IFAD Funded Economic Transformation Initiatives in Gilgit-Baltistan/Donor Funded projects
Fostering Sustainable Practices through the Implementation of a Green Procurement Management System for IFAD Funded Economic Transformation Initiatives in Gilgit-Baltistan/Donor Funded projects
This research project aims to explore and suggest the adoption of a Green Procurement Management System (GPMS) as a strategic tool for fostering sustainable practices in economic t...
Development and psychometric testing of the Visual Analogue Scale for Irritable Bowel Syndrome (VAS-IBS)
Development and psychometric testing of the Visual Analogue Scale for Irritable Bowel Syndrome (VAS-IBS)
Background: The aim of this study was to develop and psychometrically test a short, patient-reported questionnaire to be used in clinical practice for patients with Irritable Bowel...
The Science of Public Procurement and Administration. International Public Procurement Conference
The Science of Public Procurement and Administration. International Public Procurement Conference
<p><em>This paper reviewed Benon C. Basheka book’s chapter on the Science of Public Procurement and Administration published by International Public Procurement Confere...