Javascript must be enabled to continue!
Open‐phase temporary overvoltage before and after an intermediate subsation accessing a long distance transmission line
View through CrossRef
AbstractIn transmission lines, shunt‐reactors are commonly applied to counteract the “Ferranti effect.” However, in highly compensated lines, hazardous overvoltage may occur during unbalanced open‐phase conditions. In addition, when a new substation is put into operation, π circuit can be selected by accessing an existing transmission line and the original shunt‐reactor configuration is maintained. Severe overvoltage may occur on the shunt‐reactor side of the newly installed transmission line. In this study, we analysed the effects of compensation, neutral‐reactor, and system frequency on open‐phase overvoltage. The maximum deviation of system frequency is <±0.5 Hz, therefore, we suggested maximum critical compensation of the shunt‐reactor under different proportional coefficients of neutral‐reactor. We analysed the impact of line division, when an intermediate substation is accessed, and a risk range in which the substation located may cause severe overvoltage was proposed. Finally, according to an actual line division project, we optimised the original configuration scheme of the shunt and neutral‐reactors. We used electromagnetic transient simulation to verify whether severe overvoltage occurred before and after the power station is accessed. The study results may provide guidance for selection of the π circuit accessing point and for optimising the configuration of the shunt and neutralreactors.
Institution of Engineering and Technology (IET)
Title: Open‐phase temporary overvoltage before and after an intermediate subsation accessing a long distance transmission line
Description:
AbstractIn transmission lines, shunt‐reactors are commonly applied to counteract the “Ferranti effect.
” However, in highly compensated lines, hazardous overvoltage may occur during unbalanced open‐phase conditions.
In addition, when a new substation is put into operation, π circuit can be selected by accessing an existing transmission line and the original shunt‐reactor configuration is maintained.
Severe overvoltage may occur on the shunt‐reactor side of the newly installed transmission line.
In this study, we analysed the effects of compensation, neutral‐reactor, and system frequency on open‐phase overvoltage.
The maximum deviation of system frequency is <±0.
5 Hz, therefore, we suggested maximum critical compensation of the shunt‐reactor under different proportional coefficients of neutral‐reactor.
We analysed the impact of line division, when an intermediate substation is accessed, and a risk range in which the substation located may cause severe overvoltage was proposed.
Finally, according to an actual line division project, we optimised the original configuration scheme of the shunt and neutral‐reactors.
We used electromagnetic transient simulation to verify whether severe overvoltage occurred before and after the power station is accessed.
The study results may provide guidance for selection of the π circuit accessing point and for optimising the configuration of the shunt and neutralreactors.
Related Results
Research on overvoltage and minimum air clearance on 1000 kV AC side of converter transformer in ±1100 kV Guquan converter station
Research on overvoltage and minimum air clearance on 1000 kV AC side of converter transformer in ±1100 kV Guquan converter station
In the hierarchically connected ultra‐high voltage (UHV) DC projects, the minimum air clearance on the 1000 kV AC side of converter transformer directly affects the layout and area...
Temporary Rivers
Temporary Rivers
Temporary rivers are those that do not flow continuously through time along their entire length. The phrase temporary rivers primarily came into use during the first decade of the ...
The Different LVRT Control Strategy of Wind Generator Suppressing for Transient Overvoltage by DC Commutation Failure
The Different LVRT Control Strategy of Wind Generator Suppressing for Transient Overvoltage by DC Commutation Failure
Abstract
At present, the characteristics of large capacity DC and high proportion of new energy centralized delivery is showed for power system of China. The ability...
Perturbed solution and analyses for single photon transmission equation in optical fiber
Perturbed solution and analyses for single photon transmission equation in optical fiber
As is well known, quantum optics has developed significantly in recent years and advanced several hot research topics, such as quantum communications, quantum sensing, quantum calc...
Online Education
Online Education
Online education is considered the latest generation in the practice of distance education. As described by professionals in the field, distance education is a form of teaching and...
Photometric properties of Ryugu and its artificial impact crater
Photometric properties of Ryugu and its artificial impact crater
Introduction:  The JAXA’s Hayabusa2 mission [1] rendezvoused with the Ryugu near Earth, C-type asteroid from June 2018 to November 2019, performing two touchdown...
Electromagnetic interference characteristics during switching operation in power distribution network
Electromagnetic interference characteristics during switching operation in power distribution network
Abstract
The disturbance problem caused by the transient electromagnetic field during high-voltage switching operation is the most typical. Electromagnetic interfere...
Effect of skull porosity on ultrasound transmission and wave mode conversion at large incidence angles
Effect of skull porosity on ultrasound transmission and wave mode conversion at large incidence angles
AbstractBackgroundTranscranial ultrasound imaging and therapy depend on the efficient transmission of acoustic energy through the skull. Multiple previous studies have concluded th...

