Brutus Project Overview: "Challenges and Results"

View through CrossRef
Abstract Brutus is Shell's fifth tension leg platform (TLP) installed in the Gulf of Mexico. It is located in 2985 feet of water in Green Canyon Block 158 and is 100% owned by Shell. The estimated ultimate recovery is about 250 million barrels of oil equivalent and the total cost is expected to be less than $750 MM including pipelines and wells but excluding lease costs. Brutus is expected to be Shell's next major producer in the Gulf of Mexico with design rates of 100,000 barrels of oil per day and 150 million cubic feet of gas per day. This paper will provide a general overview of the Brutus project. This will include a comparison of similarities and differences between Brutus and other Shell TLPs. The Brutus project has integrated learnings, designs and components from many previous projects while also adding capability and technology for deepwater hub processing, hydrocarbon dewpoint control of the export gas, and a combination use drilling/production riser system. The Brutus project has significantly improved overall performance. When benchmarked against comparable projects in Shell, the cost is 17% lower and the schedule from construction funding to first oil is 7 months shorter than previous best in class. This has been accomplished while maintaining Shell's focus on quality and HSE. The early uptime performance of the facility after start-up has also been outstanding with facility uptime averaging 98% over the first five months. Introduction The Brutus platform is located approximately 155 miles south-southwest of New Orleans, Louisiana in the Green Canyon 158 block as shown on the map in Figure 1. The platform is an 8-slot Tension Leg Platform (TLP) in 2985 feet of water. A photograph of the completed platform just after installation is shown in Figure 2. Major components of the platform are shown in Figure 3 with a brief description of size, weight, and fabricator. The hull and deck configuration is similar to the Mars and Ram/Powell TLPs. However, the hull has been upgraded to provide additional displacement capacity with total displacement of 54,700 short tons and significant additions have been made for hub capabilities and gas processing equipment. The platform is designed to handle tieback of up to five subsea fields. The facilities are designed for a throughput capacity of 100,000 BOPD and 150 MMCFD through two separate processing trains. Oil is transported 25.5 miles through a 20" pipeline to the South Timbalier 301 B Platform where it ties into the Amberjack gathering system. Gas is transported 24 miles through a 20" pipeline to the Ship Shoal 332 A Platform where it ties into the Manta Ray gathering system. A high level project schedule is provided in Figure 4. System Selection An extensive system selection process was applied at Brutus with numerous type and sizes of systems considered. This included Spars, Ship based systems, subsea, and TLPs.
Title: Brutus Project Overview: "Challenges and Results"
Description:
Abstract Brutus is Shell's fifth tension leg platform (TLP) installed in the Gulf of Mexico.
It is located in 2985 feet of water in Green Canyon Block 158 and is 100% owned by Shell.
The estimated ultimate recovery is about 250 million barrels of oil equivalent and the total cost is expected to be less than $750 MM including pipelines and wells but excluding lease costs.
Brutus is expected to be Shell's next major producer in the Gulf of Mexico with design rates of 100,000 barrels of oil per day and 150 million cubic feet of gas per day.
This paper will provide a general overview of the Brutus project.
This will include a comparison of similarities and differences between Brutus and other Shell TLPs.
The Brutus project has integrated learnings, designs and components from many previous projects while also adding capability and technology for deepwater hub processing, hydrocarbon dewpoint control of the export gas, and a combination use drilling/production riser system.
The Brutus project has significantly improved overall performance.
When benchmarked against comparable projects in Shell, the cost is 17% lower and the schedule from construction funding to first oil is 7 months shorter than previous best in class.
This has been accomplished while maintaining Shell's focus on quality and HSE.
The early uptime performance of the facility after start-up has also been outstanding with facility uptime averaging 98% over the first five months.
Introduction The Brutus platform is located approximately 155 miles south-southwest of New Orleans, Louisiana in the Green Canyon 158 block as shown on the map in Figure 1.
The platform is an 8-slot Tension Leg Platform (TLP) in 2985 feet of water.
A photograph of the completed platform just after installation is shown in Figure 2.
Major components of the platform are shown in Figure 3 with a brief description of size, weight, and fabricator.
The hull and deck configuration is similar to the Mars and Ram/Powell TLPs.
However, the hull has been upgraded to provide additional displacement capacity with total displacement of 54,700 short tons and significant additions have been made for hub capabilities and gas processing equipment.
The platform is designed to handle tieback of up to five subsea fields.
The facilities are designed for a throughput capacity of 100,000 BOPD and 150 MMCFD through two separate processing trains.
Oil is transported 25.
5 miles through a 20" pipeline to the South Timbalier 301 B Platform where it ties into the Amberjack gathering system.
Gas is transported 24 miles through a 20" pipeline to the Ship Shoal 332 A Platform where it ties into the Manta Ray gathering system.
A high level project schedule is provided in Figure 4.
System Selection An extensive system selection process was applied at Brutus with numerous type and sizes of systems considered.
This included Spars, Ship based systems, subsea, and TLPs.

Related Results

Brutus and His Mirrors (Brutus10.4–6, 13.7–10, 29.2–3, 40.7–8)
Brutus and His Mirrors (Brutus10.4–6, 13.7–10, 29.2–3, 40.7–8)
AbstractThis chapter and the next look at the Life of Brutus. This chapter looks at all the passages in the Life which display rhythmic density by the criteria given in ch. 3. Nota...
BRUTUS: The Rigid Spoolpiece Installation System
BRUTUS: The Rigid Spoolpiece Installation System
Abstract The Brutus System has been designed and built to fulfil an industry need for the deep-water installation of rigid lines and spoolpieces. This has been dr...
THE EVALUATION OF NEHEMIAH'S PROJECT MANAGEMENT APPROACH IN RELATION TO (PROJECT MANAGEMENTS INSTITUTE) PMI STANDARDS
THE EVALUATION OF NEHEMIAH'S PROJECT MANAGEMENT APPROACH IN RELATION TO (PROJECT MANAGEMENTS INSTITUTE) PMI STANDARDS
This research examines the project management strategies utilized by Nehemiah in the reconstruction of Jerusalem's walls, as described in the biblical text, and assesses their comp...
PROJECT MANAGEMENT SYSTEM AT AN ENTERPRISE: THE FOUNDATIONS OF EFFECTIVE FORMATION
PROJECT MANAGEMENT SYSTEM AT AN ENTERPRISE: THE FOUNDATIONS OF EFFECTIVE FORMATION
The article examines the principles of effective formation of a project management system at an enterprise. In the modern environment, project management standards and management i...
Improvement of the project control system : a case study of an interior decoration company
Improvement of the project control system : a case study of an interior decoration company
This thesis aimed to reduce the delay and unnecessarily accelerated or crashed activities of the project by improving the project control system of an interior decoration company. ...
Application of Mitigation Hierarchy During the Development Phase of Tilenga Project, Uganda
Application of Mitigation Hierarchy During the Development Phase of Tilenga Project, Uganda
Abstract The Tilenga project operated by TotalEnergies Exploration and Production Uganda, is an onshore oil project located in the Lake Albert Basin of Uganda. The p...
The relationship between project management process characteristics and performance outcomes
The relationship between project management process characteristics and performance outcomes
Purpose– The aim of this paper is to examine the links between project management process characteristics and project-level and firm-level performance outcomes to test the hypothes...
‘The Name of King will light upon a Tarquin’: republicanism, exclusion, and the name of king in Nathaniel Lee’s Lucius Junius Brutus
‘The Name of King will light upon a Tarquin’: republicanism, exclusion, and the name of king in Nathaniel Lee’s Lucius Junius Brutus
After Titus Oates’s ‘popish forgeries’, which prompted a crisis in the succession, the production of Nathaniel Lee’s Lucius Junius Brutus was undoubtedly provocative. The play oste...

Back to Top