Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Bowtie analysis for risk assessment of confined space at sewerage construction project

View through CrossRef
This paper aims to investigate the issues related to safety in confined space at the sewerage treatment plant construction project in the Hulu Langat district and to provide a solution by proposing a substantial approach to mitigating risk during confined space entry due to an ineffective risk assessment and poor compliance by project management. The methods used were site visit observation and survey, followed by an analysis of the selected risk assessment method. The site visit to the sewerage treatment plant project investigated the compliance of confined space risk assessment documents to established requirements such as OSHA 1994, FMA 1967, ICOP 2010, HIRARC Guidelines 2008, Quebec Regulation 2015, ISO 31010, HSE UK, and BCGA UK. The selected risk assessment method was analyzed with Bowtie Risk Assessment by referring to the preventive approach concept or barrier analysis. Next, additional information relevant to risk assessment from journals was included. Evaluation of Bowtie Risk Assessment was conducted through a focus group discussion (FGD), which plays an essential role in developing the Bowtie risk assessment graphical framework. The proposed Bowtie Risk Assessment graphical framework provides a sewerage treatment plant construction project with a holistic technique for preventing confined space accidents. It also provides a safe work system, manages hazards and risks effectively, promotes good leadership practices, improves company reputation, and significantly reduces accident costs. The framework is also helpful as a reference model for other industry players.
Title: Bowtie analysis for risk assessment of confined space at sewerage construction project
Description:
This paper aims to investigate the issues related to safety in confined space at the sewerage treatment plant construction project in the Hulu Langat district and to provide a solution by proposing a substantial approach to mitigating risk during confined space entry due to an ineffective risk assessment and poor compliance by project management.
The methods used were site visit observation and survey, followed by an analysis of the selected risk assessment method.
The site visit to the sewerage treatment plant project investigated the compliance of confined space risk assessment documents to established requirements such as OSHA 1994, FMA 1967, ICOP 2010, HIRARC Guidelines 2008, Quebec Regulation 2015, ISO 31010, HSE UK, and BCGA UK.
The selected risk assessment method was analyzed with Bowtie Risk Assessment by referring to the preventive approach concept or barrier analysis.
Next, additional information relevant to risk assessment from journals was included.
Evaluation of Bowtie Risk Assessment was conducted through a focus group discussion (FGD), which plays an essential role in developing the Bowtie risk assessment graphical framework.
The proposed Bowtie Risk Assessment graphical framework provides a sewerage treatment plant construction project with a holistic technique for preventing confined space accidents.
It also provides a safe work system, manages hazards and risks effectively, promotes good leadership practices, improves company reputation, and significantly reduces accident costs.
The framework is also helpful as a reference model for other industry players.

Related Results

Scaling read aligners to hundreds of threads on general-purpose processors
Scaling read aligners to hundreds of threads on general-purpose processors
Abstract Motivation General-purpose processors can now contain many dozens of processor cores and support hundreds of simultaneo...
Seditious Spaces
Seditious Spaces
The title ‘Seditious Spaces’ is derived from one aspect of Britain’s colonial legacy in Malaysia (formerly Malaya): the Sedition Act 1948. While colonial rule may seem like it was ...
Hazard Factor Identification And Efforts To Control Work Accidents In Welding Activities In Tanks (Confined Space) At PT. Menubar Kaltim
Hazard Factor Identification And Efforts To Control Work Accidents In Welding Activities In Tanks (Confined Space) At PT. Menubar Kaltim
Background: Hazard factors and risks on ships, especially in welding activities in tanks (confined space) there are hazard and risk factors that cannot be avoided by workers. Metod...
Space Safety through situational awareness
Space Safety through situational awareness
Space Situational Awareness (SSA) entails the detection, tracking, and comprehension of spaceborne objects and phenomena that could potentially affect Earth or space operations. It...
Application of “Single Site, Multiple Use” in a sewerage project - a breakthrough trial in Kwun Tong Sewage Pumping Station
Application of “Single Site, Multiple Use” in a sewerage project - a breakthrough trial in Kwun Tong Sewage Pumping Station
Hong Kong’s land resources are undoubtedly precious. At the same time, sewerage facilities are of paramount importance to ensure public hygiene and preserve the receiving water qua...
Prostor doma u hrvatskim igranim filmovima s temom domovinskog rata
Prostor doma u hrvatskim igranim filmovima s temom domovinskog rata
The dissertation explores the formation of domestic space in contemporary Croatian society through its presentations in the medium of feature films. The cinematic domestic spaces a...
Artificial Intelligence and Machine Learning Used as an Enabler for Dynamic Risk Management
Artificial Intelligence and Machine Learning Used as an Enabler for Dynamic Risk Management
Abstract Applying big data, data science, business process automation (BPA) and domain expertise to operational and project risk in the upstream O&G space, will ...
The Nexus Between Construction Contract Risk Assessment and Big Data in China
The Nexus Between Construction Contract Risk Assessment and Big Data in China
The construction market in China is currently showing an increasing trend in terms of project size, complexity, and technical difficulty. With large initial investments and long ca...

Back to Top