BUILDABILITY ASSESSMENT MODEL FOR BUILDING CONSTRUCTION IN CAMBODIA

View through CrossRef
Buildability refers to the integration of construction knowledge during the design stage to enhance the ease of construction while meeting all requirements of the owner/client. Lack of buildability in designs could result in design reworks, low site productivity, costs increase, and contract changes. Due to differences in site conditions, construction techniques, materials, equipment and experiences available, the buildability factors vary from countries to countries. Therefore, a model to comprehensively evaluate the buildability of building designs based on localized buildability factors at early phase of design is needed. The research is divided into two main parts. The first part aims to evaluate the importance level of buildability factors of building designs in Cambodia. The questionnaires using five-point Likert scale were distributed to project managers and site engineers of contractors in Cambodia. The analysis of One-sample t-test showed that there were 12 important factors that affected the buildability. The top 5 important factors associated with buildability were: (1) standardization of designs; (2) completion of design documents; (3) clarity of specifications; (4) requirement of labor skill; and (5) design to suit site conditions. The ranking of the factors and factor categories provides useful information for designers to improve buildability of their designs. The important factors of this research were then used for the development of buildability assessment model for building construction projects in Cambodia. The second part focuses on the development process of a model to assess the buildability of building design. The model was based on an Analytic Hierarchy Process (AHP) model. This part of research was divided into two main steps. First, structured questionnaires were conducted with mid- and high-rise building contractors to obtain the weights of buildability factors. Their opinions were aggregated by the geometric mean on judgments in AHP group decision. Then the subcriteria to evaluate the buildability factors and the current practices of designs were collected by cross-case analysis of structured interviews. Design for available resources was found to be the most important category of buildability followed by design to support site layout and design documents. The most important buildability factor under each category was design to support transportation of materials and labors, requirement of labor skill, and completion of design documents. This model was validated by applying 11 building projects in Cambodia. This model can serve as a framework to assess the buildability of a building design by the design team so that necessary improvements can be made before construction.
Office of Academic Resources, Chulalongkorn University
Title: BUILDABILITY ASSESSMENT MODEL FOR BUILDING CONSTRUCTION IN CAMBODIA
Description:
Buildability refers to the integration of construction knowledge during the design stage to enhance the ease of construction while meeting all requirements of the owner/client.
Lack of buildability in designs could result in design reworks, low site productivity, costs increase, and contract changes.
Due to differences in site conditions, construction techniques, materials, equipment and experiences available, the buildability factors vary from countries to countries.
Therefore, a model to comprehensively evaluate the buildability of building designs based on localized buildability factors at early phase of design is needed.
The research is divided into two main parts.
The first part aims to evaluate the importance level of buildability factors of building designs in Cambodia.
The questionnaires using five-point Likert scale were distributed to project managers and site engineers of contractors in Cambodia.
The analysis of One-sample t-test showed that there were 12 important factors that affected the buildability.
The top 5 important factors associated with buildability were: (1) standardization of designs; (2) completion of design documents; (3) clarity of specifications; (4) requirement of labor skill; and (5) design to suit site conditions.
The ranking of the factors and factor categories provides useful information for designers to improve buildability of their designs.
The important factors of this research were then used for the development of buildability assessment model for building construction projects in Cambodia.
The second part focuses on the development process of a model to assess the buildability of building design.
The model was based on an Analytic Hierarchy Process (AHP) model.
This part of research was divided into two main steps.
First, structured questionnaires were conducted with mid- and high-rise building contractors to obtain the weights of buildability factors.
Their opinions were aggregated by the geometric mean on judgments in AHP group decision.
Then the subcriteria to evaluate the buildability factors and the current practices of designs were collected by cross-case analysis of structured interviews.
Design for available resources was found to be the most important category of buildability followed by design to support site layout and design documents.
The most important buildability factor under each category was design to support transportation of materials and labors, requirement of labor skill, and completion of design documents.
This model was validated by applying 11 building projects in Cambodia.
This model can serve as a framework to assess the buildability of a building design by the design team so that necessary improvements can be made before construction.

Related Results

Enhancing buildability in China's construction industry using Singapore's buildable design appraisal system
Enhancing buildability in China's construction industry using Singapore's buildable design appraisal system
PurposeThe construction industry in China is progressing at a rapid pace. There are many important issues to be considered in the Chinese construction industry, not the least of wh...
Cybergovernance in Cambodia: A Risk-Based Approach to Cybersecurity
Cybergovernance in Cambodia: A Risk-Based Approach to Cybersecurity
To understand cyber risk in Cambodia and equip policy leaders to oversee it, this paper assesses the successes and challenges of current cyber risk management efforts in Cambodia a...
Der skal ikke lades sten på sten tilbage
Der skal ikke lades sten på sten tilbage
The Building by the Barbar TempleClose by the large temple at Barbar 1) lies a little tell, which was investigated in the spring of 1956. The tell was shown to cover a building of ...
Evaluation of Ecological Environmental Pollution in Green Building Construction
Evaluation of Ecological Environmental Pollution in Green Building Construction
The long-term extensive development mode of China’s construction industry has resulted in the enormous consumption of energy resources, increasingly severe environmental pollution,...
Between Propaganda and Cao-Mienism
Between Propaganda and Cao-Mienism
The generation of soldiers, advisors, politicians, and civilians who participated in Vietnam’s intervention in Cambodia between 1978 and 1989 had diverse, colorful, and powerful ex...

Back to Top