Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Priority-Aware Actuation Update Scheme in Heterogeneous Industrial Networks

View through CrossRef
In heterogeneous wireless networked control systems (WNCSs), the age of information (AoI) of the actuation update and actuation update cost are important performance metrics. To reduce the monetary cost, the control system can wait for the availability of a WiFi network for the actuator and then conduct the update using a WiFi network in an opportunistic manner, but this leads to an increased AoI of the actuation update. In addition, since there are different AoI requirements according to the control priorities (i.e., robustness of AoI of the actuation update), these need to be considered when delivering the actuation update. To jointly consider the monetary cost and AoI with priority, this paper proposes a priority-aware actuation update scheme (PAUS) where the control system decides whether to deliver or delay the actuation update to the actuator. For the optimal decision, we formulate a Markov decision process model and derive the optimal policy based on Q-learning, which aims to maximize the average reward that implies the balance between the monetary cost and AoI with priority. Simulation results demonstrate that the PAUS outperforms the comparison schemes in terms of the average reward under various settings.
Title: Priority-Aware Actuation Update Scheme in Heterogeneous Industrial Networks
Description:
In heterogeneous wireless networked control systems (WNCSs), the age of information (AoI) of the actuation update and actuation update cost are important performance metrics.
To reduce the monetary cost, the control system can wait for the availability of a WiFi network for the actuator and then conduct the update using a WiFi network in an opportunistic manner, but this leads to an increased AoI of the actuation update.
In addition, since there are different AoI requirements according to the control priorities (i.
e.
, robustness of AoI of the actuation update), these need to be considered when delivering the actuation update.
To jointly consider the monetary cost and AoI with priority, this paper proposes a priority-aware actuation update scheme (PAUS) where the control system decides whether to deliver or delay the actuation update to the actuator.
For the optimal decision, we formulate a Markov decision process model and derive the optimal policy based on Q-learning, which aims to maximize the average reward that implies the balance between the monetary cost and AoI with priority.
Simulation results demonstrate that the PAUS outperforms the comparison schemes in terms of the average reward under various settings.

Related Results

KONSEP PENGEMBANGAN DIRI ARISTOTELES
KONSEP PENGEMBANGAN DIRI ARISTOTELES
<p><!--[if gte mso 9]><xml> <w:WordDocument> <w:View>Normal</w:View> <w:Zoom>0</w:Zoom> <w:TrackMoves /> <w:TrackFormatting...
Diarréia nosocomial e outras infecções adquiridas em hospital universitário
Diarréia nosocomial e outras infecções adquiridas em hospital universitário
<!--[if gte mso 9]><xml> <w:WordDocument> <w:View>Normal</w:View> <w:Zoom>0</w:Zoom> <w:TrackMoves /> <w:TrackFormatting /> &l...
A CHINA E A TRANSIÇÃO SOCIALISTA – UM BREVE BOSQUEJO
A CHINA E A TRANSIÇÃO SOCIALISTA – UM BREVE BOSQUEJO
<!--[if gte mso 9]><xml> <o:DocumentProperties> <o:Revision>0</o:Revision> <o:TotalTime>0</o:TotalTime> <o:Pages>1</o:Pages> &...
Traditional Knowledge of Asmat Ethnic Group in Using Woods as Carving Materials at Asmat District
Traditional Knowledge of Asmat Ethnic Group in Using Woods as Carving Materials at Asmat District
<!--[if gte mso 9]><xml> <w:WordDocument> <w:View>Normal</w:View> <w:Zoom>0</w:Zoom> <w:TrackMoves /> <w:TrackFormatting /> &l...
Grevillea papuana as Traditional Medicine by Lani Ethnic Group in Jayawijaya
Grevillea papuana as Traditional Medicine by Lani Ethnic Group in Jayawijaya
<!--[if gte mso 9]><xml> <w:WordDocument> <w:View>Normal</w:View> <w:Zoom>0</w:Zoom> <w:TrackMoves /> <w:TrackFormatting /> &l...
Constantinople as 'New Rome'
Constantinople as 'New Rome'
<!--[if gte mso 9]><xml> <o:DocumentProperties> <o:Revision>0</o:Revision> <o:TotalTime>0</o:TotalTime> <o:Pages>1</o:Pages> &...

Back to Top