Javascript must be enabled to continue!
Improved Selection Criteria for Sand Control - When Are "Fines" Fines?
View through CrossRef
Abstract
When sand control is required in production or injection wells, one of the key design criteria is that the sand control should allow those "fines" present to pass, whilst retaining "sand". However the definition of "fines" is not universal and some arbitrary size and/or compositional definitions are often used that could potentially lead to inappropriate sand control design.
The fines in any rock sample are usually categorized as that portion of the rock which passes through a ~45 micron sieve. This is a convenient cut-off point for laboratory evaluations as it represents the finest commonly used sieve. It has become routine to use the percentage of fines in a rock sample as one of the key parameters for sand control type selection and specific screen selection. In a coarse-grained, well-sorted sand, particles "less than ~45 microns" may well represent that part of the rock that can move through the pore throats. However, significant variation exists in oil and gas reservoirs and this should be considered in order to obtain an appropriate definition of what constitute fines for a specific reservoir. From a reservoir perspective, the preferred definition of "fines" is that part of the rock that can move through the pores of the intact rock.
Using pore throat size measurements and estimates, it is possible to develop a much more rigorous mobile fines size for any formation. Coupled with grain size analysis (which should include some laser analysis of the finer fraction) the true "fines" can be quantified for any given sand. The sand control selection is made using this new definition of fines, leading to optimum and tailored selection, based on science rather than convenience or tradition. For sand control performance evaluation it is not only the mobile reservoir fines that are a concern. Should the formation fail into an annulus then the rock components may re-sort in the annulus and bring about high skins and possible screen plugging. Here, the sizing of the fines that are of concern will be different.
It has been convenient to adhere to somewhat arbitrary particle size distribution cut-off points when selecting sand control. When informed with an improved understanding of the petrology, particle behaviour, impact of their movement, and the interaction between the formation and the well, while it is being both constructed and produced it is proposed that we can improve the selection process.
Title: Improved Selection Criteria for Sand Control - When Are "Fines" Fines?
Description:
Abstract
When sand control is required in production or injection wells, one of the key design criteria is that the sand control should allow those "fines" present to pass, whilst retaining "sand".
However the definition of "fines" is not universal and some arbitrary size and/or compositional definitions are often used that could potentially lead to inappropriate sand control design.
The fines in any rock sample are usually categorized as that portion of the rock which passes through a ~45 micron sieve.
This is a convenient cut-off point for laboratory evaluations as it represents the finest commonly used sieve.
It has become routine to use the percentage of fines in a rock sample as one of the key parameters for sand control type selection and specific screen selection.
In a coarse-grained, well-sorted sand, particles "less than ~45 microns" may well represent that part of the rock that can move through the pore throats.
However, significant variation exists in oil and gas reservoirs and this should be considered in order to obtain an appropriate definition of what constitute fines for a specific reservoir.
From a reservoir perspective, the preferred definition of "fines" is that part of the rock that can move through the pores of the intact rock.
Using pore throat size measurements and estimates, it is possible to develop a much more rigorous mobile fines size for any formation.
Coupled with grain size analysis (which should include some laser analysis of the finer fraction) the true "fines" can be quantified for any given sand.
The sand control selection is made using this new definition of fines, leading to optimum and tailored selection, based on science rather than convenience or tradition.
For sand control performance evaluation it is not only the mobile reservoir fines that are a concern.
Should the formation fail into an annulus then the rock components may re-sort in the annulus and bring about high skins and possible screen plugging.
Here, the sizing of the fines that are of concern will be different.
It has been convenient to adhere to somewhat arbitrary particle size distribution cut-off points when selecting sand control.
When informed with an improved understanding of the petrology, particle behaviour, impact of their movement, and the interaction between the formation and the well, while it is being both constructed and produced it is proposed that we can improve the selection process.
Related Results
Evaluating the Sand-Trapping Efficiency of Sand Fences Using a Combination of Wind-Blown Sand Measurements and UAV Photogrammetry at Tottori Sand Dunes, Japan
Evaluating the Sand-Trapping Efficiency of Sand Fences Using a Combination of Wind-Blown Sand Measurements and UAV Photogrammetry at Tottori Sand Dunes, Japan
Fences are commonly used in coastal regions to control wind-blown sand. Sand-trapping fences and sand-stabilizing fences have been installed at the Tottori Sand Dunes, Tottori Pref...
A Sand Failure Test Can Cut Both Completion Costs And The Number Of Developement Wells
A Sand Failure Test Can Cut Both Completion Costs And The Number Of Developement Wells
Abstract
The objective of this Sand Failure Test was to determine whether initial sand control is necessary on a poorly consolidated gas field, or whether it can ...
A comprehensive review of cased hole sand control optimization techniques: Theoretical and practical perspectives
A comprehensive review of cased hole sand control optimization techniques: Theoretical and practical perspectives
Cased hole sand control is a critical aspect of oil and gas well management, ensuring efficient production by mitigating sand production issues. This review presents a comprehensiv...
Sand Control Techniques in Shengli Oilfield
Sand Control Techniques in Shengli Oilfield
ABSTRACT
Shengli Oilfield has been developed for more than twenty years. The problem of sand production has existed since its development. About one third of the tot...
Chemical Sand Consolidation and Through-Tubing Gravel Pack, the Effective Alternative Sand Control Methods in Zawtika Field
Chemical Sand Consolidation and Through-Tubing Gravel Pack, the Effective Alternative Sand Control Methods in Zawtika Field
Abstract
Sand production has been highlighted as one of the critical challenges for Zawtika Project. Throughout the years of field experiences, sand production manag...
Sand Control Mechanism Analysis of Metallic Wool Screen
Sand Control Mechanism Analysis of Metallic Wool Screen
Abstract
A new sand control device, metallic wools screen, is developed to achieved a good effect on thermal and unconsolidated sand oil well. In this paper, an u...
Sand Monitoring in Gas Wells: Enhanced Methodology of Sand Sampling via Combination of Online Sand Sampler and Acoustic Sand Monitors to Determine Max Sand Free Rates for Identification of Quick Gain Opportunities and to Quantify Sand Production
Sand Monitoring in Gas Wells: Enhanced Methodology of Sand Sampling via Combination of Online Sand Sampler and Acoustic Sand Monitors to Determine Max Sand Free Rates for Identification of Quick Gain Opportunities and to Quantify Sand Production
Abstract
Sand production from wells are one of the operators’ biggest nightmare as the cascading effect can cause some major harm to the surface equipment as well as...

