Javascript must be enabled to continue!
Dynamic Representation of Barriers for Adopting Building Information Modelling in Malaysian Tertiary Education
View through CrossRef
Building Information Modelling (BIM) is deemed to shape the future of the construction sector across the world. At present, the lack of BIM in tertiary education has been the rising concern around the world as the demand for BIM talent increases. The current landscape suggests that few pedagogic researches have been undertaken to advance BIM education, particularly in Malaysia. BIM implementation could only be possible by identifying the potential barriers, which is a basic pre-requisite for successful adoption of BIM. Unfortunately, previous studies on the barriers of BIM adoption have often based on theoretical constructs, which are deterministic in nature. The methodology used could not portray a conclusive correlation of causal relations among the variables, creating difficulty in developing holistic and workable solutions. Therefore, this study aims to develop a methodology that provides a dynamic representation of the barriers in implementing BIM in tertiary education. The methodology combines both the deterministic (feedback from questionnaire survey) and dynamic approach (causal loop diagram). Data was first collected and analysed through a questionnaire survey administered among lecturers from selected Malaysian universities. Following that, a dynamic systems approach (causal loop diagram) was used to demonstrate the complex nature and interrelationship of the barriers for a more holistic representation. Results from the deterministic analysis has suggested barriers that relate to technology, while findings from the dynamics has identified the people aspect as the core barrier for BIM adoption. This study has contributed in establishing a methodology that integrates the dynamic approach with the deterministic data towards providing a more holistic representation of a system that further enables the identification of holistic solutions that would address the core barriers inhibiting the implementation of BIM education, particularly at Malaysian Universities.
University of Technology, Sydney (UTS)
Title: Dynamic Representation of Barriers for Adopting Building Information Modelling in Malaysian Tertiary Education
Description:
Building Information Modelling (BIM) is deemed to shape the future of the construction sector across the world.
At present, the lack of BIM in tertiary education has been the rising concern around the world as the demand for BIM talent increases.
The current landscape suggests that few pedagogic researches have been undertaken to advance BIM education, particularly in Malaysia.
BIM implementation could only be possible by identifying the potential barriers, which is a basic pre-requisite for successful adoption of BIM.
Unfortunately, previous studies on the barriers of BIM adoption have often based on theoretical constructs, which are deterministic in nature.
The methodology used could not portray a conclusive correlation of causal relations among the variables, creating difficulty in developing holistic and workable solutions.
Therefore, this study aims to develop a methodology that provides a dynamic representation of the barriers in implementing BIM in tertiary education.
The methodology combines both the deterministic (feedback from questionnaire survey) and dynamic approach (causal loop diagram).
Data was first collected and analysed through a questionnaire survey administered among lecturers from selected Malaysian universities.
Following that, a dynamic systems approach (causal loop diagram) was used to demonstrate the complex nature and interrelationship of the barriers for a more holistic representation.
Results from the deterministic analysis has suggested barriers that relate to technology, while findings from the dynamics has identified the people aspect as the core barrier for BIM adoption.
This study has contributed in establishing a methodology that integrates the dynamic approach with the deterministic data towards providing a more holistic representation of a system that further enables the identification of holistic solutions that would address the core barriers inhibiting the implementation of BIM education, particularly at Malaysian Universities.
Related Results
Der skal ikke lades sten på sten tilbage
Der skal ikke lades sten på sten tilbage
The Building by the Barbar TempleClose by the large temple at Barbar 1) lies a little tell, which was investigated in the spring of 1956. The tell was shown to cover a building of ...
MANAGING MALAYSIAN BORDER: THE CHALLENGES AND PROSPECTS IN MAINTAINING SECURITY
MANAGING MALAYSIAN BORDER: THE CHALLENGES AND PROSPECTS IN MAINTAINING SECURITY
This paper aims to examine the challenges encountered by Malaysia enforcement border agencies to protect the sovereignty of Malaysia and its prospects of integration among various ...
Perceived barriers to physical activity and their predictors among adults in the Central Region in Saudi Arabia: Gender differences and cultural aspects
Perceived barriers to physical activity and their predictors among adults in the Central Region in Saudi Arabia: Gender differences and cultural aspects
Objective
To assess the perceived barriers hindering physical activity among adult residents of Riyadh, Saudi Arabia, and to identify associated sociodemographic and health-related...
Managing Ethnicity and Constructing the Bangsa Malaysia (A United Malaysian Nation)*
Managing Ethnicity and Constructing the Bangsa Malaysia (A United Malaysian Nation)*
The question of nation-building has always been a central issue in Malaysian politics. Whilst the coun try has been able to sustain stable politics since the 1969 racial tragedy, s...
New Face of MJFAS
New Face of MJFAS
The Malaysian Journal of Fundamental and Applied Sciences (MJFAS), has come a long way since its beginnings in 2005 when six papers appeared in the first issue. As the Editor-in-Ch...
Exploration of latent barriers inhibiting project management processes in adopting smart building technologies (SBTs) in the developing countries
Exploration of latent barriers inhibiting project management processes in adopting smart building technologies (SBTs) in the developing countries
Purpose
While smart building technologies (SBTs) implementation ensures sustainability, their adoption is hampered by latent barriers, especially in project management processes. T...
Postgraduate students' experiences and perspectives on transformation of teaching and learning in tertiary education
Postgraduate students' experiences and perspectives on transformation of teaching and learning in tertiary education
PurposeTertiary education has been going through dramatic transformation in recent times. Such transformation is seen in teaching and learning at tertiary education. This study, th...
Key Barriers and Countermeasures for Implementing 10R Circular Economy for Construction and Demolition of Malaysian Infrastructure Projects
Key Barriers and Countermeasures for Implementing 10R Circular Economy for Construction and Demolition of Malaysian Infrastructure Projects
Abstract
The construction and demolition (C&D) sector in Malaysia contribute significantly to economic growth but also faces challenges related to excessive wast...


