Abstract The Morpeth project is the world's first application of a SeaStar®1 Mini-TLP and establishes that mono-column TLP's can be used to economically develop deepwater fields. This paper discusses the evolution and development of SeaStar technology and its niche in the deepwater platform market. Specifics of the Morpeth SeaStar platform are presented along with a discussion of some execution challenges that arose during the execution of this prototype project. Introduction The inventory of undeveloped deepwater discoveries is evidence that the offshore industry's ability to discover deepwater hydrocarbons exceeds its ability to economically exploit them. This inventory, which grew as deepwater wells were drilled, pointed out the need to develop more economic field development solutions for large and small deepwater fields. The Morpeth Field provides a specific example of discovery, deferral, and development of a deepwater discovery. Although discovered reserves were potentially substantial, proven reserves were not sufficient, or near enough to existing platform and pipeline infrastructure, to become a development priority in comparison to other opportunities in the operator's portfolio. Consequently, after the discovery was made, development was deferred. After a long offset subsea tie-back solution was deemed sub-optimal for this field, British-Borneo proposed a standalone SeaStar oil and gas production facility in the Morpeth Field to process oil and gas to pipeline specifications. This strategically located platform simplified the subsea system, improved flow assurance, increased recovery, and improved the economic attractiveness of future subsea developments in the area. The Morpeth Field development project was sanctioned in February 1997 and the SeaStar platform was fully installed by August 10, 1998. First production was achieved on October 11, 1998 despite interruptions in offshore hook-up operations by three named tropical storms, including a direct hit by Hurricane Earl in September 1998. Successful production operations at Morpeth prove that mono-column TLP's can be used to successfully develop fields in deepwater areas. Until Morpeth cost and schedule performance demonstrated otherwise, tension-leg mooring technology was widely believed to only be applicable to platforms that supported large numbers of dry trees. The Morpeth project demonstrates that tension-leg moorings provide reliable, cost-effective, stable, and expeditious means for mooring small deepwater platforms. The Morpeth project also achieved several other industry firsts including the first TLP hull fabricated in the USA, and the first TLP classed by a Classification Society.
Title: Morpeth SeaStar Mini-TLP
Description:
Abstract The Morpeth project is the world's first application of a SeaStar®1 Mini-TLP and establishes that mono-column TLP's can be used to economically develop deepwater fields.
This paper discusses the evolution and development of SeaStar technology and its niche in the deepwater platform market.
Specifics of the Morpeth SeaStar platform are presented along with a discussion of some execution challenges that arose during the execution of this prototype project.
Introduction The inventory of undeveloped deepwater discoveries is evidence that the offshore industry's ability to discover deepwater hydrocarbons exceeds its ability to economically exploit them.
This inventory, which grew as deepwater wells were drilled, pointed out the need to develop more economic field development solutions for large and small deepwater fields.
The Morpeth Field provides a specific example of discovery, deferral, and development of a deepwater discovery.
Although discovered reserves were potentially substantial, proven reserves were not sufficient, or near enough to existing platform and pipeline infrastructure, to become a development priority in comparison to other opportunities in the operator's portfolio.
Consequently, after the discovery was made, development was deferred.
After a long offset subsea tie-back solution was deemed sub-optimal for this field, British-Borneo proposed a standalone SeaStar oil and gas production facility in the Morpeth Field to process oil and gas to pipeline specifications.
This strategically located platform simplified the subsea system, improved flow assurance, increased recovery, and improved the economic attractiveness of future subsea developments in the area.
The Morpeth Field development project was sanctioned in February 1997 and the SeaStar platform was fully installed by August 10, 1998.
First production was achieved on October 11, 1998 despite interruptions in offshore hook-up operations by three named tropical storms, including a direct hit by Hurricane Earl in September 1998.
Successful production operations at Morpeth prove that mono-column TLP's can be used to successfully develop fields in deepwater areas.
Until Morpeth cost and schedule performance demonstrated otherwise, tension-leg mooring technology was widely believed to only be applicable to platforms that supported large numbers of dry trees.
The Morpeth project demonstrates that tension-leg moorings provide reliable, cost-effective, stable, and expeditious means for mooring small deepwater platforms.
The Morpeth project also achieved several other industry firsts including the first TLP hull fabricated in the USA, and the first TLP classed by a Classification Society.

Related Results

Morpeth Field Development Overview
Morpeth Field Development Overview
Abstract The Morpeth Field is located in the Ewing Bank area of the Gulf of Mexico in 1,670 feet of water. British-Borneo acquired the field in 1995 from Shell Of...
New Directions in TLP Technology
New Directions in TLP Technology
Abstract Of the many deepwater platform concepts that were developed as deepwater platform technology matured, the TLP has been the most frequently selected for d...
Challenges of TLP Installation Offshore Brazil
Challenges of TLP Installation Offshore Brazil
Abstract Installation of a Tension Leg Platform comprises distinct phases, all of which can provide special challenges when considering locating a TLP in a fronti...
Auger TLP Well System Challenges and Innovations
Auger TLP Well System Challenges and Innovations
ABSTRACT The Auger TLP well system has successfully employed novel features to satisfy challenging design requirements of drilling, completing, and producing near...
The Seastar Tension-Leg Platform
The Seastar Tension-Leg Platform
ABSTRACT The Seastar Tension-Leg Platform (TLP) family has been developed to unlock the economic potential of discovered, but as yet undeveloped, deepwater fields...
CryoSeek identification of glycofibrils with diverse compositions and structural assemblies
CryoSeek identification of glycofibrils with diverse compositions and structural assemblies
Abstract Last year, we reported CryoSeek, a research strategy that employs cryo-electron microscopy (cryo-EM) to discover novel bio-entities from any accessible source,...
An Integrated Motion and Structural Analysis for Tension Leg Platforms
An Integrated Motion and Structural Analysis for Tension Leg Platforms
Abstract The tension leg platform (TLP) concept has become increasingly popular as oil reservoirs, once considered too deep to recover, now contain the financial ...
Morpeth Export System
Morpeth Export System
Abstract British-Borneo Exploration Inc.'s Morpeth export system introduces two industry firsts -- the use of a diverless piggableb tie-in sled installed in a sta...