Critical success factors for large building construction projects

View through CrossRef
Purpose The literature revealed a limited number of studies on critical success factors (CSFs) in Saudi Arabia. These studies were either outdated, covered limited factors or focused on very specific issues of a project. In response to this knowledge gap, the purpose of this paper is to identify and assess the factors which affect the success of construction projects in Saudi Arabia. Design/methodology/approach In all, 91 CSFs were identified from the literature, and grouped under eight categories according to categorization schemes adopted by earlier studies and common characteristics shared by the factors. A questionnaire survey was adopted since it permits the collection of large volumes of data in a short period. In total, 61 responses from industry experts were used to compute the significance index for each factor and rank the most CSFs. Findings Contractors viewed the three most significant CSFs as “competency and capability of the contractors’ key personnel in different disciplines,” “adequacy of labor resources and their skills” and “the impact of the project on the public.” Consultants viewed the three most significant CSFs as “competency and capability of the consultants’ key personnel in different disciplines,” “clear communication channels between the owner/PM and the designer” and “PM competency, authority and involvement.” Originality/value Although a significant number of studies have investigated CSFs for construction projects, these studies do not provide an extensive list of CSFs, and none have studied CSFs in large-scale construction projects in Saudi Arabia from the viewpoint of two key stakeholders. This study attempts to address this knowledge gap.
Title: Critical success factors for large building construction projects
Description:
Purpose The literature revealed a limited number of studies on critical success factors (CSFs) in Saudi Arabia.
These studies were either outdated, covered limited factors or focused on very specific issues of a project.
In response to this knowledge gap, the purpose of this paper is to identify and assess the factors which affect the success of construction projects in Saudi Arabia.
Design/methodology/approach In all, 91 CSFs were identified from the literature, and grouped under eight categories according to categorization schemes adopted by earlier studies and common characteristics shared by the factors.
A questionnaire survey was adopted since it permits the collection of large volumes of data in a short period.
In total, 61 responses from industry experts were used to compute the significance index for each factor and rank the most CSFs.
Findings Contractors viewed the three most significant CSFs as “competency and capability of the contractors’ key personnel in different disciplines,” “adequacy of labor resources and their skills” and “the impact of the project on the public.
” Consultants viewed the three most significant CSFs as “competency and capability of the consultants’ key personnel in different disciplines,” “clear communication channels between the owner/PM and the designer” and “PM competency, authority and involvement.
” Originality/value Although a significant number of studies have investigated CSFs for construction projects, these studies do not provide an extensive list of CSFs, and none have studied CSFs in large-scale construction projects in Saudi Arabia from the viewpoint of two key stakeholders.
This study attempts to address this knowledge gap.

Related Results

De gevel – een intermediair element tussen buiten en binnen
De gevel – een intermediair element tussen buiten en binnen
This study is based on the fact that all people have a basic need for protection from other people (and animals) as well as from the elements (the exterior climate). People need a ...
Architecture and adaptation
Architecture and adaptation
«The architectural work transcends the architect, goes beyond the moment in which its construction takes place, and therefore can be contemplated under the changing lights of histo...
Unveiling Construction Quality Factors: Insights from Asian Economy's Building Projects
Unveiling Construction Quality Factors: Insights from Asian Economy's Building Projects
Economic growth of any country depends on the construction projects and industry in the region. Therefore, the construction industry in Pakistan is directly related to quality and ...
Der skal ikke lades sten på sten tilbage
Der skal ikke lades sten på sten tilbage
The Building by the Barbar TempleClose by the large temple at Barbar 1) lies a little tell, which was investigated in the spring of 1956. The tell was shown to cover a building of ...
Performative Microforests
Performative Microforests
The design of office buildings can substantially improve the building, social, and ecological performance of office building projects. However, existing research on improving the p...
The integration of BIM in the application of green building materials in construction projects
The integration of BIM in the application of green building materials in construction projects
In recent years, with the growing call for sustainable development, green building materials, which are of great meaning for reducing resource and environmental impacts, have attra...
Impact of Leadership Styles on Government Construction Project Success: A Structural Equation Modeling Approach
Impact of Leadership Styles on Government Construction Project Success: A Structural Equation Modeling Approach
Government construction projects play an important role in both developed and developing countries. They contribute about 80% of total capital assets, 10 % of GDP, and more than 50...
Success criteria-based impacts of risk factors on education building projects in southwestern Nigeria
Success criteria-based impacts of risk factors on education building projects in southwestern Nigeria
Purpose Despite the huge capital outlay in tertiary education building projects (TEBP), these projects undoubtedly failed in meeting the set objectives of cost, time and quality, a...