Construction Sequence Simulation for Partial Cable Stayed Truss Bridge with Single Pylon

View through CrossRef
<p> Qiansimen Bridge, a part of Liangjiang Bridge in Chongqing city in China, is currently under construction by the Chinese contractor CCCC, Second Harbor Engineering Company Ltd. The bridge has been designed by T.Y. Lin International (China) as partially cable stayed bridge with steel truss girders and a single reinforced concrete pylon. The opening of the bridge is planned for July 2014. Each steel truss segment has a length of 16 m and forms an extremely heavy element of the bridge, which cannot be fabricated and erected in one piece. Stay cable forces vary between 10 000 and 15 000 kN during erection phase and in final state. Proper layout and adjustment of cable forces throughout the construction schedule is usually a tedious process. This paper presents an ingenious numerical simulation of the bridge construction sequence, where the erection process is accurately followed up by appropriate techniques. Result of the simulation is an optimized construction sequence of the steel truss, which on the one hand leads to a reasonable stress distribution in the truss elements and on the other hand allows for saving construction costs by avoiding multiple adjustments of stay cable forces during the construction process.</p>
International Association for Bridge and Structural Engineering (IABSE)
Title: Construction Sequence Simulation for Partial Cable Stayed Truss Bridge with Single Pylon
Description:
<p> Qiansimen Bridge, a part of Liangjiang Bridge in Chongqing city in China, is currently under construction by the Chinese contractor CCCC, Second Harbor Engineering Company Ltd.
The bridge has been designed by T.
Y.
Lin International (China) as partially cable stayed bridge with steel truss girders and a single reinforced concrete pylon.
The opening of the bridge is planned for July 2014.
Each steel truss segment has a length of 16 m and forms an extremely heavy element of the bridge, which cannot be fabricated and erected in one piece.
Stay cable forces vary between 10 000 and 15 000 kN during erection phase and in final state.
Proper layout and adjustment of cable forces throughout the construction schedule is usually a tedious process.
This paper presents an ingenious numerical simulation of the bridge construction sequence, where the erection process is accurately followed up by appropriate techniques.
Result of the simulation is an optimized construction sequence of the steel truss, which on the one hand leads to a reasonable stress distribution in the truss elements and on the other hand allows for saving construction costs by avoiding multiple adjustments of stay cable forces during the construction process.
</p>.

Related Results

SEISMIC VULNERABILITY ANALYSIS OF CABLE-STAYED BRIDGE DURING ROTATION CONSTRUCTION
SEISMIC VULNERABILITY ANALYSIS OF CABLE-STAYED BRIDGE DURING ROTATION CONSTRUCTION
          Due to the swivel construction, the structural redundancy of cable-stayed bridge is reduced, and its seismic vulnerability is significantly higher than that of non-swirli...
Parametric Design of Scroll-shaped Pylon of Single Tower Cable-stayed Bridge
Parametric Design of Scroll-shaped Pylon of Single Tower Cable-stayed Bridge
Using single-tower cable-stayed bridge as example, this article introduces the design and construction process of a cable-stayed bridge with a scroll-shaped tower, as well as the o...
Mechanical Analysis of Stayed Bridge
Mechanical Analysis of Stayed Bridge
Cable stayed bridge, also known as the cable-stayed bridge is of box girder with many cable directly to the towers is a kind of bridge, is by the pressure of the tower, tension of ...
Economical Aspect of Truss Design Through Geometry Configuration
Economical Aspect of Truss Design Through Geometry Configuration
In engineering, truss structures are used extensively in bridge, tower, building, and numerous mechanical applications. Several studies have found that truss frames use the least s...
Study on Application and Practice of Variable Axial Force Cable in Reinforcement System of Powerhouse Truss
Study on Application and Practice of Variable Axial Force Cable in Reinforcement System of Powerhouse Truss
Long-span steel structure trusses are widely used in factory buildings, but with the growth of service time and the increase of dynamic load fatigue, a considerable part of the lon...
Construction control of cable-stayed bridges
Construction control of cable-stayed bridges
This work presents a study of the simulation of cable-stayed bridges built on temporary supports focused on their response during construction and in service. To simulate the behav...
Numerical Analysis of Long-Span Cable-Stayed Bridge in the Construction Phase
Numerical Analysis of Long-Span Cable-Stayed Bridge in the Construction Phase
The fabrication and erection of cable-stayed bridges involve major changes in structure configuration through the addition and removal of structure components. In every stage of th...