Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Horizontal Well Length: Drill Short or Long Wells?

View through CrossRef
Abstract In a previous paper Ref. 1 it was mentioned that the reserves of horizontal wells of heavy oil over water is not linearly related to the well length. A series of workovers were performed to verily this conclusion. New wells were especially designed to account for the non-linear relationship between reserves and length for wells longer than the optimum for reserves per meter. This paper is an update with regard to the technique of segmenting the well and producing different segments separately. The main criteria for the success of the technique is to increase the reserve of the well while maintaining a relatively high oil rate to maximize revenue. Details of a new water shut-off method specifically suitable to water conning is described in detail. Introduction The Winter field (Fig. 1) has been developed utilizing horizontal wells to produce heavy oil (13.7 API oil of 2800 cp. viscosity) in a 12 m (37 ft.) thick Cummings sand underlain by a very strong aquifer. Ref. 1 showed that the reserve per well for the first six phases (each year program is called a phase) is the same despite the fact that the average well length for the different phases varied from 574m. (1883 ft.) to 1111 m. (3645 ft.). It also showed that for over 250 horizontal wells, producing oil over water reservoirs in Saskatchewan, the reserves per well is not linearly related to the well length once the well length is longer than 500 m. (1640 ft.). Both of the above lead to assume that for a long well (longer than a critical value around the 500 m) the nature of the pressure distribution in the wellbore and sand face together with the oil water interface being close, premature conning takes place close to the heal of the well. Once the water table establishes communication to the wellbore, say, 300m. from the heal the well is reduced to 300m long well as far as oil production is concerned. Most of the drawdown will be satisfied by the less viscous water coming from the infinite acting aquifer, and oil production, from the pump intake at the heel to the water entry point, will quickly vanish. The above diagnosis led to two corrective approaches:try to shut-off the water cone by injecting water shut-off material, andtry to isolate the suspected area of the water cone mechanically. Water Shut-off Treatments For a long time the oil industry has been looking for the ideal, cheap, reversible, non-damaging anti-conning or water shutoff material. Now if we can find a smart fluid that when hot it behaves just like water, preferentially displaces water and as it cools off it becomes less mobile (a solid); it would be ideal for use as a water shut-off material. If with such material the well inflow is reduced below economic values it is easy to restore some inflow. Hot water injection into the well will heat up the well bore and sand-face rendering the material mobile again. Once the well is pumped some of the material will be produced and the productivity of the well is improved. Wax, yes normal problem causing paraffin wax, was the material of choice. A refinery supplied two samples of paraffin wax, one of them has a melting point of 38-40 degrees C (100–102 F) was considered perfect for the Winter Field of reservoir temperature of 26 degree C (79 F). When the wax is heated to 60-90 degree C (140–195 F) it is very fluid with a viscosity much closer to water than to the 3000 cp. oil. When a well waters out it is very difficult to induce a draw down even with a high rate of production. If we inject water into the well, it takes it on vacuum. In other words wellbore flow resistance is reduced dramatically. This was another reason to choose hot wax. P. 423
Title: Horizontal Well Length: Drill Short or Long Wells?
Description:
Abstract In a previous paper Ref.
1 it was mentioned that the reserves of horizontal wells of heavy oil over water is not linearly related to the well length.
A series of workovers were performed to verily this conclusion.
New wells were especially designed to account for the non-linear relationship between reserves and length for wells longer than the optimum for reserves per meter.
This paper is an update with regard to the technique of segmenting the well and producing different segments separately.
The main criteria for the success of the technique is to increase the reserve of the well while maintaining a relatively high oil rate to maximize revenue.
Details of a new water shut-off method specifically suitable to water conning is described in detail.
Introduction The Winter field (Fig.
1) has been developed utilizing horizontal wells to produce heavy oil (13.
7 API oil of 2800 cp.
viscosity) in a 12 m (37 ft.
) thick Cummings sand underlain by a very strong aquifer.
Ref.
1 showed that the reserve per well for the first six phases (each year program is called a phase) is the same despite the fact that the average well length for the different phases varied from 574m.
(1883 ft.
) to 1111 m.
(3645 ft.
).
It also showed that for over 250 horizontal wells, producing oil over water reservoirs in Saskatchewan, the reserves per well is not linearly related to the well length once the well length is longer than 500 m.
(1640 ft.
).
Both of the above lead to assume that for a long well (longer than a critical value around the 500 m) the nature of the pressure distribution in the wellbore and sand face together with the oil water interface being close, premature conning takes place close to the heal of the well.
Once the water table establishes communication to the wellbore, say, 300m.
from the heal the well is reduced to 300m long well as far as oil production is concerned.
Most of the drawdown will be satisfied by the less viscous water coming from the infinite acting aquifer, and oil production, from the pump intake at the heel to the water entry point, will quickly vanish.
The above diagnosis led to two corrective approaches:try to shut-off the water cone by injecting water shut-off material, andtry to isolate the suspected area of the water cone mechanically.
Water Shut-off Treatments For a long time the oil industry has been looking for the ideal, cheap, reversible, non-damaging anti-conning or water shutoff material.
Now if we can find a smart fluid that when hot it behaves just like water, preferentially displaces water and as it cools off it becomes less mobile (a solid); it would be ideal for use as a water shut-off material.
If with such material the well inflow is reduced below economic values it is easy to restore some inflow.
Hot water injection into the well will heat up the well bore and sand-face rendering the material mobile again.
Once the well is pumped some of the material will be produced and the productivity of the well is improved.
Wax, yes normal problem causing paraffin wax, was the material of choice.
A refinery supplied two samples of paraffin wax, one of them has a melting point of 38-40 degrees C (100–102 F) was considered perfect for the Winter Field of reservoir temperature of 26 degree C (79 F).
When the wax is heated to 60-90 degree C (140–195 F) it is very fluid with a viscosity much closer to water than to the 3000 cp.
oil.
When a well waters out it is very difficult to induce a draw down even with a high rate of production.
If we inject water into the well, it takes it on vacuum.
In other words wellbore flow resistance is reduced dramatically.
This was another reason to choose hot wax.
P.
423.

Related Results

Survey Of Horizontal Gas Well Activity
Survey Of Horizontal Gas Well Activity
Abstract This paper presents the results of a survey on horizontal gas well activity throughout the world. The survey was conducted for the Gas Research Institute...
A Simple Productivity Equation for Horizontal Wells Based on Drainage Area Concept
A Simple Productivity Equation for Horizontal Wells Based on Drainage Area Concept
SPE Members Abstract Many flow equations have been developed for horizontal wells but they are complicated in derivation and tim...
Stimulation of Horizontal Wells In Shell Canada Limited
Stimulation of Horizontal Wells In Shell Canada Limited
Abstract The design and results of stimulation treatments in Shell Canada's horizontal wells to 1993 are discussed. Shell Canada's experience with horizontal well...
Fatigue Analysis Of Norman Wells Drill String
Fatigue Analysis Of Norman Wells Drill String
Abstract This paper summarizes the analysis procedures that Esso Resources Canada used to develop a drill string inspection frequency for drilling the Norman Well...
Pressure Transient Analysis for Horizontal Well and Multi-Branched Horizontal Wells
Pressure Transient Analysis for Horizontal Well and Multi-Branched Horizontal Wells
Abstract Transient pressure for cases of a horizontal wellbore axis with any angle inclined to a fault or a constant pressure supply boundary in anisotropic forma...
Steam Stimulation In Horizontal Wells Pilot Test In Venezuela
Steam Stimulation In Horizontal Wells Pilot Test In Venezuela
Abstract MARAVEN has initiated steam stimulation of horizontal wells using two processes: conventional Cyclic Steam Stimulation (CSS) and Single-Well Steam Circul...
A New Completion Technology to Improve Horizontal Well Performances
A New Completion Technology to Improve Horizontal Well Performances
Abstract Some recent research results have shown that especially for long horizontal wells with relatively high rate, when the friction loss plays a significant r...

Back to Top