Javascript must be enabled to continue!
Sinop Balatlar Excavation Pebble Mosaic Pavement
View through CrossRef
During the 2022 Sinop Balatlar Excavation, a pebble stone mosaic floor was unearthed. The design of the mosaic, which adorns the andron room of a private residence, is U-shaped and the east-west kline sections are planned without decoration. The pebble floor placed horizontally and vertically on a pink nucleus is called the “hedgehog” model. Surrounded by ranke, wave and palmette motifs, a small part of the mosaic, which we think shows a flying Eros and his wingtips on it, has been preserved in the southwestern corner of the main panel. It is very important with the placement technique of the stones on it and the pattern repertoire created with white pebbles on a black ground. Compared to contemporary examples, the pebble mosaic dated to the end of the 5th century BC includes the Gordion and Olynthos mosaics, where the mosaic tradition in Asia Minor dates back, it occupies an important place in the ancient mosaic chronology as it indicates its existence in the 5th century BC.
Title: Sinop Balatlar Excavation Pebble Mosaic Pavement
Description:
During the 2022 Sinop Balatlar Excavation, a pebble stone mosaic floor was unearthed.
The design of the mosaic, which adorns the andron room of a private residence, is U-shaped and the east-west kline sections are planned without decoration.
The pebble floor placed horizontally and vertically on a pink nucleus is called the “hedgehog” model.
Surrounded by ranke, wave and palmette motifs, a small part of the mosaic, which we think shows a flying Eros and his wingtips on it, has been preserved in the southwestern corner of the main panel.
It is very important with the placement technique of the stones on it and the pattern repertoire created with white pebbles on a black ground.
Compared to contemporary examples, the pebble mosaic dated to the end of the 5th century BC includes the Gordion and Olynthos mosaics, where the mosaic tradition in Asia Minor dates back, it occupies an important place in the ancient mosaic chronology as it indicates its existence in the 5th century BC.
Related Results
Piece by piece: Collaborative mosaic-making for inclusive policy development
Piece by piece: Collaborative mosaic-making for inclusive policy development
This report sets out the findings from one of four projects commissioned by Wellcome Policy Lab to pilot creative approaches to policy development. In this project, Scientia Script...
Sinop Balatlar Kilisesi Örnekleri Işığında Erken Bizans Dönemi Mozaiklerindeki Kuş Figürlerinin İkonografisi
Sinop Balatlar Kilisesi Örnekleri Işığında Erken Bizans Dönemi Mozaiklerindeki Kuş Figürlerinin İkonografisi
Bu çalışmanın konusunu Sinop Balatlar Kilisesi Kazısında açığa çıkarılan adak mozaiklerinde görülen kuş figürleri ve ikonografileri oluşturmaktadır. 2016-2021 yılları arasında yürü...
Study on the Seismic Effect of the Pebble Soil Site in the Zhongwei Basin
Study on the Seismic Effect of the Pebble Soil Site in the Zhongwei Basin
Based on a large amount of drilling and geophysical exploration work in the Zhongwei Basin, and combined with the collected borehole data of a seismic safety assessment, this paper...
Planetary core formation via multispecies pebble accretion
Planetary core formation via multispecies pebble accretion
ABSTRACT
In the general classical picture of pebble-based core growth, planetary cores grow by accretion of single pebble species. The growing planet may reach the s...
KINERJA MODEL PERKERASAN JALAN DENGAN BLOK PENGAKU
KINERJA MODEL PERKERASAN JALAN DENGAN BLOK PENGAKU
One of the factors causing the cracking of rigid pavement surfaces for roadways is the occurrence of tensile stresses due to vehicle wheel loads that exceed the tensile stresses of...
Development of a Continuous Testing Device for Pavement Structure Bearing Capacity
Development of a Continuous Testing Device for Pavement Structure Bearing Capacity
Pavement structure bearing capacity is an important evaluation parameter in pavement design, construction, maintenance management, and reconstruction, and is generally expressed by...
Decision-making system and verification of pavement diseases treatment scheme for highway reconstruction and extension
Decision-making system and verification of pavement diseases treatment scheme for highway reconstruction and extension
Abstract
Based on the case of a highway reconstruction and extension project in Guangdong Province, a decision-making system for the treatment of the old pavement...
Pebble Macro Tree Transducers with Strong Pebble Handling
Pebble Macro Tree Transducers with Strong Pebble Handling
We consider pebble macro tree transducers with call-by-name semantics and strong pebble handling. The latter means that the last dropped pebble can be lifted regardless of the posi...

