Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Optimisation Study of Production-Injection Ratio for Steam Flooding

View through CrossRef
Abstract Production-injection ratio (PIR) is one of the most important factors to affect steam flooding performance. Previous research and field applications of steam flooding have confirmed a common conclusion that the production- injection ratio should not be less 1.2 to achieve higher oil recovery for a conventional heavy oil reservoir. This paper presents the optimization study of production-injection ratio for an unconventional heavy oil reservoir with edge/bottom water. Aimed to Jin 45 Block of Liaohe Oilfield, experimental and numerical simulations are carried out and sensibility analyses are focused on the effect of aquifer size. Compared to the conventional heavy oil reservoir, the results of this study have validated as follows:The optimum production-injection ratio (OPIR) of Jin 45 block steam flooding is significantly dependent on the size of its aquifer. Actually, if only the reservoir pressure is available to steam flooding, the OPIR will reduce with aquifer increasing.With the aquifer increasing, the reservoir pressure before steam flooding will relatively increases, thus steam specific volume decreasing and production-injection balance point removing.The difference of production-injection ratio reflects a balance relationship between production and injection underground. For a heavy oil reservoir with edge water, production-injection balance should be completely maintained to prevent water invading which will seriously lead to bad thermal efficiency of steam flooding.Note that the OPIR should be understood as an average concept. Essentially, the production-injection ratio is differently implemented at different stages of steam flooding. Hence, the interval ratio will be corresponding different. This paper suggests that actual reservoir condition and production performance should be globally taken into account to optimize the production-injection ratio at every stage of steam flooding. It is a considerable strategy to satisfy the management requirement of steam flooding program.
Title: Optimisation Study of Production-Injection Ratio for Steam Flooding
Description:
Abstract Production-injection ratio (PIR) is one of the most important factors to affect steam flooding performance.
Previous research and field applications of steam flooding have confirmed a common conclusion that the production- injection ratio should not be less 1.
2 to achieve higher oil recovery for a conventional heavy oil reservoir.
This paper presents the optimization study of production-injection ratio for an unconventional heavy oil reservoir with edge/bottom water.
Aimed to Jin 45 Block of Liaohe Oilfield, experimental and numerical simulations are carried out and sensibility analyses are focused on the effect of aquifer size.
Compared to the conventional heavy oil reservoir, the results of this study have validated as follows:The optimum production-injection ratio (OPIR) of Jin 45 block steam flooding is significantly dependent on the size of its aquifer.
Actually, if only the reservoir pressure is available to steam flooding, the OPIR will reduce with aquifer increasing.
With the aquifer increasing, the reservoir pressure before steam flooding will relatively increases, thus steam specific volume decreasing and production-injection balance point removing.
The difference of production-injection ratio reflects a balance relationship between production and injection underground.
For a heavy oil reservoir with edge water, production-injection balance should be completely maintained to prevent water invading which will seriously lead to bad thermal efficiency of steam flooding.
Note that the OPIR should be understood as an average concept.
Essentially, the production-injection ratio is differently implemented at different stages of steam flooding.
Hence, the interval ratio will be corresponding different.
This paper suggests that actual reservoir condition and production performance should be globally taken into account to optimize the production-injection ratio at every stage of steam flooding.
It is a considerable strategy to satisfy the management requirement of steam flooding program.

Related Results

Steam-CO Recovery Processes For Bottom Water Oil Reservoirs
Steam-CO Recovery Processes For Bottom Water Oil Reservoirs
Abstract Based on Pujol and Boberg's scaling criteria, a series of experiments on steam-CO2 injection strategies was conducted in a high temperature, high pressur...
TINBOP Cyclic Steam Injection Enhances Oil Recovery in Mature Steamfloods
TINBOP Cyclic Steam Injection Enhances Oil Recovery in Mature Steamfloods
Abstract In a previous paper (SPE/PS-CIM/CHOA 97850), we presented our findings on a novel cyclic steam injection method that we developed. The Top-Injection Bott...
Overview of Key Zonal Water Injection Technologies in China
Overview of Key Zonal Water Injection Technologies in China
Abstract Separated layer water injection is the important technology to realize the oilfield long-term high and stable yield. Through continuous researches and te...
Mechanism Study on Foam Flooding for Daqing Reservoirs After Polymer Flooding
Mechanism Study on Foam Flooding for Daqing Reservoirs After Polymer Flooding
Abstract Polymer flooding has been carried out widely in Daqing oilfield. The average oil recovery was 53% and the water cut was more than 90% after polymer flooding...
Studies On Foam Flooding EOR Technique For Daqing Reservoirs After Polymer Flooding
Studies On Foam Flooding EOR Technique For Daqing Reservoirs After Polymer Flooding
Abstract Most of the high permeability reservoirs in Daqing oil field have been conducted by water flooding and polymer flooding. The average oil reco...
Fire-flooding Technologies in Post-Steam-Injected Heavy Oil Reservior:A Successful Example of CNPC
Fire-flooding Technologies in Post-Steam-Injected Heavy Oil Reservior:A Successful Example of CNPC
Abstract Steam injection is an effective technology for heavy oil development. With the increasing of the recovery percent, the technical effectiveness and economic ...
Synergistic Flooding and Gravity Drainage by Steam and Gas
Synergistic Flooding and Gravity Drainage by Steam and Gas
Synergistic flooding and gravity drainage by steam and gas (SFGD) is an innovative alternative to SAGD and SAGP, considering its potential to enhance oil recovery and improve oil p...

Back to Top