PR-328-203803-R01 Improve ILI Sizing Accuracy

View through CrossRef
This multi-phased PHMSA/PRCI project aims to conduct a collaborative study (pipeline operators, ILI Technology Providers (TPs), subject matter experts, and consultants) to quantitatively measure and improve the detection and sizing capabilities of current corrosion ILI systems. A data-driven approach was used which identified problematic corrosion profiles based on the review of recent Root-Cause-Analysis reports of corrosion-related failures to design and construct an ILI corrosion test string containing features having similar profiles. All such profiles were then documented using the best possible NDE techniques. Three participating ILI TPs proposed appropriate inspection tools based on limited knowledge of the integrity conditions in the test string. A series of blind pull-through tests of the ILI systems were carried out, where the TPs delivered standard ILI reports for performance evaluation. The ILI TPs receive detailed feedback identifying the detection and sizing gaps. They are given a limited sample of detailed anomaly profile data to identify potential sources of detection and sizing improvement. A second series of ILI tests are performed and the changes in detection and sizing are analyzed and quantified for each problematic corrosion profile, identifying the improvements and the remaining gaps. The results and findings of this 3.5-year long project are presented in this Report. This research was funded in part under the Department of Transportation, Pipeline and Hazardous Materials Safety Administration's Pipeline Safety Research and Development Program. The views and conclusions contained in this document are those of the authors and should not be interpreted as representing the official policies, either expressed or implied, of the Pipeline and Hazardous Materials Safety Administration, or the U.S. Government.
Pipeline Research Council International, Inc. (PRCI)
Title: PR-328-203803-R01 Improve ILI Sizing Accuracy
Description:
This multi-phased PHMSA/PRCI project aims to conduct a collaborative study (pipeline operators, ILI Technology Providers (TPs), subject matter experts, and consultants) to quantitatively measure and improve the detection and sizing capabilities of current corrosion ILI systems.
A data-driven approach was used which identified problematic corrosion profiles based on the review of recent Root-Cause-Analysis reports of corrosion-related failures to design and construct an ILI corrosion test string containing features having similar profiles.
All such profiles were then documented using the best possible NDE techniques.
Three participating ILI TPs proposed appropriate inspection tools based on limited knowledge of the integrity conditions in the test string.
A series of blind pull-through tests of the ILI systems were carried out, where the TPs delivered standard ILI reports for performance evaluation.
The ILI TPs receive detailed feedback identifying the detection and sizing gaps.
They are given a limited sample of detailed anomaly profile data to identify potential sources of detection and sizing improvement.
A second series of ILI tests are performed and the changes in detection and sizing are analyzed and quantified for each problematic corrosion profile, identifying the improvements and the remaining gaps.
The results and findings of this 3.
5-year long project are presented in this Report.
This research was funded in part under the Department of Transportation, Pipeline and Hazardous Materials Safety Administration's Pipeline Safety Research and Development Program.
The views and conclusions contained in this document are those of the authors and should not be interpreted as representing the official policies, either expressed or implied, of the Pipeline and Hazardous Materials Safety Administration, or the U.
S.
Government.

Related Results

Što sve možemo spoznati iz hematološkog nalaza kompletne krvne slike
Što sve možemo spoznati iz hematološkog nalaza kompletne krvne slike
Kompletna krvna slika (KKS) je zasigurno najčešća pretraga koju liječnici zadaju bez obzira na razinu zdravstvene zaštite u kojoj rade. Razlog tome je brzi uvid u ukupno zdravlje p...
PR-244-153719-R01 Quantification of ILI Sizing Uncertainties and Improving Correction Factors
PR-244-153719-R01 Quantification of ILI Sizing Uncertainties and Improving Correction Factors
Operators routinely perform verification digs to assess whether an inline inspection (ILI) tool meets the performance specified by the ILI vendors. Characterizing the actual ILI to...
ILI to ILI Comparisons: Quantifying the Impact of Multiple Inspections
ILI to ILI Comparisons: Quantifying the Impact of Multiple Inspections
Det Norske Veritas (U.S.A.), Inc. (DNV GL) prepared this paper in order to study the repeatability of inspection results between subsequent in-line inspections. DNV GL has access t...
Abstract Or101: Evaluating the National Institutes of Health Pipeline for Resuscitation Science Investigators
Abstract Or101: Evaluating the National Institutes of Health Pipeline for Resuscitation Science Investigators
Background: The pipeline of investigators studying resuscitation science and their contributions to the field after attaining research independence are largely unknown....
Challenges and solutions: Pandemic 2009 H1N1 influenza A in a pediatric emergency department
Challenges and solutions: Pandemic 2009 H1N1 influenza A in a pediatric emergency department
Objective: The purpose of this study was to describe the impact of the 2009 H1N1 influenza pandemic on a pediatric emergency department (ED) at a freestanding children’s hospital i...
Modeling Pipeline Metal Loss Defects at Tool Speed
Modeling Pipeline Metal Loss Defects at Tool Speed
Accurate defect sizing is crucial for maintaining effective pipeline safety and operation. Under growing pressure from local, national and world organizations, pipeline operators d...
An ILI Based Program That Prevents Reoccurrence of Post ILI Failures Seen in Industry
An ILI Based Program That Prevents Reoccurrence of Post ILI Failures Seen in Industry
The pipeline industry has been using Inline Inspection (ILI) since the 1970s. High resolution tools have been available for inspecting corrosion from about the 1980s and related IL...