Javascript must be enabled to continue!
Research and Application of Containment Structural Health Monitoring System During Operation of Nuclear Power Plant
View through CrossRef
Abstract
The containment of the nuclear power plant is an important item of the tolerance nuclear steam supply system. It is the third barrier to prevent radioactive waste from leakage after an accident. It is the most important structure of nuclear power plant ensuring the safety of nuclear power plants. To ensure that the containment meets the design requirements during the service period during service, Structure integrity test is done every ten years to verify whether the performance of the containment meets the design requirements. However, through the cycle Structure integrity test, the structural state of the containment is obtained every ten years. It is unable to obtained in real time. When the accident conditions occur, the structural state of the containment cannot be evaluated quickly and unable to assist the containment related decision -making. In order to ensure the safe operation of the containment during the service time, at the same time improve the intelligent level of the safety monitoring of the containment, developing a set of intelligent monitoring and evaluation and early warning systems to achieve daily monitoring, abnormal state warning, healthy real-time real-time monitoring, abnormal state warning, abnormal state warning, abnormal state early warning, healthy Status assessment are very necessary.
American Society of Mechanical Engineers
Title: Research and Application of Containment Structural Health Monitoring System During Operation of Nuclear Power Plant
Description:
Abstract
The containment of the nuclear power plant is an important item of the tolerance nuclear steam supply system.
It is the third barrier to prevent radioactive waste from leakage after an accident.
It is the most important structure of nuclear power plant ensuring the safety of nuclear power plants.
To ensure that the containment meets the design requirements during the service period during service, Structure integrity test is done every ten years to verify whether the performance of the containment meets the design requirements.
However, through the cycle Structure integrity test, the structural state of the containment is obtained every ten years.
It is unable to obtained in real time.
When the accident conditions occur, the structural state of the containment cannot be evaluated quickly and unable to assist the containment related decision -making.
In order to ensure the safe operation of the containment during the service time, at the same time improve the intelligent level of the safety monitoring of the containment, developing a set of intelligent monitoring and evaluation and early warning systems to achieve daily monitoring, abnormal state warning, healthy real-time real-time monitoring, abnormal state warning, abnormal state warning, abnormal state early warning, healthy Status assessment are very necessary.
Related Results
Evaluation on CAP1400 Passive Containment Cooling System Capability
Evaluation on CAP1400 Passive Containment Cooling System Capability
CAP1400 is the large advanced passive demonstration plant, which is one of the National Science and Technology Major Projects. CAP1400 is an innovative design and development based...
Radiation Evaluation System for Radiation Releasing Environment of Nuclear Power Plant Based on Domain-Driven Design
Radiation Evaluation System for Radiation Releasing Environment of Nuclear Power Plant Based on Domain-Driven Design
In order to meet the sustainable development demand for energy, developing nuclear power actively has become an important means for the country to improve energy supply pattern and...
Research on Flow Characteristics of Top and Vertical Containment Surface With Different Structures
Research on Flow Characteristics of Top and Vertical Containment Surface With Different Structures
Following an accident, the passive nuclear power plant CAP1400 mainly uses cooling water evaporation on the outer containment surface to remove the decay heat inside containment to...
Seismic Margin Assessment and Improvements of Qinshan Nuclear Power Plant
Seismic Margin Assessment and Improvements of Qinshan Nuclear Power Plant
Seismic Margin Assessment (SMA) is one of the methods for seismic safety assessment of nuclear power plants. The United States in the 1990s requires all running nuclear power plant...
Current Situation and Development Trend of Decommissioning of Nuclear Power Plants
Current Situation and Development Trend of Decommissioning of Nuclear Power Plants
Abstract
The complete life of a nuclear power plant consists of three stages: construction, operation and decommissioning. In the last stage of the operation life of...
Study on Nuclear Safety Management Based on Multiple Nuclear Power Plants Experience Feedback Management
Study on Nuclear Safety Management Based on Multiple Nuclear Power Plants Experience Feedback Management
Abstract
Nuclear power plant experience feedback management includes event reporting, screening, analysis, corrective action management and assessment. In the early ...
ACKNOWLEDGMENTS
ACKNOWLEDGMENTS
The UP Manila Health Policy Development Hub recognizes the invaluable contribution of the participants in theseries of roundtable discussions listed below:
RTD: Beyond Hospit...
Exploration of Ultra-High Performance Concrete (UHPC) Application in Nuclear Power Plant Structures
Exploration of Ultra-High Performance Concrete (UHPC) Application in Nuclear Power Plant Structures
Abstract
Ultra-High Performance Concrete (UHPC), as a rapidly developing high-performance cement-based material in recent years, has three major characteristics: hig...

