Development of the Kwanda Base Deepwater Logistics Shorebase

View through CrossRef
Abstract Coincident with the deepwater development of Angola Block 15, Esso Exploration Angola (Block 15), Ltd. (Esso) has contributed significantly to the development and support of Angolan infrastructure. One such project, in addition to others, was the development and construction of the Kwanda Shorebase, which was approved in 2001. This paper details the challenges of constructing the shorebase and highlights the best practices employed in an area ravaged by 27 years of civil war. The Kwanda Shorebase Project was challenged with providing he entire spectrum of technical, logistical, and engineering services required for support of deepwater offshore operations while establishing a world-class shorebase. Included in the design was Africa's only covered vessel quay equipped with an overhead gantry crane. This design facilitates vessel loading and unloading in all weather conditions while significantly reducing vessel turnaround time. In addition, dredging of the channel from the Congo River to Kwanda Base was completed to provide unimpeded access by deepwater marine vessels. Other upgrades implemented include stateof- art communications, staff accommodations, offices, and a warehouse. A complete heliport renovation is currently underway which, upon its completion in the second quarter of 2006, will provide paved parking for eight helicopters, taxiways, a 500 m rejected take-off landing strip, a control tower, a helicopter maintenance hangar, workshops, a passenger terminal, and living accommodations for twelve pilots and engineers. Esso staffing at Kwanda Base has grown considerably, with over 60% being Angolan nationals. Development of a strong safety partnership and culture has resulted in Esso Operations having achieved zero Lost Time Incidents (LTIs) in over 1,461 days worked. The Deepwater Shorebase Development Project continues to evolve as Block 15 development and operations proceed at an unprecedented pace. Other projects underway both onshore and offshore will further increase the need for additional infrastructure development in the region. Kwanda Base History Kwanda Base originally serviced shallow-water and some onshore production facilities of other operators in northern Angola. However, Esso recognized that the strategic location of the base, to the east of Block 15 and near the town of Soyo, Angola, made it well positioned to service the needs of Esso's deepwater offshore field developments. Figure 1. Angola Block 15 Region During the later years of Angola's revolution, rebel forces overran Kwanda Base, forcing the evacuation of all oil company employees, and the base was shut down from 1993 until 1995. Its infrastructure was stripped of all facilities and equipment, and all buildings were completely gutted. The base was demined before oil company personnel returned to the base in 1996 and began rebuilding the base infrastructure. Though offshore operations were virtually untouched during the conflict, onshore support operations had been relocated to Pointe Noire, Congo. Prior to Esso involvement, redevelopment of the base was limited due to declining production in the area and continuing conflict in the province.
Title: Development of the Kwanda Base Deepwater Logistics Shorebase
Description:
Abstract Coincident with the deepwater development of Angola Block 15, Esso Exploration Angola (Block 15), Ltd.
(Esso) has contributed significantly to the development and support of Angolan infrastructure.
One such project, in addition to others, was the development and construction of the Kwanda Shorebase, which was approved in 2001.
This paper details the challenges of constructing the shorebase and highlights the best practices employed in an area ravaged by 27 years of civil war.
The Kwanda Shorebase Project was challenged with providing he entire spectrum of technical, logistical, and engineering services required for support of deepwater offshore operations while establishing a world-class shorebase.
Included in the design was Africa's only covered vessel quay equipped with an overhead gantry crane.
This design facilitates vessel loading and unloading in all weather conditions while significantly reducing vessel turnaround time.
In addition, dredging of the channel from the Congo River to Kwanda Base was completed to provide unimpeded access by deepwater marine vessels.
Other upgrades implemented include stateof- art communications, staff accommodations, offices, and a warehouse.
A complete heliport renovation is currently underway which, upon its completion in the second quarter of 2006, will provide paved parking for eight helicopters, taxiways, a 500 m rejected take-off landing strip, a control tower, a helicopter maintenance hangar, workshops, a passenger terminal, and living accommodations for twelve pilots and engineers.
Esso staffing at Kwanda Base has grown considerably, with over 60% being Angolan nationals.
Development of a strong safety partnership and culture has resulted in Esso Operations having achieved zero Lost Time Incidents (LTIs) in over 1,461 days worked.
The Deepwater Shorebase Development Project continues to evolve as Block 15 development and operations proceed at an unprecedented pace.
Other projects underway both onshore and offshore will further increase the need for additional infrastructure development in the region.
Kwanda Base History Kwanda Base originally serviced shallow-water and some onshore production facilities of other operators in northern Angola.
However, Esso recognized that the strategic location of the base, to the east of Block 15 and near the town of Soyo, Angola, made it well positioned to service the needs of Esso's deepwater offshore field developments.
Figure 1.
Angola Block 15 Region During the later years of Angola's revolution, rebel forces overran Kwanda Base, forcing the evacuation of all oil company employees, and the base was shut down from 1993 until 1995.
Its infrastructure was stripped of all facilities and equipment, and all buildings were completely gutted.
The base was demined before oil company personnel returned to the base in 1996 and began rebuilding the base infrastructure.
Though offshore operations were virtually untouched during the conflict, onshore support operations had been relocated to Pointe Noire, Congo.
Prior to Esso involvement, redevelopment of the base was limited due to declining production in the area and continuing conflict in the province.

Related Results

New Tendon and Riser Technologies Improve TLP Competitiveness in Ultra- Deepwater
New Tendon and Riser Technologies Improve TLP Competitiveness in Ultra- Deepwater
Abstract The extensive industry experience with design, fabrication, installation, and operation of TLPs in water depths up to 4,000 ft has demonstrated the flexi...
The Future of Regulations for the Deepwater GOM
The Future of Regulations for the Deepwater GOM
Abstract Deepwater oil and gas activities in the U.S. Gulf of Mexico Outer ContinentalShelf (OCS) are regulated by the Minerals Management Service (MMS). The leve...
The influence of logistics management on food security in Ghana
The influence of logistics management on food security in Ghana
Research problem warehouse Food insecurity has been reported to be increasing in Ghana despite recent government logistics infrastructure (warehouses) efforts. It is important to u...
Equilibrium Study of Logistics Demand and Logistics Resource Allocation in Guangdong Province
Equilibrium Study of Logistics Demand and Logistics Resource Allocation in Guangdong Province
Abstract Logistics serve as a crucial link between production and consumption. The balanced allocation of logistics demand and resources can promote the balanced developmen...
Logistics capability, logistics outsourcing and firm performance in an e‐commerce market
Logistics capability, logistics outsourcing and firm performance in an e‐commerce market
PurposeEffective and efficient supply chain management is critical to the success of firms engaging in e‐commerce. The purpose of this paper is to examine the impact of logistics c...
Shared Use of Digital Logistics Services by Consumers and Manufacturers of Tourist Services
Shared Use of Digital Logistics Services by Consumers and Manufacturers of Tourist Services
The presented study examines the major directions for the application of digital technologies in tourism with an emphasis on the efficiency of digital technologies and digital logi...
Comparison of Logistics Level Between China and ASEAN
Comparison of Logistics Level Between China and ASEAN
As a dialogue partner of the Association of Southeast Asian Nations (ASEAN), China has engaged in economic and trade cooperation with ASEAN for over a decade. The process of trade ...
Installation of Deepwater Pipelines With Sled Assemblies Using The New J-Lay System of the DCV Balder
Installation of Deepwater Pipelines With Sled Assemblies Using The New J-Lay System of the DCV Balder
Abstract This paper describes the most important features required for installing deepwater pipelines, pipelines with in-line sled assemblies, PLETs, and SCRs. Th...