Estimasi Biaya Alat Muat Dan Angkut Penambangan Quarry Batu Andesit PT Putra Elan Balindo Pada Kota Palu Sulawesi Tengah

View through CrossRef
PT. Putra Elan Balindo is a company engaged in the mining sector specially the andesite minerals domiciled in Palu City. PT. Putra Elan Balindo located in Watusampu Village, Ulujadi District, Palu City, Central Sulawesi, which has an IUP (Mining Business Permit) with an area of 17.89 Ha. To achieve production targets set by the company using a combination of tools mechanics in the form of Excavator Komatsu PC 400 and Dump Truck Hino FM 260 JD, where there is currently only 1 Excavator while the Dump Truck is 2 are needed with a production target of 20,000 m3 per month and have 1 shift working hours. Based on the results of research carried out for one month, it shows that the productivity of the Komatsu PC 400 Excavator is 174.29 m3 / hour and the Hino FM 260 JD Dump Truck is 197.69 m3 / hour for 2 transport equipment. The cost of owning a Hino FM 260 JD Dump Truck is Rp. 476,190/hour and the cost of owning a Komatsu PC 400 Excavator is Rp. 267,857/hour while operational costs for the Hino FM 260 JD Dump Truck are Rp. 1,862,072/ hour and operational costs for a Komatsu PC 400 Excavator Rp. 2,135,421/hour.
Title: Estimasi Biaya Alat Muat Dan Angkut Penambangan Quarry Batu Andesit PT Putra Elan Balindo Pada Kota Palu Sulawesi Tengah
Description:
PT.
Putra Elan Balindo is a company engaged in the mining sector specially the andesite minerals domiciled in Palu City.
PT.
Putra Elan Balindo located in Watusampu Village, Ulujadi District, Palu City, Central Sulawesi, which has an IUP (Mining Business Permit) with an area of 17.
89 Ha.
To achieve production targets set by the company using a combination of tools mechanics in the form of Excavator Komatsu PC 400 and Dump Truck Hino FM 260 JD, where there is currently only 1 Excavator while the Dump Truck is 2 are needed with a production target of 20,000 m3 per month and have 1 shift working hours.
Based on the results of research carried out for one month, it shows that the productivity of the Komatsu PC 400 Excavator is 174.
29 m3 / hour and the Hino FM 260 JD Dump Truck is 197.
69 m3 / hour for 2 transport equipment.
The cost of owning a Hino FM 260 JD Dump Truck is Rp.
476,190/hour and the cost of owning a Komatsu PC 400 Excavator is Rp.
267,857/hour while operational costs for the Hino FM 260 JD Dump Truck are Rp.
1,862,072/ hour and operational costs for a Komatsu PC 400 Excavator Rp.
2,135,421/hour.

Related Results

Pengaruh Geometri Jalan Terhadap Produktivitas Alat Angkut
Pengaruh Geometri Jalan Terhadap Produktivitas Alat Angkut
Abstract. Based on the actual conditions in the field, there are several road geometries that are not in accordance with the standards resulting in high traffic density. This cause...
ANALISIS PERLAWANAN PEREMPUAN TERHADAP KEBIJAKAN PEMERINTAH DALAM PENAMBANGAN BATU ANDESIT DI DESA WADAS
ANALISIS PERLAWANAN PEREMPUAN TERHADAP KEBIJAKAN PEMERINTAH DALAM PENAMBANGAN BATU ANDESIT DI DESA WADAS
Kebijakan pemerintah membebaskan lahan warga desa untuk penambangan batu andesit di Desa Wadas telah memunculkan perlawanan kaum perempuan menolak  kebijakan tersebut. Peristiwa da...
Analisis Peluang Pemasaran Produk Kerajinan Daun Silar pada Industri Kecil Menengah Lanu Nagaya Liku Kota Palu
Analisis Peluang Pemasaran Produk Kerajinan Daun Silar pada Industri Kecil Menengah Lanu Nagaya Liku Kota Palu
Penelitian ini bertujuan : Untuk mengetahui dan menganalisis peluang pemasaran produk kerajinan daun silar pada Industri Kecil Menengah Lanu Nagaya Liku Kota Palu. Hasil penelitian...
Rencana Teknis dan Biaya Reklamasi Tambang Timah Blok Sangau B.3 PT XYZ
Rencana Teknis dan Biaya Reklamasi Tambang Timah Blok Sangau B.3 PT XYZ
Abstract. In addition to providing benefits, marine mining activities can have a negative impact on the marine environment, causing various changes to the marine environment. One o...
PENERAPAN PERHITUNGAN HARGA POKOK PRODUKSI CHEMICAL PADA PT “X” DI SURABAYA
PENERAPAN PERHITUNGAN HARGA POKOK PRODUKSI CHEMICAL PADA PT “X” DI SURABAYA
PT X adalah perusahaan manufaktur yang memproduksi bahan kimia (Chemical) yang digunakan sebagai bahan pelumas untuk mesin dan peralatan pabrik. Selama ini, PT X dalam menghitung h...
Pengaruh Penambahan Batu Cadas Terhadap Agregat Kasar Untuk Pengujian Kuat Tekan pada Beton
Pengaruh Penambahan Batu Cadas Terhadap Agregat Kasar Untuk Pengujian Kuat Tekan pada Beton
: Batu cadas (batu trass) adalah batuan yang telah mengalami perubahan komposisi kimia yang di sebabkan oleh pelapukan dan pengaruh kondisi air bawah tanah. Bahan galian ini berwar...

Back to Top