BOP Testing and It's Availability on Demand-A Case Study

View through CrossRef
Abstract Blowout Preventer (BOP) is an integral component of defense in depth approach adopted in deepwater drilling operations. Regulatory bodies require frequent testing of these barriers, to make sure that they will be available to perform their intended functions when demand arrives. As BOP works only in demand mode, therefore the calculation of average probability of failure on demand (PFDavg) is one of the technique that can provide the critical information about the availability of these barriers. In this study PFDavg formulation is used to carry out s systematic performance evaluation a BOP's barrier elements. A sensitivity analysis is also performed to account for some of the real demand conditions that cannot be tested during routine tests, an example is the testing of shearing capability of blind shear rams. Multilevel test formulations are used that accommodates both of proof test and partial stroke testing concepts. The interdependency of these barrier elements is modeled by using beta factor model, which account for common cause failures. The results are presented for three flow paths of open wellbore flow, flow through drillpipe-casing annulus and flow through drillpipe. Corresponding BOP's barrier elements are used to estimate the availability of these barriers when they are demanded. The analysis results indicate high common cause failures of BOP's main control system with an average value of 0.25. Which is a significantly high dependency of both of the BOP's control pods on some of the common elements that can fail them simultaneously. The results also show that average availability of drillpipe-casing annular and open-hole barrier channels is dominated by the BOP's main control system, mainly due to its high failure rates. The analysis also revealed that a beta factor contribution significantly impacts the unavailability of drillpipe-casing annular channel barrier elements. Results for other demand scenarios and combination of working of these barrier elements are also presented. The presented results highlight some of the critical safety measures of BOP's barrier element performance and also highlight some of the deficiency areas that need to be taken care of to improve the system's performance. It is therefore hoped that the presented results will be helpful to gain insight into different modes of operation and in improving the system's performance.
Title: BOP Testing and It's Availability on Demand-A Case Study
Description:
Abstract Blowout Preventer (BOP) is an integral component of defense in depth approach adopted in deepwater drilling operations.
Regulatory bodies require frequent testing of these barriers, to make sure that they will be available to perform their intended functions when demand arrives.
As BOP works only in demand mode, therefore the calculation of average probability of failure on demand (PFDavg) is one of the technique that can provide the critical information about the availability of these barriers.
In this study PFDavg formulation is used to carry out s systematic performance evaluation a BOP's barrier elements.
A sensitivity analysis is also performed to account for some of the real demand conditions that cannot be tested during routine tests, an example is the testing of shearing capability of blind shear rams.
Multilevel test formulations are used that accommodates both of proof test and partial stroke testing concepts.
The interdependency of these barrier elements is modeled by using beta factor model, which account for common cause failures.
The results are presented for three flow paths of open wellbore flow, flow through drillpipe-casing annulus and flow through drillpipe.
Corresponding BOP's barrier elements are used to estimate the availability of these barriers when they are demanded.
The analysis results indicate high common cause failures of BOP's main control system with an average value of 0.
25.
Which is a significantly high dependency of both of the BOP's control pods on some of the common elements that can fail them simultaneously.
The results also show that average availability of drillpipe-casing annular and open-hole barrier channels is dominated by the BOP's main control system, mainly due to its high failure rates.
The analysis also revealed that a beta factor contribution significantly impacts the unavailability of drillpipe-casing annular channel barrier elements.
Results for other demand scenarios and combination of working of these barrier elements are also presented.
The presented results highlight some of the critical safety measures of BOP's barrier element performance and also highlight some of the deficiency areas that need to be taken care of to improve the system's performance.
It is therefore hoped that the presented results will be helpful to gain insight into different modes of operation and in improving the system's performance.

Related Results

Hydatid Disease of The Brain Parenchyma: A Systematic Review
Hydatid Disease of The Brain Parenchyma: A Systematic Review
Abstarct Introduction Isolated brain hydatid disease (BHD) is an extremely rare form of echinococcosis. A prompt and timely diagnosis is a crucial step in disease management. This ...
Breast Carcinoma within Fibroadenoma: A Systematic Review
Breast Carcinoma within Fibroadenoma: A Systematic Review
Abstract Introduction Fibroadenoma is the most common benign breast lesion; however, it carries a potential risk of malignant transformation. This systematic review provides an ove...
Modular Marine BOP Stack
Modular Marine BOP Stack
ABSTRACT The Modular Blowout Preventer (BOP) stack integrates, in a compact way, the main components of an underwater BOP assembly. In this approach the annular BOP,...
Chest Wall Hydatid Cysts: A Systematic Review
Chest Wall Hydatid Cysts: A Systematic Review
Abstract Introduction Given the rarity of chest wall hydatid disease, information on this condition is primarily drawn from case reports. Hence, this study systematically reviews t...
Analysis of the Impact of Selected Macro-Economic Variables on Balance of Payments in Nigeria
Analysis of the Impact of Selected Macro-Economic Variables on Balance of Payments in Nigeria
Given that Nigerian economy has recorded unfavourable Balance of Payment (BOP) positive in recent years, it becomes imperative to study the impact of selected macroeconomic variab...
The 15,OOO-psi BOP System for Floating Drilling
The 15,OOO-psi BOP System for Floating Drilling
ABSTRACT Fifteen thousand PSI subsea drilling equipment is becoming a reality on a significant number of offshore floating drilling vessels. The...
Pengaruh Akuntabilitas dan Transparansi terhadap Efektivitas Pengelolaan Dana Bantuan Operasional Penyelenggaraan di Lembaga PAUD
Pengaruh Akuntabilitas dan Transparansi terhadap Efektivitas Pengelolaan Dana Bantuan Operasional Penyelenggaraan di Lembaga PAUD
Effective management of Operational Assistance (BOP) funds is a crucial factor in improving the quality of Early Childhood Education (PAUD) services. The BOP Fund has a strategic r...
Advancing BOP Reilability through IoT Technology
Advancing BOP Reilability through IoT Technology
Abstract A blowout preventer (BOP) is one of the major pressure control safety devices used in the drilling of hydrocarbon wells. Hence, improving BOP reliability an...