Horizontal Well Placement for Heavy Oil Production in Colombia
View through CrossRef
Abstract
The success of a horizontal drilling campaign highly depends on the implementation of appropriate well placement procedures to manage the constraints, risks, and uncertainties that may have a negative impact on the overall economy of the project. The magnitude of the uncertainties associated with the horizontal well trajectory and the geology is usually higher than the magnitude of that particular target within the reservoir that would maximize the production. The risk and uncertainty factors can be handled with the use of particular well placement techniques during the planning and execution phases.
In the planning phase, these techniques include proper geological modeling methods and flexible well planning to allow room for changes if unexpected events arise while drilling. During the well execution, procedures should include the use of appropriate technologies to understand in real time the rock properties, the reservoir geometry, and horizontal well position, and, based on this information, to steer the well within the desired geological target.
Girasol field, located in the Middle Magdalena Valley basin in Colombia, is composed of a sequence of sandstone channels that contain heavy oil with gravity ranging from 11 to 13° API. The main targets are five stacked sandstone reservoirs, from 10 to 35 ft thick, located 1,100 to 1,500 ft true vertical depth below surface. The field development included cyclic steam injection applied in horizontal wells to improve the heavy oil mobility. To maximize oil production and improve the cumulative steam/oil ratio, the objective was to place horizontal wells of up to 2,500 ft lateral extension within 3 to10 ft distance from the bottom shale of each reservoir.
The horizontal well placement under this type of scenario required the use of precise horizontal well placement techniques and drilling practices to avoid exits from the predefined geological targets. These techniques relied on the use of deep directional electromagnetic measurements that enabled real-time bed boundary mapping.
This paper presents the main challenges and uncertainties faced for well placement in the Girasol field horizontal drilling campaign, the technical solutions implemented, and the lessons learned in more than 80 horizontal wells drilled.
Title: Horizontal Well Placement for Heavy Oil Production in Colombia
Description:
Abstract
The success of a horizontal drilling campaign highly depends on the implementation of appropriate well placement procedures to manage the constraints, risks, and uncertainties that may have a negative impact on the overall economy of the project.
The magnitude of the uncertainties associated with the horizontal well trajectory and the geology is usually higher than the magnitude of that particular target within the reservoir that would maximize the production.
The risk and uncertainty factors can be handled with the use of particular well placement techniques during the planning and execution phases.
In the planning phase, these techniques include proper geological modeling methods and flexible well planning to allow room for changes if unexpected events arise while drilling.
During the well execution, procedures should include the use of appropriate technologies to understand in real time the rock properties, the reservoir geometry, and horizontal well position, and, based on this information, to steer the well within the desired geological target.
Girasol field, located in the Middle Magdalena Valley basin in Colombia, is composed of a sequence of sandstone channels that contain heavy oil with gravity ranging from 11 to 13° API.
The main targets are five stacked sandstone reservoirs, from 10 to 35 ft thick, located 1,100 to 1,500 ft true vertical depth below surface.
The field development included cyclic steam injection applied in horizontal wells to improve the heavy oil mobility.
To maximize oil production and improve the cumulative steam/oil ratio, the objective was to place horizontal wells of up to 2,500 ft lateral extension within 3 to10 ft distance from the bottom shale of each reservoir.
The horizontal well placement under this type of scenario required the use of precise horizontal well placement techniques and drilling practices to avoid exits from the predefined geological targets.
These techniques relied on the use of deep directional electromagnetic measurements that enabled real-time bed boundary mapping.
This paper presents the main challenges and uncertainties faced for well placement in the Girasol field horizontal drilling campaign, the technical solutions implemented, and the lessons learned in more than 80 horizontal wells drilled.
Related Results
Identidad e intereses nacionales de Colombia
Identidad e intereses nacionales de Colombia
La construcción de la identidad y la de los intereses nacionales de todo Estado constituyen procesos interdependientes y complementarios que se llevan a cabo de manera intersubjeti...
Advancement and Application of Thermal Recovery Technology in Heavy Oil Reservoir in Shengli Petroleum Province
Advancement and Application of Thermal Recovery Technology in Heavy Oil Reservoir in Shengli Petroleum Province
Abstract
The main features of heavy oil reservoir in Shengli petroleum province are as bellow: deep reservoir (>1300m),most with active edge and bottom wat...
Overview: Heavy Oil (April 2006)
Overview: Heavy Oil (April 2006)
As I write this overview, the price of benchmark Brent crude ranges between U.S. $62 and $65/bbl, and heavy crude oils, such as Midway Sunset (13°API), hover around U.S. $53/bbl. T...
An Effective Way to Develop a Thin-layered Heavy Oil Reservoir within Economic Margin
An Effective Way to Develop a Thin-layered Heavy Oil Reservoir within Economic Margin
Abstract
More than 50% of the heavy oil resources for PetroChina Liaohe exist in thin (approximately 3- to 8-m thick) reservoirs. For this type of reservoir, steamfl...
Status of Heavy-Oil Development in China
Status of Heavy-Oil Development in China
Abstract
China has significant heavy oil deposit of more than 1.9 billion tons of oil reserve in place (OOIP) with four major heavy oil producing areas, which are Li...
Evaluation Techniques of Reserves for Heavy Oil and Oil Sands
Evaluation Techniques of Reserves for Heavy Oil and Oil Sands
Abstract
With the annual growth of development scale and production, the research of heavy oil and oil sands become more and more important. Due to the characteri...
Successful Refracturing Enhances Oil Production in Horizontal Wells: A Case Study from Daqing Oilfield, China
Successful Refracturing Enhances Oil Production in Horizontal Wells: A Case Study from Daqing Oilfield, China
Abstract
In recent years, hundreds of horizontal wells have been drilled with cemented casing completion in Daqing oilfield, China. Some of these wells in low per...
A New Completion Technology to Improve Horizontal Well Performances
A New Completion Technology to Improve Horizontal Well Performances
Abstract
Some recent research results have shown that especially for long horizontal wells with relatively high rate, when the friction loss plays a significant r...