Barracuda And Caratinga FPSO Design
View through CrossRef
Abstract
The use of floating production, storage and offloading (FPSO) systems converted from a very large crude carrier (VLCC) has been deemed a practical solution compared to the costly and time-consuming construction of custom built floating systems. At the time of the Barracuda and Caratinga Project conception, in the late 90ths, with the oil barrel price between US$ 12 and US$ 15, the conversion came in as an attractive alternative in order to increase the economic feasibility of the project. As most of the oil tanker fleet used for conversion was built in 80's decade, the design requirements and component specifications to ensure FPSO's integrity and operation performance for next 20 years without docking have become of paramount importance. In order to overcome this challenge, PETROBRAS has adopted the lessons learned from previous FPSO developments in the Campos Basin, while using both proven and new technologies in the Barracuda (P-43) and Caratinga (P-48) FPSOs. Besides the conversion approach, another important strategy for the project implementation was the twin design of the FPSOs. Instead of opting for a distinct design, customizing the production units for the reality of each field, the requirements for the production units were matched and a single design was adopted, allowing a reduction in the construction costs and a larger increase in the project economic feasibility. After a short description of the fields development, this paper describes the development of P-43 and P-48 FPSO for the Barracuda and Caratinda fields respectively, focusing on the unique features of the FPSO's design and the key project decisions that affected the conversion design, construction and installation of such units.
Introduction
In order to develop offshore deep-water oil fields, PETROBRAS started to convert vessels to operate as floating production, storage and offloading systems (FPSOs). In today's economic environment, these systems are widespread in the offshore industry and have proven to be an effective solution for the development of the fields. Barracuda and Caratinga Project is one of the cases where this conversion occurred. Barracuda and Caratinga Project was developed in two stages: the Pilot System stage and the Definitive System stage. The Pilot System, which purpose was to anticipate the production and collect information of the fields, started its operations in September 1997, exploring the fields referenced through the FPSO P-34. Ten production pilot wells from both Barracuda and Caratinga fields were connected to FPSO P-34, producing around 45,000 barrels per day until its demobilization, which occurred in September 2003. The Definitive System consists on the construction of two FPSOs: P-43 and P-48 connected to 54 wells through a subsea system, for the operation in Barracuda and Caratinga fields, respectively. In order to increase the economic feasibility of the Project, at the time of its conception, it was decided to convert two VLCCs units (Stena Concordia and Stena Continent) in the FPSOs P-43 and P-48, respectively.
Barracuda and Caratinga Fields Development
Barracuda and Caratinga fields, located in Campos Basin in Brazilian Coast, are approximately 12,5 km separated from each other.
Title: Barracuda And Caratinga FPSO Design
Description:
Abstract
The use of floating production, storage and offloading (FPSO) systems converted from a very large crude carrier (VLCC) has been deemed a practical solution compared to the costly and time-consuming construction of custom built floating systems.
At the time of the Barracuda and Caratinga Project conception, in the late 90ths, with the oil barrel price between US$ 12 and US$ 15, the conversion came in as an attractive alternative in order to increase the economic feasibility of the project.
As most of the oil tanker fleet used for conversion was built in 80's decade, the design requirements and component specifications to ensure FPSO's integrity and operation performance for next 20 years without docking have become of paramount importance.
In order to overcome this challenge, PETROBRAS has adopted the lessons learned from previous FPSO developments in the Campos Basin, while using both proven and new technologies in the Barracuda (P-43) and Caratinga (P-48) FPSOs.
Besides the conversion approach, another important strategy for the project implementation was the twin design of the FPSOs.
Instead of opting for a distinct design, customizing the production units for the reality of each field, the requirements for the production units were matched and a single design was adopted, allowing a reduction in the construction costs and a larger increase in the project economic feasibility.
After a short description of the fields development, this paper describes the development of P-43 and P-48 FPSO for the Barracuda and Caratinda fields respectively, focusing on the unique features of the FPSO's design and the key project decisions that affected the conversion design, construction and installation of such units.
Introduction
In order to develop offshore deep-water oil fields, PETROBRAS started to convert vessels to operate as floating production, storage and offloading systems (FPSOs).
In today's economic environment, these systems are widespread in the offshore industry and have proven to be an effective solution for the development of the fields.
Barracuda and Caratinga Project is one of the cases where this conversion occurred.
Barracuda and Caratinga Project was developed in two stages: the Pilot System stage and the Definitive System stage.
The Pilot System, which purpose was to anticipate the production and collect information of the fields, started its operations in September 1997, exploring the fields referenced through the FPSO P-34.
Ten production pilot wells from both Barracuda and Caratinga fields were connected to FPSO P-34, producing around 45,000 barrels per day until its demobilization, which occurred in September 2003.
The Definitive System consists on the construction of two FPSOs: P-43 and P-48 connected to 54 wells through a subsea system, for the operation in Barracuda and Caratinga fields, respectively.
In order to increase the economic feasibility of the Project, at the time of its conception, it was decided to convert two VLCCs units (Stena Concordia and Stena Continent) in the FPSOs P-43 and P-48, respectively.
Barracuda and Caratinga Fields Development
Barracuda and Caratinga fields, located in Campos Basin in Brazilian Coast, are approximately 12,5 km separated from each other.
Related Results
FPSO's Today: What is the Optimum Concept?
FPSO's Today: What is the Optimum Concept?
ABSTRACT
FPSO technology over the past years has rapidly evolved from tanker based units with classical mooring systems to purpose-shaped new built vessels equipp...
The Sanha LPG FPSO
The Sanha LPG FPSO
Abstract
The FPSO industry will soon have the first LPG FPSO in operation. The SANHA LPG FPSO is the first gas related FPSO. With the installation of the LPG FPSO...
Geotechnical Design of the Barracuda and Caratinga Suction Anchors
Geotechnical Design of the Barracuda and Caratinga Suction Anchors
Abstract
The Paper presents the methodologies adopted for the design of mooring and riser anchors of the P43 and P48 FPSOs due to be installed in 2003 in deep wat...
FPSO Integrity; Structural Monitoring of Glas Dowr
FPSO Integrity; Structural Monitoring of Glas Dowr
Abstract
The objective of the Joint Industry project 'FPSO Integrity' is to provide insight in the fatigue loading of FPSO's and the accuracy and validity of comp...
ROSA: New Challenges in West Africa Deepwater Developments
ROSA: New Challenges in West Africa Deepwater Developments
Abstract
Discovered in 1998, the Rosa field is located offshore Angola in the prolific Block 17, at a distance of 16 kilometers from the spread-moored Girassol FP...
Design and Conversion of FPSO Mystras
Design and Conversion of FPSO Mystras
Abstract
A recently completed FPSO conversion project shows some novel features in FPSO design. An existing trading tanker was selected for conversion into a 48,0...
Gryphon Alpha FPSO - Experience Gained During Moorings Replacement and Hook-Up
Gryphon Alpha FPSO - Experience Gained During Moorings Replacement and Hook-Up
Abstract
In a North Sea storm during February 2011 the Gryphon Alpha FPSO broke four of her 10 mooring lines and moved partially off station, causing damage to su...