Continuous Slag Discharge Construction Technology for Shield Tunneling in Narrow Space Environment
View through CrossRef
The shield tunneling method is the main construction method in subway tunnel construction, which has the characteristics of safety, efficiency, mechanization, and high degree of automation. However, the shield tunneling equipment is huge, the supporting facilities are numerous, and the site requirements are high. In response to the problems of slow slag removal speed and low construction efficiency in shield tunneling under the construction conditions of small wellhead shield tunneling sections in urban subways, taking the shield tunneling section of Guangzhou Metro Line 13 Phase II as the background,This article introduces the main components, working principles, installation and transportation processes, fault handling, and benefit analysis of the continuous belt conveyor slag removal system,This article elaborates on the method of using a continuous belt conveyor in the tunnel combined with a vertical lifting system at the wellhead to achieve continuous slag removal during underground shield tunneling construction in a narrow wellhead construction site. This not only improves excavation efficiency but also reduces construction costs, solves construction problems, and provides reference for similar projects in the future.
Title: Continuous Slag Discharge Construction Technology for Shield Tunneling in Narrow Space Environment
Description:
The shield tunneling method is the main construction method in subway tunnel construction, which has the characteristics of safety, efficiency, mechanization, and high degree of automation.
However, the shield tunneling equipment is huge, the supporting facilities are numerous, and the site requirements are high.
In response to the problems of slow slag removal speed and low construction efficiency in shield tunneling under the construction conditions of small wellhead shield tunneling sections in urban subways, taking the shield tunneling section of Guangzhou Metro Line 13 Phase II as the background,This article introduces the main components, working principles, installation and transportation processes, fault handling, and benefit analysis of the continuous belt conveyor slag removal system,This article elaborates on the method of using a continuous belt conveyor in the tunnel combined with a vertical lifting system at the wellhead to achieve continuous slag removal during underground shield tunneling construction in a narrow wellhead construction site.
This not only improves excavation efficiency but also reduces construction costs, solves construction problems, and provides reference for similar projects in the future.
Related Results
The influence of the volatiles on the slag composition for the heating process
The influence of the volatiles on the slag composition for the heating process
The physicochemical properties of slag are of great importance in pyrometallurgy. If there is a volatile component in the slag, evaporation will inevitably occur. As a result, the ...
Study on cementitious properties of steel slag
Study on cementitious properties of steel slag
The converter steel slag chemical and mineral components in China?s main
steel plants have been analysed in the present paper. The electronic
microscope, energy spectrum anal...
Research progress of hydrogen tunneling in two-dimensional materials
Research progress of hydrogen tunneling in two-dimensional materials
One-atom-thick material such as graphene, graphene derivatives and graphene-like materials, usually has a dense network lattice structure and therefore dense distribution of electr...
Rotating characteristics of glow discharge filament on liquid electrode surface
Rotating characteristics of glow discharge filament on liquid electrode surface
Atmospheric pressure glow discharge above liquid electrode has extensive application potentials in biomedicine, chemical degradation,environmental protection,etc.In this paper,such...
Beneficial Reuse of Municipal Solid Waste Incineration Bottom Slag in Civil Engineering
Beneficial Reuse of Municipal Solid Waste Incineration Bottom Slag in Civil Engineering
Rapid economic development has caused many disturbing problems in many countries. Waste disposal is a prominent one of those problems. Waste incineration has gradually become the m...
Influence of Mechanochemical Effects on the Strength Activity of Micro-Powder Derived from Multi-Source Solid Waste
Influence of Mechanochemical Effects on the Strength Activity of Micro-Powder Derived from Multi-Source Solid Waste
Abstract
Driven by China emission peak and carbon neutrality goals, the efficient utilization of industrial solid wastes to develop low-carbon cementitious materials has be...
Seditious Spaces
Seditious Spaces
The title ‘Seditious Spaces’ is derived from one aspect of Britain’s colonial legacy in Malaysia (formerly Malaya): the Sedition Act 1948. While colonial rule may seem like it was ...
Numerical Simulation Study of Shield Tunnel Construction Under Canal in Water-Rich Sand Layer
Numerical Simulation Study of Shield Tunnel Construction Under Canal in Water-Rich Sand Layer
Abstract
Focusing on the impact of tunnel shield construction on the surface and surrounding environment in water-rich sand layers beneath a canal in the paper, based on in...