Cooperation on Multiphase Flow Pumping
View through CrossRef
Abstract
PETROBRAS (Brazil) and BORNEMANN PUMPEN (Germany) are since 1993 working on this route development under a Technological Cooperation Agreement. This Cooperation has allowed, among other aspects, the development, through testing, of a multiphase flow pump prototype. The pump is a volumetric type (twin-screws) and able to operate under several multiphase flow conditions, whereas the Gas Void Fraction (GVF) reaches values as high as 95 % in volume, at the pump suction conditions. The referred tests have been conducted at the recent conceived and built PETROBRAS Test Site for Multiphase Equipment, located at the PETROBRAS' E&P-SEAL area, in Atalaia, city of Aracaju. This onshore test site allows performing highly representative tests when compared with actual production installations. This paper presents the major characteristics of this technological route and focus on the tested multiphase pump description, its programmed commissioning, performance and endurance campaigns, including the results acquired up to date and the mentioned Cooperation basis and produced results.
Introduction
Among the 29 Sedimentary Basins encountered in Brazil, besides the exploration efforts on all of them, PETROBRAS has fortunately reached production in 9 ones. Produces around 7,200 wells and has reached a total production close to 143 × 103 m3/d, - here approximately 75 % comes from offshore areas, whereas 30 % of the total comes from water depths WD) beyond 400 m. The offshore wells, stretching throughout almost the entire Brazilian coast, are produced with 91 Stationary Production Units (SPU), i.e., platforms (several types), floating vessels etc. In terms of future potential discoveries, the Company exploratory play analysis indicates values up to 65 % for the discoveries in offshore deep areas.
At the moment, PETROBRAS produces in water depths crossing the 1,000 m WD (world record holder), while recently discovered fields are stretching out beyond the 2,000 m of WD boundary. Thus, aiming at the continuos success in such area, PETROBRAS established (1992) a corporate R&D program, PROCAP. -2000' (Technological Innovation program on Deep Water Exploitation Systems). This Program is pursuing the development of several innovative technologies that shall lead the Company to the full technological capability to exploit oil fields at WD up to the 2,000 meters boundary and making use of technologies that shall introduce strong changes on the current deep-water production way. Table 1 shows the PROCAP-2000 Project Portfolio which translates the composing strategic systemic projects being developed in the program.
Among the innovative technological routes composing such program, one shall find the Multiphase Flow Pumping, especially dedicated to the subsea scenario, but aware that onshore and offshore topside applications shall happen even sooner as a collateral benefit of such underway effort.
Late 1994, PETROBRAS conclusions were reached for a internal study that pursued the prediction of possible impacts resulting from the application of this technology, among others, on the deep water giant oil fields, as well as, a prediction of the main technological developments found as required for the conceptions to become available to the Company usage. Caetano et a12 reported such study and its main conclusions.
Title: Cooperation on Multiphase Flow Pumping
Description:
Abstract
PETROBRAS (Brazil) and BORNEMANN PUMPEN (Germany) are since 1993 working on this route development under a Technological Cooperation Agreement.
This Cooperation has allowed, among other aspects, the development, through testing, of a multiphase flow pump prototype.
The pump is a volumetric type (twin-screws) and able to operate under several multiphase flow conditions, whereas the Gas Void Fraction (GVF) reaches values as high as 95 % in volume, at the pump suction conditions.
The referred tests have been conducted at the recent conceived and built PETROBRAS Test Site for Multiphase Equipment, located at the PETROBRAS' E&P-SEAL area, in Atalaia, city of Aracaju.
This onshore test site allows performing highly representative tests when compared with actual production installations.
This paper presents the major characteristics of this technological route and focus on the tested multiphase pump description, its programmed commissioning, performance and endurance campaigns, including the results acquired up to date and the mentioned Cooperation basis and produced results.
Introduction
Among the 29 Sedimentary Basins encountered in Brazil, besides the exploration efforts on all of them, PETROBRAS has fortunately reached production in 9 ones.
Produces around 7,200 wells and has reached a total production close to 143 × 103 m3/d, - here approximately 75 % comes from offshore areas, whereas 30 % of the total comes from water depths WD) beyond 400 m.
The offshore wells, stretching throughout almost the entire Brazilian coast, are produced with 91 Stationary Production Units (SPU), i.
e.
, platforms (several types), floating vessels etc.
In terms of future potential discoveries, the Company exploratory play analysis indicates values up to 65 % for the discoveries in offshore deep areas.
At the moment, PETROBRAS produces in water depths crossing the 1,000 m WD (world record holder), while recently discovered fields are stretching out beyond the 2,000 m of WD boundary.
Thus, aiming at the continuos success in such area, PETROBRAS established (1992) a corporate R&D program, PROCAP.
-2000' (Technological Innovation program on Deep Water Exploitation Systems).
This Program is pursuing the development of several innovative technologies that shall lead the Company to the full technological capability to exploit oil fields at WD up to the 2,000 meters boundary and making use of technologies that shall introduce strong changes on the current deep-water production way.
Table 1 shows the PROCAP-2000 Project Portfolio which translates the composing strategic systemic projects being developed in the program.
Among the innovative technological routes composing such program, one shall find the Multiphase Flow Pumping, especially dedicated to the subsea scenario, but aware that onshore and offshore topside applications shall happen even sooner as a collateral benefit of such underway effort.
Late 1994, PETROBRAS conclusions were reached for a internal study that pursued the prediction of possible impacts resulting from the application of this technology, among others, on the deep water giant oil fields, as well as, a prediction of the main technological developments found as required for the conceptions to become available to the Company usage.
Caetano et a12 reported such study and its main conclusions.
Related Results
Multiphase Flow Metering:An Evaluation of Discharge Coefficients
Multiphase Flow Metering:An Evaluation of Discharge Coefficients
Abstract
The orifice discharge coefficient (CD) is the constant required to correct theoretical flow rate to actual flow rate. It is known that single phase orifi...
Virtual Flow Metering as an Emerging Flow Measurement Technology
Virtual Flow Metering as an Emerging Flow Measurement Technology
Abstract
The accurate measurement of multiphase rates of produced oil, water and gas has always been a significant challenge to the oil and gas industry. Over the la...
Two Phase Flow Through An Uneven Capillary At Low Reynold Numbers
Two Phase Flow Through An Uneven Capillary At Low Reynold Numbers
Abstract
The need to understand various mechanisms governing fluid-fluid displacements associated with enhanced oil recovery provides the motivation for this stud...
Numerical modeling the impacts of increasing groundwater pumping upon discharge decline of the BL Spring located in Xilin Gol League in east inner Mongolia, China
Numerical modeling the impacts of increasing groundwater pumping upon discharge decline of the BL Spring located in Xilin Gol League in east inner Mongolia, China
Spring discharge decline induced by increasing groundwater pumping under the background of increasing water demand for agricultural, industrial, and domestic utilizations has been ...
Research on mechanical characteristics and safety of working platform in rod pumping process
Research on mechanical characteristics and safety of working platform in rod pumping process
Rod pumping on offshore platform provides a solution to low efficient extraction of offshore heavy oil and the safety of working platform is the prerequisite for the implementation...
Pressure Analysis of DST Flow Period Or Slug Flow For Horizontal Wells In Homogeneous Reservoir
Pressure Analysis of DST Flow Period Or Slug Flow For Horizontal Wells In Homogeneous Reservoir
Abstract
By the transient pressure for horizontal well with constant flow rate and Duhamel's principle, this paper presents the method to calculate the transient ...
Determinants of Cerebrovascular Reserve in Patients with Significant Carotid Stenosis
Determinants of Cerebrovascular Reserve in Patients with Significant Carotid Stenosis
AbstractIntroductionIn patients with 70% to 99% diameter carotid artery stenosis cerebral blood flow reserve may be protective of future ischemic cerebral events. Reserve cerebral ...
Multiphase Pressure Transient Analysis – Agbami Case Study
Multiphase Pressure Transient Analysis – Agbami Case Study
Abstract
Production performance of well assets changes as oil and gas assets mature leading to increased breakthrough of associated fluids (gas and/or water). Classi...