Javascript must be enabled to continue!
A New Method of Predicting the Productivity And Critical Production Rate Calculation of Horizontal Well
View through CrossRef
Abstract
The paper analyzes some productivity forecast equations and critical production rate calculation of horizontal wells especially Joshi's equation of predicting productivity and Chaperon's equation of critical production rate calculation used in reservoir engineering. This paper suggests that the effective permeability should be used in calculating horizontal well productivity and points out the error existing in Joshi's equations. It also evaluates and introduces several equations of critical production rate such as Chaperon's equation and corrects the equation. Also, this paper derives two new equations for predicting horizontal well productivity and a general prediction equation of the calculation horizontal well critical production rate applying the Mirror Effect Theory Field. Applications show that the relative error between practical value and prediction value is less than 17% using a new method of prediction and the calculation result is more accurate than that of Joshi's equation. Moreover, the oil and gas fields actual examples was proved and corrected Chaperon's equation and in the derived equation both can be applied to deal with reservoir engineering calculation in the present.
Introduction
With the increase in the number of horizontal production wells from 30 in 1986 to ten thousands at present, the prediction of horizontal well productivity has become very important. At the beginning of 1980's, F. M. Giger, L.H. Reiss, Renard and Dupuy derived some equations to predict the horizontal well productivity. In 1981, S. D. Joshi re-derived the equation by using complex potential method. Regardless of an item of 1n [h/(2rw)] in the nominator, which is different from that of 1n[b/(2rw)] in Renard's equation, no difference had been made in the accuracy of the results.
In Joshi's equation, he postulated that the fluid flowing could be divided into vertical flowing and horizontal flowing. In fact, these two parts of flows are mutually perpendicular and mutually contained. But in Joshi's equation, no thought had been directed to the repeated calculation, thus the calculation accuracy was influenced.
In this paper, the equation is corrected by using average efficient permeability and as a result the Calculation error is reduced below 58 percent. Also, a new equation derived from mirror image theory, which can be used to predict precisely the horizontal well productivity in a homogeneous formation, is presented here.
In the developing of reservoir with water in horizontal wells, the main concern is the reduction of production because of the water coning. How to control the water coning is a big technological problem which has been facing petroleum engineers for a long time. Many researchers have spent a great deal of effort in studying the calculation method of critical production rate(3),(5) in horizontal wells with water coning and given their equation respectively. However, based on the same production well data, different equation will give different results, which can cause great trouble to the petroleum engineers in the reservoir calculation. In this paper, a new calculation formulation of critical production is introduced on the basis of further discussion of the concept of critical production and the detail analysis of several calculation formulations which are widely used at present.
Title: A New Method of Predicting the Productivity And Critical Production Rate Calculation of Horizontal Well
Description:
Abstract
The paper analyzes some productivity forecast equations and critical production rate calculation of horizontal wells especially Joshi's equation of predicting productivity and Chaperon's equation of critical production rate calculation used in reservoir engineering.
This paper suggests that the effective permeability should be used in calculating horizontal well productivity and points out the error existing in Joshi's equations.
It also evaluates and introduces several equations of critical production rate such as Chaperon's equation and corrects the equation.
Also, this paper derives two new equations for predicting horizontal well productivity and a general prediction equation of the calculation horizontal well critical production rate applying the Mirror Effect Theory Field.
Applications show that the relative error between practical value and prediction value is less than 17% using a new method of prediction and the calculation result is more accurate than that of Joshi's equation.
Moreover, the oil and gas fields actual examples was proved and corrected Chaperon's equation and in the derived equation both can be applied to deal with reservoir engineering calculation in the present.
Introduction
With the increase in the number of horizontal production wells from 30 in 1986 to ten thousands at present, the prediction of horizontal well productivity has become very important.
At the beginning of 1980's, F.
M.
Giger, L.
H.
Reiss, Renard and Dupuy derived some equations to predict the horizontal well productivity.
In 1981, S.
D.
Joshi re-derived the equation by using complex potential method.
Regardless of an item of 1n [h/(2rw)] in the nominator, which is different from that of 1n[b/(2rw)] in Renard's equation, no difference had been made in the accuracy of the results.
In Joshi's equation, he postulated that the fluid flowing could be divided into vertical flowing and horizontal flowing.
In fact, these two parts of flows are mutually perpendicular and mutually contained.
But in Joshi's equation, no thought had been directed to the repeated calculation, thus the calculation accuracy was influenced.
In this paper, the equation is corrected by using average efficient permeability and as a result the Calculation error is reduced below 58 percent.
Also, a new equation derived from mirror image theory, which can be used to predict precisely the horizontal well productivity in a homogeneous formation, is presented here.
In the developing of reservoir with water in horizontal wells, the main concern is the reduction of production because of the water coning.
How to control the water coning is a big technological problem which has been facing petroleum engineers for a long time.
Many researchers have spent a great deal of effort in studying the calculation method of critical production rate(3),(5) in horizontal wells with water coning and given their equation respectively.
However, based on the same production well data, different equation will give different results, which can cause great trouble to the petroleum engineers in the reservoir calculation.
In this paper, a new calculation formulation of critical production is introduced on the basis of further discussion of the concept of critical production and the detail analysis of several calculation formulations which are widely used at present.
Related Results
A New Completion Technology to Improve Horizontal Well Performances
A New Completion Technology to Improve Horizontal Well Performances
Abstract
Some recent research results have shown that especially for long horizontal wells with relatively high rate, when the friction loss plays a significant r...
Successful Refracturing Enhances Oil Production in Horizontal Wells: A Case Study from Daqing Oilfield, China
Successful Refracturing Enhances Oil Production in Horizontal Wells: A Case Study from Daqing Oilfield, China
Abstract
In recent years, hundreds of horizontal wells have been drilled with cemented casing completion in Daqing oilfield, China. Some of these wells in low per...
Survey Of Horizontal Gas Well Activity
Survey Of Horizontal Gas Well Activity
Abstract
This paper presents the results of a survey on horizontal gas well activity throughout the world. The survey was conducted for the Gas Research Institute...
Physical Modelling of Recovery Processes Utilizing Horizontal Wells-Impact of Scaling Well Size
Physical Modelling of Recovery Processes Utilizing Horizontal Wells-Impact of Scaling Well Size
Abstract
One of the main characteristics of horizontal wells is their extended contact with the reservoir. This extended contact provides many benefits for horizo...
Pressure Transient Analysis for Horizontal Well and Multi-Branched Horizontal Wells
Pressure Transient Analysis for Horizontal Well and Multi-Branched Horizontal Wells
Abstract
Transient pressure for cases of a horizontal wellbore axis with any angle inclined to a fault or a constant pressure supply boundary in anisotropic forma...
Pressure Analysis of DST Flow Period Or Slug Flow For Horizontal Wells In Homogeneous Reservoir
Pressure Analysis of DST Flow Period Or Slug Flow For Horizontal Wells In Homogeneous Reservoir
Abstract
By the transient pressure for horizontal well with constant flow rate and Duhamel's principle, this paper presents the method to calculate the transient ...
A Method to Improve Computational Efficiency of Productivity Evaluation with Rectangular Coalbed Methane Reservoir
A Method to Improve Computational Efficiency of Productivity Evaluation with Rectangular Coalbed Methane Reservoir
Computational efficiency is the key factor to be considered in the productivity evaluation of rectangular coalbed methane reservoir. There are three main factors affecting the calc...
A Comprehensive Well Test Model For Horizontal Wells With Complex Boundaries
A Comprehensive Well Test Model For Horizontal Wells With Complex Boundaries
Abstract
A mathematical model is presented to evaluate pressure response of a horizontal well in bounded homogeneous and naturals fractured reservoirs. The model ...


