Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Experience on Deepwater Drilling Riser about Hang-off Modes in Typhoon Condition of South China Sea

View through CrossRef
Abstract Typhoon occurs frequently from July to November every year in South China Sea. It develops fast, moves in high speed, and changes trajectory frequently, especially the typhoon, which is formed in local sea area near the drilling rig. It always threatens the safety of deepwater drilling operation. Typhoon response plan is therefore required to avoid damage to the deepwater drilling operation. According to traditional response plan, all the riser joints should be retrieved onto the rig floor and then the drilling rig should be steered away from the typhoon developing trajectory. However, it is a huge challenge to retrieve all the riser joints in deepwater due to limited response time. For example, the related T-time (typhoon prepare time) of L-1, with water depth over 2500m, is more than 6 days, but the forecast precision of typhoon is only 4-5 days. This indicates that it is not practical to retrieve all riser joints onto the rig in a limited response time, thus contingency plan of hanging off riser system to resist typhoon is more practical for deepwater drilling operations. A case study example is presented in this paper to discuss soft hang-off and hard hang-off mode. Different hang-off lengths are analyzed in the case study. Also, combination effect of driving speed and drilling vessel heading is considered in the case study. This paper summarises the related experience of CNOOC about how to response to typhoon in hang-off mode.
Title: Experience on Deepwater Drilling Riser about Hang-off Modes in Typhoon Condition of South China Sea
Description:
Abstract Typhoon occurs frequently from July to November every year in South China Sea.
It develops fast, moves in high speed, and changes trajectory frequently, especially the typhoon, which is formed in local sea area near the drilling rig.
It always threatens the safety of deepwater drilling operation.
Typhoon response plan is therefore required to avoid damage to the deepwater drilling operation.
According to traditional response plan, all the riser joints should be retrieved onto the rig floor and then the drilling rig should be steered away from the typhoon developing trajectory.
However, it is a huge challenge to retrieve all the riser joints in deepwater due to limited response time.
For example, the related T-time (typhoon prepare time) of L-1, with water depth over 2500m, is more than 6 days, but the forecast precision of typhoon is only 4-5 days.
This indicates that it is not practical to retrieve all riser joints onto the rig in a limited response time, thus contingency plan of hanging off riser system to resist typhoon is more practical for deepwater drilling operations.
A case study example is presented in this paper to discuss soft hang-off and hard hang-off mode.
Different hang-off lengths are analyzed in the case study.
Also, combination effect of driving speed and drilling vessel heading is considered in the case study.
This paper summarises the related experience of CNOOC about how to response to typhoon in hang-off mode.

Related Results

Riser Integrity Management-Recent Advances in the Deepwater Industry Practice
Riser Integrity Management-Recent Advances in the Deepwater Industry Practice
Abstract Riser Integrity Management (RIM) could be defined as a continuous process of ‘knowledge and experience management’ applied throughout the lifecycle of th...
Time-Domain Research on Integrated Coupling Model of MODU, Drilling Riser and Wellhead
Time-Domain Research on Integrated Coupling Model of MODU, Drilling Riser and Wellhead
The coupling effects between MODU and slim drilling riser are of primary importance in analysis of dynamic response of drilling riser system. However,, the effect of MODU on drilli...
Riser Tensioner Force Variations
Riser Tensioner Force Variations
ABSTRACT Excessive riser force variation on the upper joint in a riser string can lead to buckling and excessive fatigue. This variation is due to two components ...
NDP Review of State-of-the-Art in Riser Monitoring: Lessons Learned and Experiences Gained
NDP Review of State-of-the-Art in Riser Monitoring: Lessons Learned and Experiences Gained
Abstract As part of the Norwegian Deepwater Programme (NDP) a state of the art review was carried out by DNV to gather information on the various riser monitoring...
COBRA Riser Concept for Ultra Deepwater Condition
COBRA Riser Concept for Ultra Deepwater Condition
Offshore ultra deepwater field is being promising as the future of oil and gas reserves. However, the development of ultra deepwater field posed many challenges, in particular, on ...
Hybrid Riser Base Jumper Design Methods, Challenges and Solutions
Hybrid Riser Base Jumper Design Methods, Challenges and Solutions
Abstract The increased number of hybrid riser systems, either installed or planned, in deepwater regions across the world has driven a corresponding growth in the...
Drilling Riser Design and Analysis for Deepwater Applications
Drilling Riser Design and Analysis for Deepwater Applications
A riser is a fluid conduit from subsea equipment to surface floating production systems such as spars, TLPs, and semi-submersibles. It is a key component in a drilling and producin...

Back to Top