Experience on Deepwater Drilling Riser about Hang-off Modes in Typhoon Condition of South China Sea
View through CrossRef
Abstract
Typhoon occurs frequently from July to November every year in South China Sea. It develops fast, moves in high speed, and changes trajectory frequently, especially the typhoon, which is formed in local sea area near the drilling rig. It always threatens the safety of deepwater drilling operation. Typhoon response plan is therefore required to avoid damage to the deepwater drilling operation. According to traditional response plan, all the riser joints should be retrieved onto the rig floor and then the drilling rig should be steered away from the typhoon developing trajectory. However, it is a huge challenge to retrieve all the riser joints in deepwater due to limited response time. For example, the related T-time (typhoon prepare time) of L-1, with water depth over 2500m, is more than 6 days, but the forecast precision of typhoon is only 4-5 days. This indicates that it is not practical to retrieve all riser joints onto the rig in a limited response time, thus contingency plan of hanging off riser system to resist typhoon is more practical for deepwater drilling operations.
A case study example is presented in this paper to discuss soft hang-off and hard hang-off mode. Different hang-off lengths are analyzed in the case study. Also, combination effect of driving speed and drilling vessel heading is considered in the case study. This paper summarises the related experience of CNOOC about how to response to typhoon in hang-off mode.
Title: Experience on Deepwater Drilling Riser about Hang-off Modes in Typhoon Condition of South China Sea
Description:
Abstract
Typhoon occurs frequently from July to November every year in South China Sea.
It develops fast, moves in high speed, and changes trajectory frequently, especially the typhoon, which is formed in local sea area near the drilling rig.
It always threatens the safety of deepwater drilling operation.
Typhoon response plan is therefore required to avoid damage to the deepwater drilling operation.
According to traditional response plan, all the riser joints should be retrieved onto the rig floor and then the drilling rig should be steered away from the typhoon developing trajectory.
However, it is a huge challenge to retrieve all the riser joints in deepwater due to limited response time.
For example, the related T-time (typhoon prepare time) of L-1, with water depth over 2500m, is more than 6 days, but the forecast precision of typhoon is only 4-5 days.
This indicates that it is not practical to retrieve all riser joints onto the rig in a limited response time, thus contingency plan of hanging off riser system to resist typhoon is more practical for deepwater drilling operations.
A case study example is presented in this paper to discuss soft hang-off and hard hang-off mode.
Different hang-off lengths are analyzed in the case study.
Also, combination effect of driving speed and drilling vessel heading is considered in the case study.
This paper summarises the related experience of CNOOC about how to response to typhoon in hang-off mode.
Related Results
Time-Domain Research on Integrated Coupling Model of MODU, Drilling Riser and Wellhead
Time-Domain Research on Integrated Coupling Model of MODU, Drilling Riser and Wellhead
The coupling effects between MODU and slim drilling riser are of primary importance in analysis of dynamic response of drilling riser system. However,, the effect of MODU on drilli...
COBRA Riser Concept for Ultra Deepwater Condition
COBRA Riser Concept for Ultra Deepwater Condition
Offshore ultra deepwater field is being promising as the future of oil and gas reserves. However, the development of ultra deepwater field posed many challenges, in particular, on ...
Hybrid Riser Base Jumper Design Methods, Challenges and Solutions
Hybrid Riser Base Jumper Design Methods, Challenges and Solutions
Abstract
The increased number of hybrid riser systems, either installed or planned, in deepwater regions across the world has driven a corresponding growth in the...
Drilling Riser Design and Analysis for Deepwater Applications
Drilling Riser Design and Analysis for Deepwater Applications
A riser is a fluid conduit from subsea equipment to surface floating production systems such as spars, TLPs, and semi-submersibles. It is a key component in a drilling and producin...
Comparative Study for a Dropped Riser Simulation Using Two Commercial Finite Element Analysis Software
Comparative Study for a Dropped Riser Simulation Using Two Commercial Finite Element Analysis Software
Abstract
Although the possibility of a riser dropping off from its top hang-off point during installation or in service is minimal, such incident can pose significan...
Deepwater Production Riser
Deepwater Production Riser
ABSTRACT
A deepwater production riser design developed by Mobil Research and Development Corporation is presented. The riser consists of a lower rigid section ter...
Multiple Riser System for Shallow Water
Multiple Riser System for Shallow Water
Abstract
Shallow water and high wave induced ship motions create a challenging and harsh environment for flexible risers and umbilicals. Two new riser systems are...
Low Cost Deepwater Hybrid Riser System.
Low Cost Deepwater Hybrid Riser System.
Abstract
The design and analysis of a cost effective multi flowpath production riser for deep and ultra deep water floating production systems is presented. The d...