Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Impact of Delay and Queue on the Length of Left-Turn Storage at Palestine Intersections in Baghdad city, Iraq

View through CrossRef
At intersections, Left-turning vehicles seek to occupy the same physical space as close to the stop line as possible. These result in high conflicts, delays, and blockage of vehicles by turning vehicles and vice versa. The impact of the lengths of Left-turn lanes on intersection delays is considered to optimize the lengths of the Left-turn lanes. Data for traffic counts, queue lengths, and signal timing are collected from three intersections in Baghdad city in Iraq. The methodology involves the development of estimation models using traffic Simulation SIDRA INTERSECTION 8.0 and simulating various scenarios by varying traffic signal conditions to evaluate delays and queues caused by varying lengths of the Left-turn Lane. Optimal lengths are computed and compared to existing lengths in intersections. No differences in delay, queue, and lengths of the Left turn lane are found using t-test analysis for significance. Outputs from the three models were compared to the maximum observed in the field from the selected intersections. Data analysis involved determining the R2 and the standard error mean between the model output and the observed data. In general, SIDRA INTERSECTION 8.0 overestimated queue vehicles and length of storage for approaches with a high degree of saturation ratios and underestimated it for those with a high degree of saturation ratios.
Title: Impact of Delay and Queue on the Length of Left-Turn Storage at Palestine Intersections in Baghdad city, Iraq
Description:
At intersections, Left-turning vehicles seek to occupy the same physical space as close to the stop line as possible.
These result in high conflicts, delays, and blockage of vehicles by turning vehicles and vice versa.
The impact of the lengths of Left-turn lanes on intersection delays is considered to optimize the lengths of the Left-turn lanes.
Data for traffic counts, queue lengths, and signal timing are collected from three intersections in Baghdad city in Iraq.
The methodology involves the development of estimation models using traffic Simulation SIDRA INTERSECTION 8.
0 and simulating various scenarios by varying traffic signal conditions to evaluate delays and queues caused by varying lengths of the Left-turn Lane.
Optimal lengths are computed and compared to existing lengths in intersections.
No differences in delay, queue, and lengths of the Left turn lane are found using t-test analysis for significance.
Outputs from the three models were compared to the maximum observed in the field from the selected intersections.
Data analysis involved determining the R2 and the standard error mean between the model output and the observed data.
In general, SIDRA INTERSECTION 8.
0 overestimated queue vehicles and length of storage for approaches with a high degree of saturation ratios and underestimated it for those with a high degree of saturation ratios.

Related Results

Hydatid Disease of The Brain Parenchyma: A Systematic Review
Hydatid Disease of The Brain Parenchyma: A Systematic Review
Abstarct Introduction Isolated brain hydatid disease (BHD) is an extremely rare form of echinococcosis. A prompt and timely diagnosis is a crucial step in disease management. This ...
Chaos-control and parallel queue synchronization of laser local area network
Chaos-control and parallel queue synchronization of laser local area network
In this work, we study the chaos-control and parallel queue synchronization of a laser local area network (LAN). We present and study specifically a “single-queue-double-parameter”...
Hydatid Cyst of The Orbit: A Systematic Review with Meta-Data
Hydatid Cyst of The Orbit: A Systematic Review with Meta-Data
Abstarct Introduction Orbital hydatid cysts (HCs) constitute less than 1% of all cases of hydatidosis, yet their occurrence is often linked to severe visual complications. This stu...
MENGUKUR EFEKTIVITAS DAN PEMODELAN SISTEM ANTRIAN PADA POLSEK PAMULANG KOTA TANGERANG SELATAN
MENGUKUR EFEKTIVITAS DAN PEMODELAN SISTEM ANTRIAN PADA POLSEK PAMULANG KOTA TANGERANG SELATAN
Bureaucracy services in Indonesia haven’t given satisfaction to the society. One of services that   always complained is about queue problem. Queue system that isn’t optimal will g...
Characteristics analysis and safety evaluation of vehicles turning over long distances
Characteristics analysis and safety evaluation of vehicles turning over long distances
In order to explore the motion and safety characteristics of the U-turn vehicles at long-range U-turn intersections, based on the measured data of the U-turn vehicles at typical lo...
The United States influence in Iraq’s post-Saddam reconfiguration of power:
The United States influence in Iraq’s post-Saddam reconfiguration of power:
In 2003, the United States of America started a reconfiguration process of Iraq’s political-economic structure. After the overthrown of Saddam Hussein, the United Nation Security C...
Esfahan multi-node metropolis: conflicts and opportunities on urban nodes and intersections
Esfahan multi-node metropolis: conflicts and opportunities on urban nodes and intersections
(English) As one of the world's most famous Islamic cities globally, Esfahan has been the focus of previous architectural and urban studies discussing its forms and structures and ...
PALESTINE, INTERNATIONAL LAW AND MUSLIM UNITY
PALESTINE, INTERNATIONAL LAW AND MUSLIM UNITY
The Palestine issue is a heart breaking politico-legal issue that has remained unresolved for so long. The issue started immediately after the disintegration of the Ottoman Empire ...

Back to Top