Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Kajian Potensi dan Efisiensi Energi Pembangkit Listrik Tenaga Surya (PLTS) di Wilayah Pekanbaru

View through CrossRef
Indonesia is in the tropics has the potential of solar energy is very large about an average of 4.8 kWh / m2 / day or equivalent to 112,000 GWp, but which has been utilized only about 71.02 MWp of terintrkoneksi and off-grid therefore Solar energy to be an alternative The most widely developed and reliable. Solar power plants that have unlimited reserves and are environmentally friendly energy needs to be developed in accordance with the carrying capacity of Pekanbaru city which is included in the most potential irradiation zone that is five hours per day. This research studies the potential and efficiency of PLTS for the new weekend region in order to support the utilization of solar energy as an alternative power plant with the aim of obtaining the potential of electrical energy generated from the conversion of solar energy, obtaining the efficiency of solar energy conversion Pekanbaru region and Solar energy mapping in Pekanbaru region optimization Utilization of renewable energy potential in Pekanbaru City.Measurements are made on June 17, 2017 to 23 June 2017 and 06 July 2017 s / d 12 July 2017 at two locations namely Village Umban Sari district Rumbai and Simpang Baru Village District Tampan Kota. By using Monocrystalline type solar cell with Maximum Power 50 watt rate obtained efficiency result of 19.5% and energy peotensi equal to 85,462 Wh per day at first measurement point and 84,562 Wh per day at second point of measurement. For one house with 1200 VA power required approximately 15 Monocrystalline type solar cells with solar energy potential that can be generated by 1.275 Wh. Assuming 50% of the head of Pekanbaru city's population of approximately 250,000 households use solar energy, the potential of solar energy that can be utilized is 318 MWh. Suraya Energy can help approximately 25% of existing energy sources, namely PLTD, PLTA, and PLTU in the city of Pekanbaru.
LPPM Universitas Muhammadiyah Riau
Title: Kajian Potensi dan Efisiensi Energi Pembangkit Listrik Tenaga Surya (PLTS) di Wilayah Pekanbaru
Description:
Indonesia is in the tropics has the potential of solar energy is very large about an average of 4.
8 kWh / m2 / day or equivalent to 112,000 GWp, but which has been utilized only about 71.
02 MWp of terintrkoneksi and off-grid therefore Solar energy to be an alternative The most widely developed and reliable.
Solar power plants that have unlimited reserves and are environmentally friendly energy needs to be developed in accordance with the carrying capacity of Pekanbaru city which is included in the most potential irradiation zone that is five hours per day.
This research studies the potential and efficiency of PLTS for the new weekend region in order to support the utilization of solar energy as an alternative power plant with the aim of obtaining the potential of electrical energy generated from the conversion of solar energy, obtaining the efficiency of solar energy conversion Pekanbaru region and Solar energy mapping in Pekanbaru region optimization Utilization of renewable energy potential in Pekanbaru City.
Measurements are made on June 17, 2017 to 23 June 2017 and 06 July 2017 s / d 12 July 2017 at two locations namely Village Umban Sari district Rumbai and Simpang Baru Village District Tampan Kota.
By using Monocrystalline type solar cell with Maximum Power 50 watt rate obtained efficiency result of 19.
5% and energy peotensi equal to 85,462 Wh per day at first measurement point and 84,562 Wh per day at second point of measurement.
For one house with 1200 VA power required approximately 15 Monocrystalline type solar cells with solar energy potential that can be generated by 1.
275 Wh.
Assuming 50% of the head of Pekanbaru city's population of approximately 250,000 households use solar energy, the potential of solar energy that can be utilized is 318 MWh.
Suraya Energy can help approximately 25% of existing energy sources, namely PLTD, PLTA, and PLTU in the city of Pekanbaru.

Related Results

Model Hybrid Pembangkit Listrik Di Pedesaan
Model Hybrid Pembangkit Listrik Di Pedesaan
Energi listrik merupakan salah satu jenis energi yang paling banyak digunakan dalam aktivitas manusia sehari-hari. pemenuhan kebutuhan energi listrik dapat meningkatkan kesejahtera...
RANCANG BANGUN PANEL SURYA BERBASIS LIMBAH RUMAH TANGGA UNTUK KEBUTUHAN PENERANGAN JALAN RW 3 KELURAHAN BERGASLOR, SEMARANG
RANCANG BANGUN PANEL SURYA BERBASIS LIMBAH RUMAH TANGGA UNTUK KEBUTUHAN PENERANGAN JALAN RW 3 KELURAHAN BERGASLOR, SEMARANG
Listrik merupkan salah satu sumber energy yang menjadi kebutuhan untuk menunjang berbagai macam aktivitas manusia, salah satunya adalah pembangkit listrik tenaga surya. Pembangkit ...
SOSIALISASI DAN IMPLEMENTASI RENEWABLE ENERGY DI SMKN 1 CIMAHI
SOSIALISASI DAN IMPLEMENTASI RENEWABLE ENERGY DI SMKN 1 CIMAHI
Pemerintah menargetkan hingga 2030 akan terpasang 6GWp instalasi pembangkit listrik tenaga surya (PLTS). Semakin meningkatnya penggunaan teknologi panel surya harusnya diimbangi de...
Audit Energi pada Dua Produk Kaca Lembaran di sebuah Pabrik Kaca
Audit Energi pada Dua Produk Kaca Lembaran di sebuah Pabrik Kaca
Industri pembuatan kaca tersusun atas empat bagian primer, yaitu: kaca lembaran, kaca khusus, kaca fiber, dan kaca container. Pabrik X merupakan sebuah perusahaan besar penghasil k...
Pembangkit Listrik Tenaga Surya Off-Grid dengan Proteksi Baterai
Pembangkit Listrik Tenaga Surya Off-Grid dengan Proteksi Baterai
Listrik sudah menjadi kebutuhan pokok bagi keperluan rumah tangga, namun banyak daerah di Indonesia yang masih belum terakses listrik PLN. Untuk menghasilkan listrik dapat dilakuka...
Implementasi Web SCADA Pada Sistem PLTS
Implementasi Web SCADA Pada Sistem PLTS
Salah satu isu yang semakin mendesak untuk dicari solusinya adalah krisis energi yang semakin meningkat dan dampak negatifnya terhadap lingkungan. Dalam menghadapi masalah ini, sal...
MANAJEMEN PEMAKAIAN PULSA LISTRIK PELANGGAN METER PRABAYAR
MANAJEMEN PEMAKAIAN PULSA LISTRIK PELANGGAN METER PRABAYAR
Salah satu kekurangan sistem kWh meter digital prabayar adalah tidak dapat melakukan pemantauan pemakaian energi listrik secara real time, sehingga token listrik habis sebelum wakt...

Back to Top