Offshore wind is the most mature of the offshore renewable energy technologies and has a significant role to play in the energy transition. 2000 GW of offshore wind capacity is anticipated globally by 2050 in order meet the targets of the Paris Agreement [1]. These ambitions correspond to a 35-fold increase compared to current installed offshore wind capacity, which has taken three decades to achieve, thus requiring an installation rate between now and the mid-century far out-stripping that currently achieved [2]. The pace and scale of offshore wind ambitions to support the energy transition present a range of challenges for the offshore geotechnical sector and the broader offshore wind sector, with impacts across the supply chain regarding availability of raw materials, vessels, equipment and personnel, and across each stage of the life-cycle of the projects from marine spatial planning, site investigation, design, manufacturing, installation, operation and decommissioning. To address these challenges, the sector faces key imperatives, including (i) to determine where best to place future offshore windfarms to meet technical, social and environmental requirements and identify where technology and knowledge gaps exist, (ii) to improve efficiency in deriving geotechnical design parameters in order to alleviate pressures on people, vessels, equipment and labs for site investigation and interpretation of test results; (iii) to improve efficiency of design outcomes, i.e. to achieve greater capacity:weight efficiency for foundations, anchors and mooring systems to ease supply chain, manufacturing and installation pressures, while maintaining necessary reliability; (iv) to improve time efficiency to complete designs in order to make design calculations and processes less time- and personnel-intensive to carry out; and (v) to improve the life-cycle cost of delivering the necessary offshore wind to enable a net zero future through considering the end of engineered life at the design stage.
Figure 1 illustrates the magnitude of the projected and necessary growth in offshore wind globally to 2050 in terms of installed offshore wind capacity and number of turbines, with an indication of the associated geotechnical implications for this pace and scale of growth.
Potential solutions to address the identified challenges and associated imperatives include those to address specifically geotechnical challenges, but also geotechnical solutions to offshore wind challenges beyond the seabed. For example, (i) use of geospatial mapping and analysis to determine the available seabed areas for future offshore windfarms and identify suitable foundations or anchors for particular regions, which can in turn inform on supply chain or critical technology and knowledge gaps [4]; (ii) innovations to increase efficiency of offshore site investigation, including software [5] [6] and hardware approaches [7] to facilitate seabed characterization at meaningful spatial and temporal scales; (iii) innovations in design philosophy, concepts and methods to improve design outcomes for foundations and anchoring systems, including whole life geotechnical design [8], novel moorings and anchors [9] [10] [11] and integrated design [12]; (iv) creation of optimization design tools that can directly address the design question, avoiding numerous ad hoc individual analyses to hone in to a workable solution [13] [14]; and (v) methods to inform on requirements for end of engineered life, e.g. retrieval or stability if left in situ beyond the design life [15] [16], and geospatial mapping to understand the distribution of assets at the end of engineered life in order to plan for recycling or disposal [17].
Title: Offshore geotechnical challenges of the energy transition
Description:
Offshore wind is the most mature of the offshore renewable energy technologies and has a significant role to play in the energy transition.
2000 GW of offshore wind capacity is anticipated globally by 2050 in order meet the targets of the Paris Agreement [1].
These ambitions correspond to a 35-fold increase compared to current installed offshore wind capacity, which has taken three decades to achieve, thus requiring an installation rate between now and the mid-century far out-stripping that currently achieved [2].
The pace and scale of offshore wind ambitions to support the energy transition present a range of challenges for the offshore geotechnical sector and the broader offshore wind sector, with impacts across the supply chain regarding availability of raw materials, vessels, equipment and personnel, and across each stage of the life-cycle of the projects from marine spatial planning, site investigation, design, manufacturing, installation, operation and decommissioning.
To address these challenges, the sector faces key imperatives, including (i) to determine where best to place future offshore windfarms to meet technical, social and environmental requirements and identify where technology and knowledge gaps exist, (ii) to improve efficiency in deriving geotechnical design parameters in order to alleviate pressures on people, vessels, equipment and labs for site investigation and interpretation of test results; (iii) to improve efficiency of design outcomes, i.
e.
to achieve greater capacity:weight efficiency for foundations, anchors and mooring systems to ease supply chain, manufacturing and installation pressures, while maintaining necessary reliability; (iv) to improve time efficiency to complete designs in order to make design calculations and processes less time- and personnel-intensive to carry out; and (v) to improve the life-cycle cost of delivering the necessary offshore wind to enable a net zero future through considering the end of engineered life at the design stage.
Figure 1 illustrates the magnitude of the projected and necessary growth in offshore wind globally to 2050 in terms of installed offshore wind capacity and number of turbines, with an indication of the associated geotechnical implications for this pace and scale of growth.
Potential solutions to address the identified challenges and associated imperatives include those to address specifically geotechnical challenges, but also geotechnical solutions to offshore wind challenges beyond the seabed.
For example, (i) use of geospatial mapping and analysis to determine the available seabed areas for future offshore windfarms and identify suitable foundations or anchors for particular regions, which can in turn inform on supply chain or critical technology and knowledge gaps [4]; (ii) innovations to increase efficiency of offshore site investigation, including software [5] [6] and hardware approaches [7] to facilitate seabed characterization at meaningful spatial and temporal scales; (iii) innovations in design philosophy, concepts and methods to improve design outcomes for foundations and anchoring systems, including whole life geotechnical design [8], novel moorings and anchors [9] [10] [11] and integrated design [12]; (iv) creation of optimization design tools that can directly address the design question, avoiding numerous ad hoc individual analyses to hone in to a workable solution [13] [14]; and (v) methods to inform on requirements for end of engineered life, e.
g.
retrieval or stability if left in situ beyond the design life [15] [16], and geospatial mapping to understand the distribution of assets at the end of engineered life in order to plan for recycling or disposal [17].
Related Results
Alternative Offshore Foundation Installation Methods
Alternative Offshore Foundation Installation Methods
Abstract
According to the European Wind Energy Association (EWEA) in the first six months of 2012, Europe installed and fully grid connected 132 offshore wind tur...
Potential of Offshore Wind Energy in Australia
Potential of Offshore Wind Energy in Australia
Abstract
Offshore wind energy has attracted great attention from numerous committees including governments, academics and engineers and energy companies due to gr...
Fertility Transition Across Major Sub-Saharan African Cities: The Role of Proximate Determinants
Fertility Transition Across Major Sub-Saharan African Cities: The Role of Proximate Determinants
Abstract
Background
Sub-Saharan Africa’s fertility transition has lagged behind other regions despite rapid urbanization, resulting in persistently high fertility rates. S...
Is There Anything Better Than LRFD For Simplified Geotechnical RBD?
Is There Anything Better Than LRFD For Simplified Geotechnical RBD?
Geotechnical design codes, be it reliability-based or otherwise, must cater to diverse local site conditions and diverse local practices that grew and adapted over the years to sui...
Addressing the Energy Trilemma: Offshore Drilling Rig Decarbonization
Addressing the Energy Trilemma: Offshore Drilling Rig Decarbonization
Abstract
Offshore drilling rigs play a crucial role in global energy production, particularly in the extraction of oil and gas resources. However, the industry's env...
Conceptualizing sustainable offshore operations: integration of renewable energy systems
Conceptualizing sustainable offshore operations: integration of renewable energy systems
This paper conceptualizes sustainable offshore operations through the integration of renewable energy systems, focusing on the adoption of solar-powered systems for remote applicat...
Floating LNG: New Rule Note for the Classification of LNG FPSO
Floating LNG: New Rule Note for the Classification of LNG FPSO
Abstract
Offshore LNG terminals are today broadly considered by the industry to respond to the world thirst of energy in a rapid and efficient manner. In order to...
Electrical Energy Transition in the Context of Ghana
Electrical Energy Transition in the Context of Ghana
Abstract
Background In Ghana, energy transition as a research theme is new and its manifestations are not glaring. It is inconclusive as to whether energy transition has oc...