Selection of Hose Systems for SPM Tanker Terminals

View through CrossRef
Abstract Deepwater tanker terminals incorporating the single point mooring principle are becoming quite common in the modern offshore oil production complex, both for loading export ships at crude producing areas and L1Dloading at processing locations. Large crude oil reserves and volume production capability must be augmented by large and dependable transportation systems to allow remote oil fields to remain competitive. Super-sized export tankers demand rapid loading and unloading. At Single Point Moorings, they require large diameter hose systems to achieve maximum cargo transfer rates. Proper selection of surface and sub-surface hose types can assure dependable terminal utilization. Improper selection result in unnecessary tanker delay, drowning or starving storage capacity and decreases in production. Operational and environmental conditions must be studied and all available hose designs considered before an SPM hose system can be finalized. This paper will review these factors by following simplified calculations for a hypothetical SPM terminal. It will show how to select and combine individual hose designs into an efficient, effective and economical SPM bose system. Introduction De0pwatertanker terminals incorporating the single point mooring principle have become quite common in the modern off-shore oil production complex, both for loading export shipsat crude terminals and offloading at processing locations. The military is also using SPM systems to offload refined products at storage areas. Large crude oil reserves and volume production capabilities must be augmented by large and dependable transportation systems to allow remote oilfield to remain competitive. The spectacular growth in, tanker size present?s new problems for cargo loading and discharging (Figures 1 & 2) Mammoth tankers of 300,000 dead weight ton class are here today. Twelve years ago, there was one tanker in use in the 100,000 dead weight ton class. Single point mooring systems have proven their ability to cut down turn-around time. Zueitina, Libya has experienced loading time reductions through the world?s first 24 hose SPM system, installed July 1968, from 50 hours to 27 hours. (Figure 3) Proper selection of surface and sub-surface hoses can assure dependable terminal utilization. Improper select ion can result in unnecessary tanker delay, starving storage capacity and lost production. Operational and environmental conditions must be studied and all available hose design s considered before, an SPM System can be finalized. SPM Hose In the common SPM concept there are actually two hose system (Figure 4). One connecting the PLEM (Pipeline End Manifold) with the manifolds under the buoy and one floating on the surface from the buoy to the tanker manifolds. The following are actors used in determining the length of these hose strings and the constructions of the various hose design to be incorporated into a system:Mean water depthDepth at low tide and high tideMaximum wave heightPosition of buoy relative to pipeline headerMaximum mooring distance of tankerMaximum tanker sizeMaximum elevation of tanker manifolds when lightMaximum distance from tanker manifolds to tanker railRated working pressure of hose required.
Title: Selection of Hose Systems for SPM Tanker Terminals
Description:
Abstract Deepwater tanker terminals incorporating the single point mooring principle are becoming quite common in the modern offshore oil production complex, both for loading export ships at crude producing areas and L1Dloading at processing locations.
Large crude oil reserves and volume production capability must be augmented by large and dependable transportation systems to allow remote oil fields to remain competitive.
Super-sized export tankers demand rapid loading and unloading.
At Single Point Moorings, they require large diameter hose systems to achieve maximum cargo transfer rates.
Proper selection of surface and sub-surface hose types can assure dependable terminal utilization.
Improper selection result in unnecessary tanker delay, drowning or starving storage capacity and decreases in production.
Operational and environmental conditions must be studied and all available hose designs considered before an SPM hose system can be finalized.
This paper will review these factors by following simplified calculations for a hypothetical SPM terminal.
It will show how to select and combine individual hose designs into an efficient, effective and economical SPM bose system.
Introduction De0pwatertanker terminals incorporating the single point mooring principle have become quite common in the modern off-shore oil production complex, both for loading export shipsat crude terminals and offloading at processing locations.
The military is also using SPM systems to offload refined products at storage areas.
Large crude oil reserves and volume production capabilities must be augmented by large and dependable transportation systems to allow remote oilfield to remain competitive.
The spectacular growth in, tanker size present?s new problems for cargo loading and discharging (Figures 1 & 2) Mammoth tankers of 300,000 dead weight ton class are here today.
Twelve years ago, there was one tanker in use in the 100,000 dead weight ton class.
Single point mooring systems have proven their ability to cut down turn-around time.
Zueitina, Libya has experienced loading time reductions through the world?s first 24 hose SPM system, installed July 1968, from 50 hours to 27 hours.
(Figure 3) Proper selection of surface and sub-surface hoses can assure dependable terminal utilization.
Improper select ion can result in unnecessary tanker delay, starving storage capacity and lost production.
Operational and environmental conditions must be studied and all available hose design s considered before, an SPM System can be finalized.
SPM Hose In the common SPM concept there are actually two hose system (Figure 4).
One connecting the PLEM (Pipeline End Manifold) with the manifolds under the buoy and one floating on the surface from the buoy to the tanker manifolds.
The following are actors used in determining the length of these hose strings and the constructions of the various hose design to be incorporated into a system:Mean water depthDepth at low tide and high tideMaximum wave heightPosition of buoy relative to pipeline headerMaximum mooring distance of tankerMaximum tanker sizeMaximum elevation of tanker manifolds when lightMaximum distance from tanker manifolds to tanker railRated working pressure of hose required.

Related Results

Exposed Location Single Buoy Mooring
Exposed Location Single Buoy Mooring
ABSTRACT Since 1961 Single Point Moorings (SPM's) have been used successfully in nearly all parts of the world. Nevertheless the feasibility of ...
Improving Underbuoy Hose System Design Using Relaxed Storm Design Criteria
Improving Underbuoy Hose System Design Using Relaxed Storm Design Criteria
ABSTRACT A comparative study of two underbuoy hose systems designed for the same location, one according to the expected 10 year extremes, the other to 100 year e...
Push-On Hose and Mating Hose Fittings
Push-On Hose and Mating Hose Fittings
<div class="section abstract"> <div class="htmlview paragraph">SAE J2552 provides limited, dimensional and general performance requirements for low pressure, field at...
Modeling of the Non-Braided Fabric Composite Rubber Hose for Industrial Hose Pump Design
Modeling of the Non-Braided Fabric Composite Rubber Hose for Industrial Hose Pump Design
Due to the harsh operating conditions in an industrial hose pump, accurate numerical simulations of the hose with high speed would be significant but tough. The main goal of this p...
IMPLEMENTASI KEBIJAKAN STANDAR PELAYANAN MINIMAL (SPM) PADA PELAYANAN KESEHATAN DIABETES MELLITUS (DM) DI PUSKESMAS BIROBULI
IMPLEMENTASI KEBIJAKAN STANDAR PELAYANAN MINIMAL (SPM) PADA PELAYANAN KESEHATAN DIABETES MELLITUS (DM) DI PUSKESMAS BIROBULI
. This research aims to describe and explain the implementation of the SPM policy in Diabetes Mellitus (DM) health services at the Birobuli Community Health Center. This research m...
The Feasibility of National Inference Under the NSCAW IV L-State Sample Design
The Feasibility of National Inference Under the NSCAW IV L-State Sample Design
The purpose of this Feasibility Analysis Study (FAS) was to evaluate methods for producing valid national estimates under the National Survey of Child and Adolescent Well-being (NS...
ANALISIS KETERSEDIAAN PRASARANA DAN SARANA PERMUKIMAN NELAYAN DI KELURAHAN LAKOLOGOU KECAMATAN KOKALUKUNA KOTA BAUBAU
ANALISIS KETERSEDIAAN PRASARANA DAN SARANA PERMUKIMAN NELAYAN DI KELURAHAN LAKOLOGOU KECAMATAN KOKALUKUNA KOTA BAUBAU
Penelitian ini bertujuan mengidentifikasi dan menganalisis kondisi lingkungan permukiman di tinjau dari aspek fisik (prasarana dan sarana), sosial dan ekonomi masyarakat di Kelurah...
Avaliação de síndrome pré-menstrual e cefaleia em estudantes de medicina
Avaliação de síndrome pré-menstrual e cefaleia em estudantes de medicina
IntroduçãoA cefaleia é um sintoma comum durante o ciclo menstrual. A Sociedade Internacional de Cefaleia considera o diagnóstico “razoável” se 90% dos ataques estiverem compreendid...

Back to Top