Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Study on flood control projects joint flood control operation of The Daqing river basin

View through CrossRef
Abstract Baiyangdian Lake is an important pivotal project in the Daqing River Basin. The research on the joint flood control operation of water projects in the Daqing River Basin seems particularly important as higher requirements have been set for the flood control in the basin based on the construction of the Xiong’an New Area. In this paper, a joint flood control operation model was set up and solved with the joint flood control operation objective of minimizing the highest water level of Baiyangdian Lake. A study on the joint flood control operation under different flood conditions was carried out under the premise of ensuring the safety of reservoir projects. The optimal operation can ensure that the Wen’anwa flood storage and detention area will not be opened in the event of a hundred-year flood, reduce the highest water level of Baiyangdian Lake to a certain extent, effectively alleviate the pressure on the flood control of dikes and Baiyangdian Lake and provide support for guaranteeing the flood control safety of the Xiong’an New Area.
Title: Study on flood control projects joint flood control operation of The Daqing river basin
Description:
Abstract Baiyangdian Lake is an important pivotal project in the Daqing River Basin.
The research on the joint flood control operation of water projects in the Daqing River Basin seems particularly important as higher requirements have been set for the flood control in the basin based on the construction of the Xiong’an New Area.
In this paper, a joint flood control operation model was set up and solved with the joint flood control operation objective of minimizing the highest water level of Baiyangdian Lake.
A study on the joint flood control operation under different flood conditions was carried out under the premise of ensuring the safety of reservoir projects.
The optimal operation can ensure that the Wen’anwa flood storage and detention area will not be opened in the event of a hundred-year flood, reduce the highest water level of Baiyangdian Lake to a certain extent, effectively alleviate the pressure on the flood control of dikes and Baiyangdian Lake and provide support for guaranteeing the flood control safety of the Xiong’an New Area.

Related Results

Sustaining the Pearl River: Problems, Chanllenges, and Opportunities
Sustaining the Pearl River: Problems, Chanllenges, and Opportunities
The Pearl River is a large water system, which is the second largest river (in terms of mean annual water discharge) in China. The Pearl River Basin consists of three major rivers,...
Flodfund - Bronzealderdeponeringer fra Gudenåen
Flodfund - Bronzealderdeponeringer fra Gudenåen
River findsBronze Age metalwork from the river GudenåBronze Age metalwork (primarily swords and other weapons) found in European rivers has aroused interest for many years, but lit...
Probabilistic Flood Hazard Maps at Ungauged Locations Using Multivariate Extreme Values Approach
Probabilistic Flood Hazard Maps at Ungauged Locations Using Multivariate Extreme Values Approach
<p>Flood hazard maps are essential for development and assessment of flood risk management strategies. Conventionally, flood hazard assessment is based on determinist...
ASP Flood After a Polymer Flood vs. ASP Flood After a Water Flood
ASP Flood After a Polymer Flood vs. ASP Flood After a Water Flood
Abstract Alkaline-surfactant-polymer (ASP) flooding is an effective technique to improve oil recovery. It has been applied typically after a water flood. Recently, t...
Unravelling the river morphological – flood pattern linkages in Ayeyarwady River Basin, Myanmar
Unravelling the river morphological – flood pattern linkages in Ayeyarwady River Basin, Myanmar
<p>The Ayeyarwady River in Myanmar is one of the last free flowing large rivers in the Southeast Asian region. It hosts some of key biodiversity hotspots in the Indo-...
Evaluation of Flood Forecasting, Early Warning System and its Role in Flood Management in Indus basin, Pakistan
Evaluation of Flood Forecasting, Early Warning System and its Role in Flood Management in Indus basin, Pakistan
This paper evaluates the effectiveness of Flood Forecasting and Early Warning (FF&EWS) in the Indus basin, Pakistan. It is non-structural measures, used extensively. It forecas...

Back to Top