Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Ninian Third Party Project: A Unique North Sea Challenge

View through CrossRef
ABSTRACT The Ninian Field, operated by Chevron on behalf of the Ninian Field Group, is a mature North Sea producer. Rationalisation of the topside facilities and declining production rates had left spare equipment and capacity in the Platform production systems. This spare capacity coupled with Ninian's strategic location in the Northern North Sea made it an ideal candidate for tie-in of subsea fields. Staffa, Lyell and Strathspey, operated by Lasmo, Conoco and Texaco respectively, are three such third party subsea developments using Ninian topside facilities. The Ninian Third Party Project is unique since it is the first offshore development where three third party operated subsea fields are processed by another operator and developed within the same timescale. In addition, major topside modifications were performed while Ninian continued to operate. Through sharing the lessons learned by Chevron as operator and manager of the Third Party Project, others will benefit in improved efficiency, planning and organisation for similar future endeavors. The impacts of managing a major project (over 3 million offshore construction manhours) with an existing operations infrastructure, interfaces with Third Party Entrants, safety, productivity and efficiency results are among the issues which will be addressed. INTRODUCTION The Ninian Field is located some 110 miles North East of the Shetland Islands within Blocks 3/3 and 3/8 in the area commonly known as the East Shetland Basin. The Ninian Field maintains a strategic position in the Basin. The field was discovered in February 1974 and began production in December 1978. With an estimated 3 billion barrels of oil in place, the field is expected to recover 1.2 billion barrels of oil producing well into the next century. The field was developed using three platforms, the giant concrete Ninian Central and the two conventional steel structures of Southern and Northern. Oil export from Ninian is via a 36" pipeline to the largest terminal in Europe - Sullom Voe located 110 miles away on the main island of the Shetlands. Oil from Ninian Southern is pumped up and over Central through a manifold to the 36" export line. Ninian Central also acts as a hub gathering production from Unocal's Heather Field, BP's Magnus Field and Total's Alwyn North Field. Since their initial construction, all three platforms have received regular updates to their production systems. On Ninian Southern and Central Platforms the original two train, three vessel production separator systems have been optimised to single train, two vessel operation, leaving redundant production vessels in place. Also on Ninian Southern Platform in response to Ninian's declining production and reduction in associated fuel gas availability the LPG recovery plant was decommissioned. For these, and other reasons, Ninian Southern and Central Platforms were best suited for host satellite developments.
Title: Ninian Third Party Project: A Unique North Sea Challenge
Description:
ABSTRACT The Ninian Field, operated by Chevron on behalf of the Ninian Field Group, is a mature North Sea producer.
Rationalisation of the topside facilities and declining production rates had left spare equipment and capacity in the Platform production systems.
This spare capacity coupled with Ninian's strategic location in the Northern North Sea made it an ideal candidate for tie-in of subsea fields.
Staffa, Lyell and Strathspey, operated by Lasmo, Conoco and Texaco respectively, are three such third party subsea developments using Ninian topside facilities.
The Ninian Third Party Project is unique since it is the first offshore development where three third party operated subsea fields are processed by another operator and developed within the same timescale.
In addition, major topside modifications were performed while Ninian continued to operate.
Through sharing the lessons learned by Chevron as operator and manager of the Third Party Project, others will benefit in improved efficiency, planning and organisation for similar future endeavors.
The impacts of managing a major project (over 3 million offshore construction manhours) with an existing operations infrastructure, interfaces with Third Party Entrants, safety, productivity and efficiency results are among the issues which will be addressed.
INTRODUCTION The Ninian Field is located some 110 miles North East of the Shetland Islands within Blocks 3/3 and 3/8 in the area commonly known as the East Shetland Basin.
The Ninian Field maintains a strategic position in the Basin.
The field was discovered in February 1974 and began production in December 1978.
With an estimated 3 billion barrels of oil in place, the field is expected to recover 1.
2 billion barrels of oil producing well into the next century.
The field was developed using three platforms, the giant concrete Ninian Central and the two conventional steel structures of Southern and Northern.
Oil export from Ninian is via a 36" pipeline to the largest terminal in Europe - Sullom Voe located 110 miles away on the main island of the Shetlands.
Oil from Ninian Southern is pumped up and over Central through a manifold to the 36" export line.
Ninian Central also acts as a hub gathering production from Unocal's Heather Field, BP's Magnus Field and Total's Alwyn North Field.
Since their initial construction, all three platforms have received regular updates to their production systems.
On Ninian Southern and Central Platforms the original two train, three vessel production separator systems have been optimised to single train, two vessel operation, leaving redundant production vessels in place.
Also on Ninian Southern Platform in response to Ninian's declining production and reduction in associated fuel gas availability the LPG recovery plant was decommissioned.
For these, and other reasons, Ninian Southern and Central Platforms were best suited for host satellite developments.

Related Results

The Construction Of The Ninian Central Platform For The British North Sea
The Construction Of The Ninian Central Platform For The British North Sea
ABSTRACT At tow out from the construction base on the West coast of Scotland with 600,000 tonnes displacement, the Ninian Central Platform became the biggest floa...
Reinventing the Party Wall - For Quality City Living
Reinventing the Party Wall - For Quality City Living
<p><b>The party wall is a commonly used building element that is rarely exploited to its full potential due to structural and legal complications. The party wall was in...
Political Party Systems in East and Southeast Asia
Political Party Systems in East and Southeast Asia
This article reviews academic work on party systems—defined as the patterns of interactions between political parties—in East and Southeast Asia (hereafter “East Asia”). Before dra...
Seasonal Arctic sea ice predictability and prediction
Seasonal Arctic sea ice predictability and prediction
Arctic sea ice plays a central role in the Earth’s climate. Changes in the sea ice on seasonal-to-interannual timescales impact ecosystems, populations and a growing number of stak...
Ninian Field Concrete Gravity Platform
Ninian Field Concrete Gravity Platform
Abstract The Ninian Central Platform was built at Loch Kishorn by Howard-Doris for Chevron (UK) Ltd. The paper discusses the design process toge...
Upending Control System for the Ninian Field Southern Platform
Upending Control System for the Ninian Field Southern Platform
ABSTRACT This paper describes the latest "state-of-the-art" equipment developed for controlled flooding and upending of very large offshore oil drilling platforms...
Sea Level Rise
Sea Level Rise
Sea level is the height of the sea surface expressed either in a geocentric reference frame (absolute sea level) or with respect to the moving Earth’s crust (relative sea level). A...

Back to Top