Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Systematic Review of Risks in Energy Performance Contracting (EPC) Projects

View through CrossRef
In recent years, the market trends and acceptance of Energy Performance Contracting (EPC) have caught the attention of international specialists, especially in energy management fields. EPC projects are widely acknowledged as among the most efficient global strategies for improving Energy Efficiency (EE). However, EPC projects are plagued by numerous uncertainties, which increase project risk. The impact of risk factors and categories on EPC projects can influence the effectiveness and success of implementation in EPC projects. This paper applied the pre-recording systematic reviews and meta-analysis (PRISMA) approach to determine the primary data based on a few keywords, such as “risk or uncertainty and Energy Performance Contracting or Energy Performance Contracting project”. Based on advanced searching on SCOPUS and Web of Science (WOS), we found 32 selected articles (n=32). Expert scholars decided to develop three themes, which are (1) risk categories in EPC projects, (2) risk factors and categories in EPC projects, as well as (3) risk assessment methods in EPC projects. Here, the results summarise that the 19 risk factors were obtained and classified into six categories. In addition, risk assessment methods in EPC projects have been summarised. Consequently, the research findings can benefit academics and industrial practitioners in EPC projects.
Title: Systematic Review of Risks in Energy Performance Contracting (EPC) Projects
Description:
In recent years, the market trends and acceptance of Energy Performance Contracting (EPC) have caught the attention of international specialists, especially in energy management fields.
EPC projects are widely acknowledged as among the most efficient global strategies for improving Energy Efficiency (EE).
However, EPC projects are plagued by numerous uncertainties, which increase project risk.
The impact of risk factors and categories on EPC projects can influence the effectiveness and success of implementation in EPC projects.
This paper applied the pre-recording systematic reviews and meta-analysis (PRISMA) approach to determine the primary data based on a few keywords, such as “risk or uncertainty and Energy Performance Contracting or Energy Performance Contracting project”.
Based on advanced searching on SCOPUS and Web of Science (WOS), we found 32 selected articles (n=32).
Expert scholars decided to develop three themes, which are (1) risk categories in EPC projects, (2) risk factors and categories in EPC projects, as well as (3) risk assessment methods in EPC projects.
Here, the results summarise that the 19 risk factors were obtained and classified into six categories.
In addition, risk assessment methods in EPC projects have been summarised.
Consequently, the research findings can benefit academics and industrial practitioners in EPC projects.

Related Results

ASSA13-11-14 Comparison of Healthy BM-EPC and CL-EPC Transplantation to Rescue Ischemic Myocardium in Diabetic Rabbits
ASSA13-11-14 Comparison of Healthy BM-EPC and CL-EPC Transplantation to Rescue Ischemic Myocardium in Diabetic Rabbits
Objective There are two types of endothelial progenitor cell (EPC) in bone marrow (BM) and circulation, BM-EPC and Circulation late endothelial progenitor cell (C...
Compromised endothelial progenitor cell exosomal communication with endothelial cells in hypertension ischemia conditions
Compromised endothelial progenitor cell exosomal communication with endothelial cells in hypertension ischemia conditions
We have previously demonstrated that endothelial progenitor cell (EPC) derived exosomes (EPC-EXs) can protect endothelial cells (ECs) against hypoxia injury. Given that EX function...
Design Optimization Challenges During Detailed Engineering: EPC Contractors' Perspective
Design Optimization Challenges During Detailed Engineering: EPC Contractors' Perspective
Abstract The successful completion of Detailed Engineering is influenced by the timely acceptance of design changes proposed by Engineering, Procurement & Constr...
Evaluating the Science to Inform the Physical Activity Guidelines for Americans Midcourse Report
Evaluating the Science to Inform the Physical Activity Guidelines for Americans Midcourse Report
Abstract The Physical Activity Guidelines for Americans (Guidelines) advises older adults to be as active as possible. Yet, despite the well documented benefits of physical activi...

Back to Top