Extending Well Life and Securing Well Integrity Efficiently
View through CrossRef
Abstract
Well integrity is one of the most critical aspects during the life of every gas or oil well. Safety of production or drilling personnel cannot be neglected. To mitigate, damaged downhole equipment or well integrity needs to be monitored controlled, inspected and if necessary repaired or upgraded. It is common to see wells being suspended or abandoned when Sustained Annulus Pressure (SAP) appears either in A, B or C annulus. To rescue these wells, we need to cure any well integrity or safety anomalies to either preserve the asset or responsibly retire the asset.
In this case study well salvage operations were focused on curing SAP-A due to packer/tubing/csg anomalies and SAP-B that was present between 9-5/8″ and 13-3/8″ annuli. For this well, it was essential to first successfully cure SAP-B first, to be able to proceed to address SAP A with the completion replacement, resulting ultimately in SAP-B curing effectiveness being predominant to meeting well integrity objectives and putting well back to production safely and efficiently. A sustainable and safe approach was selected for curing SAP-B – Perf, Wash & Cement (PWC). This efficient technique has been getting more attention globally as an effective way of curing SAP and has several significant advantages over the traditional approaches (section milling, perf & squeeze, csg patch, etc).
The well was scheduled for intervention to cure two sections with SAP B and if successful, repair SAP-A, conditions were challenging but worth given the productivity of the asset. The well was rescued and successfully producing, recovering over approximately 150% of the cost and saving over 80% of the typical cost of the interventions, replacement, and additional P&A cost for decommissioning.
During workover a reliable retrievable bridge plug with a special design has been selected to serve as a base for the treatment, thus eliminating any debris left in the well after workover, saving rig time and avoiding accessibility and re-completion concerns with the debris left on top or inside the liner. Moreover, a mechanical perforator allowed to safely and efficiently perforate 150ft interval without use of any explosives and a closed-loop system was utilized for effective washing and cementing the selected intervals. After successful displacement of cement into perforations and sufficient WOC time, the treated interval has been drilled out and RBP retrieved without any difficulties. The second stage allowed to reposition the tool in a shallower interval to address a second area of concern curing SAP-B. After operations were concluded, SAP-B was reported as 0psi thus allowing the Operator to install 7″ Tieback casing cemented in place, thus allowing to run new completion string and curing SAP-A.
After confirming and identifying the concerning SAP A and B sections. An analysis of several methods and options was carried out and it was decided to select a very safe and efficient methodology to address the well.
This system allowed for very safe, efficient and time saving casing mechanical perforation while enhancing the washing and removal of the debris and solids found behind the casing and at the same time it was able to preserve the integrity of the casing behind. The tool was run to repair two sections in a single run saving approximately 15% of the total cost for a regular intervention and 4 days rig time.
Title: Extending Well Life and Securing Well Integrity Efficiently
Description:
Abstract
Well integrity is one of the most critical aspects during the life of every gas or oil well.
Safety of production or drilling personnel cannot be neglected.
To mitigate, damaged downhole equipment or well integrity needs to be monitored controlled, inspected and if necessary repaired or upgraded.
It is common to see wells being suspended or abandoned when Sustained Annulus Pressure (SAP) appears either in A, B or C annulus.
To rescue these wells, we need to cure any well integrity or safety anomalies to either preserve the asset or responsibly retire the asset.
In this case study well salvage operations were focused on curing SAP-A due to packer/tubing/csg anomalies and SAP-B that was present between 9-5/8″ and 13-3/8″ annuli.
For this well, it was essential to first successfully cure SAP-B first, to be able to proceed to address SAP A with the completion replacement, resulting ultimately in SAP-B curing effectiveness being predominant to meeting well integrity objectives and putting well back to production safely and efficiently.
A sustainable and safe approach was selected for curing SAP-B – Perf, Wash & Cement (PWC).
This efficient technique has been getting more attention globally as an effective way of curing SAP and has several significant advantages over the traditional approaches (section milling, perf & squeeze, csg patch, etc).
The well was scheduled for intervention to cure two sections with SAP B and if successful, repair SAP-A, conditions were challenging but worth given the productivity of the asset.
The well was rescued and successfully producing, recovering over approximately 150% of the cost and saving over 80% of the typical cost of the interventions, replacement, and additional P&A cost for decommissioning.
During workover a reliable retrievable bridge plug with a special design has been selected to serve as a base for the treatment, thus eliminating any debris left in the well after workover, saving rig time and avoiding accessibility and re-completion concerns with the debris left on top or inside the liner.
Moreover, a mechanical perforator allowed to safely and efficiently perforate 150ft interval without use of any explosives and a closed-loop system was utilized for effective washing and cementing the selected intervals.
After successful displacement of cement into perforations and sufficient WOC time, the treated interval has been drilled out and RBP retrieved without any difficulties.
The second stage allowed to reposition the tool in a shallower interval to address a second area of concern curing SAP-B.
After operations were concluded, SAP-B was reported as 0psi thus allowing the Operator to install 7″ Tieback casing cemented in place, thus allowing to run new completion string and curing SAP-A.
After confirming and identifying the concerning SAP A and B sections.
An analysis of several methods and options was carried out and it was decided to select a very safe and efficient methodology to address the well.
This system allowed for very safe, efficient and time saving casing mechanical perforation while enhancing the washing and removal of the debris and solids found behind the casing and at the same time it was able to preserve the integrity of the casing behind.
The tool was run to repair two sections in a single run saving approximately 15% of the total cost for a regular intervention and 4 days rig time.
Related Results
Developing guidelines for research institutions
Developing guidelines for research institutions
As introduced in Chapter 1, in this thesis, I developed guidelines to research institutions on how to foster research integrity. I did this by exploring how research institutions c...
Actualització consistent de bases de dades deductives
Actualització consistent de bases de dades deductives
En aquesta tesi, proposem un nou mètode per a l'actualització consistent de bases de dades deductives. Donada una petició d'actualització, aquest mètode tradueix de forma automàtic...
Well Integrity Data Assessment WIDA Implementation through Integrating Established Well Data Systems to Increase Safe Operability for Wells with a History of Interdependence Integrity Issues
Well Integrity Data Assessment WIDA Implementation through Integrating Established Well Data Systems to Increase Safe Operability for Wells with a History of Interdependence Integrity Issues
Abstract
ADCO is accountable to operate a well stock with integrity, technical and operational challenges. It is the responsibility of ADCO to devise a system or met...
The Evolution of Facilities Integrity Management at Enbridge Pipelines Inc.
The Evolution of Facilities Integrity Management at Enbridge Pipelines Inc.
Public and employee safety, environmental stewardship, increased focus by the regulators, public awareness are some of the reasons why operators need to focus on the integrity of t...
Almost Semi-extending Modules
Almost Semi-extending Modules
Fuchs introduced purely extending modules as a generalization of extending modules. Ahmed and Abbas gave another generalization for extending modules named semi-extending mod...
La protección de la integridad personal
La protección de la integridad personal
Resumen:El artículo pretende analizar la evolución de la protección de la integridad personal en España desde la aprobación de la Constitución de 1978 hasta el presente.En primer l...
Fissure Integrity and Volume Reduction in Emphysema: A Retrospective Study
Fissure Integrity and Volume Reduction in Emphysema: A Retrospective Study
<b><i>Background:</i></b> One-way endobronchial valves (EBVs) relieve symptoms of emphysema, particularly in patients without collateral ventilation between...
Risk-Based Analysis of Thermal Well Integrity Through Integration of Caprock Geomechanics and Cement Sheath Design
Risk-Based Analysis of Thermal Well Integrity Through Integration of Caprock Geomechanics and Cement Sheath Design
Abstract
The integrity of thermal in situ wells is a function of the distinct yet inter-related processes that control the integrity of the reservoir caprock and of ...