Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Analysis of A Detention Basin as A Flood Control Measure in Kedawung Village, Tanjung Subdistrict, Brebes Regency

View through CrossRef
Flooding is a common problem in local communities due to heavy rainfall and limited drainage capacity. A detention basin is a flood control infrastructure designed to temporarily store surface runoff before releasing it downstream. This study analyzes the performance of a detention basin as a flood control measure using a flood routing approach, with emphasis on sluice gate opening variation and its effect on outflow behavior. The research employs quantitative hydrological and hydraulic analysis under three operational conditions: fully closed, half-open, and fully open sluice gate. Hydrological analysis includes the determination of design rainfall using a selected probability distribution with goodness-of-fit testing, followed by calculations of time of concentration, rainfall intensity, and design flood discharge. The resulting discharge is used as inflow in the flood routing simulation. Hydraulic analysis covers outflow computation through the sluice gate, as well as evaluation of storage changes and water surface elevation within the basin. The relationship between inflow and outflow is examined to understand system response under different gate openings over time. The results show that, for a 25-year return period, the design flood discharge is 4,060 m³/s, with a time of concentration of 44.861 minutes. The flood discharge reduction under half-open sluice gate conditions reaches 64.4%, indicating a significant influence of gate operation on outflow regulation. In conclusion, detention basins play an important role in flood control through peak attenuation and flow delay, while variations in sluice gate opening strongly affect flood routing performance and outflow characteristics.
Title: Analysis of A Detention Basin as A Flood Control Measure in Kedawung Village, Tanjung Subdistrict, Brebes Regency
Description:
Flooding is a common problem in local communities due to heavy rainfall and limited drainage capacity.
A detention basin is a flood control infrastructure designed to temporarily store surface runoff before releasing it downstream.
This study analyzes the performance of a detention basin as a flood control measure using a flood routing approach, with emphasis on sluice gate opening variation and its effect on outflow behavior.
The research employs quantitative hydrological and hydraulic analysis under three operational conditions: fully closed, half-open, and fully open sluice gate.
Hydrological analysis includes the determination of design rainfall using a selected probability distribution with goodness-of-fit testing, followed by calculations of time of concentration, rainfall intensity, and design flood discharge.
The resulting discharge is used as inflow in the flood routing simulation.
Hydraulic analysis covers outflow computation through the sluice gate, as well as evaluation of storage changes and water surface elevation within the basin.
The relationship between inflow and outflow is examined to understand system response under different gate openings over time.
The results show that, for a 25-year return period, the design flood discharge is 4,060 m³/s, with a time of concentration of 44.
861 minutes.
The flood discharge reduction under half-open sluice gate conditions reaches 64.
4%, indicating a significant influence of gate operation on outflow regulation.
In conclusion, detention basins play an important role in flood control through peak attenuation and flow delay, while variations in sluice gate opening strongly affect flood routing performance and outflow characteristics.

Related Results

Detention, Inc.
Detention, Inc.
This paper addresses the influence of economic inequality on immigration detention. The U.S. Department of Homeland Security (“DHS”) detains roughly 350,000 migrants each year an...
DAMPAK TEKNOLOGI TERHADAP PROSES BELAJAR MENGAJAR
DAMPAK TEKNOLOGI TERHADAP PROSES BELAJAR MENGAJAR
DAFTAR PUSTAKAAditama, M. H. R., & Selfiardy, S. (2022). Kehidupan Mahasiswa Kuliah Sambil Bekerja di Masa Pandemi Covid-19. Kidspedia: Jurnal Pendidikan Anak Usia Dini, 3(...
Bentuk Kosakata Arkais dalam Bahasa Banjar di Desa Pembengis Kabupaten Tanjung Jabung Barat
Bentuk Kosakata Arkais dalam Bahasa Banjar di Desa Pembengis Kabupaten Tanjung Jabung Barat
This study aims to describe archaic word forms and archaic meanings in the Banjar language in Pembengis Village, West Tanjung Jabung regency. Archaic are words or terms that are no...
ASP Flood After a Polymer Flood vs. ASP Flood After a Water Flood
ASP Flood After a Polymer Flood vs. ASP Flood After a Water Flood
Abstract Alkaline-surfactant-polymer (ASP) flooding is an effective technique to improve oil recovery. It has been applied typically after a water flood. Recently, t...
Police administrative detention
Police administrative detention
Relevance. The research relevance is predefined by the need to study the legal problems of police administrative detention and, subsequently, to create an effective administrative ...
KOSAKATA TOPONIMI KOTA PANGKALPINANG
KOSAKATA TOPONIMI KOTA PANGKALPINANG
This research focussed on vocabulary study relates to the name of place/region or toponimy of Pangkalpinang district. This study used descriptive method. The data collected through...
Towards optimizing the operation of controlled flood detention basins
Towards optimizing the operation of controlled flood detention basins
Floods are one of the most hazardous natural phenomena worldwide and they are predicted to increase both in intensity and frequency due to climate change. This necessitates compreh...

Back to Top