Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Thermal Behavior During Restart of Ultradeepwater Flowlines

View through CrossRef
Abstract For subsea tiebacks in ultradeepwater, restarting from shut-in conditions can pose significant flow assurance issues. For both planned and unplanned shutdowns, live fluids from the wellbore will come into contact with a cold flowline and can form hydrates during restart since the conditions at the mudline are often well within the hydrate formation region. As the water depth increases, the potential for even higher shut-in pressures exists, exacerbating the probability of hydrate formation. The achievable restart flowrates are directly related to the available inhibitor rates. Ultradeepwater systems often require high hydrate inhibitor (i.e. methanol) dosage rates to protect the flowline from hydrate formation. In general, the temperature warm-up trend is exponential and is a function of the amount of energy input into the system. If the restart flowrate is too low, limited by inhibitor availability, the temperature may slowly approach a condition at which the system is free from hydrate formation and ultimately require a significant inhibitor volume. For these low restart flowrates, the time to reach conditions above the hydrate formation region can be very significant or the flowline may never warm up above hydrate conditions. At high restart flowrates, the flowline warms up quickly, but the inhibitor delivery rates are high, often significantly higher than those required for a similar development in shallow water. There is a trade-off between inhibitor deliverability (line size) and consumption (storage) that must be accounted for at the design stage of a project when considering how to restart the system. Operational procedures such as preheating the flowline with dead (de-gassed/de-watered) crude oil to warm up the pipe walls before restarting the wells have been suggested as a means of expediting the overall flowline warm-up. Preheating the pipe walls maintains the thermal energy in the production fluid and reduces temperature losses associated with the fluid warming up the pipe walls. The effectiveness of this technique, while potentially reducing the warm-up time, may again be limited by the allowable restart flowrates.
Title: Thermal Behavior During Restart of Ultradeepwater Flowlines
Description:
Abstract For subsea tiebacks in ultradeepwater, restarting from shut-in conditions can pose significant flow assurance issues.
For both planned and unplanned shutdowns, live fluids from the wellbore will come into contact with a cold flowline and can form hydrates during restart since the conditions at the mudline are often well within the hydrate formation region.
As the water depth increases, the potential for even higher shut-in pressures exists, exacerbating the probability of hydrate formation.
The achievable restart flowrates are directly related to the available inhibitor rates.
Ultradeepwater systems often require high hydrate inhibitor (i.
e.
methanol) dosage rates to protect the flowline from hydrate formation.
In general, the temperature warm-up trend is exponential and is a function of the amount of energy input into the system.
If the restart flowrate is too low, limited by inhibitor availability, the temperature may slowly approach a condition at which the system is free from hydrate formation and ultimately require a significant inhibitor volume.
For these low restart flowrates, the time to reach conditions above the hydrate formation region can be very significant or the flowline may never warm up above hydrate conditions.
At high restart flowrates, the flowline warms up quickly, but the inhibitor delivery rates are high, often significantly higher than those required for a similar development in shallow water.
There is a trade-off between inhibitor deliverability (line size) and consumption (storage) that must be accounted for at the design stage of a project when considering how to restart the system.
Operational procedures such as preheating the flowline with dead (de-gassed/de-watered) crude oil to warm up the pipe walls before restarting the wells have been suggested as a means of expediting the overall flowline warm-up.
Preheating the pipe walls maintains the thermal energy in the production fluid and reduces temperature losses associated with the fluid warming up the pipe walls.
The effectiveness of this technique, while potentially reducing the warm-up time, may again be limited by the allowable restart flowrates.

Related Results

Time Resolved Investigations of Streamtraced Inlet Restart Dynamics
Time Resolved Investigations of Streamtraced Inlet Restart Dynamics
Abstract Obtaining reliable restart of hypersonic inlets in the event of accidental unstart remains a key performance metric that challenge the operational boundary...
Thermal Effects in High Compactness CEA Stack
Thermal Effects in High Compactness CEA Stack
Thermal management is a pivotal aspect of stack durability and system operability. Consequently, understanding the thermal mapping within a stack based on its operating conditions ...
King Flowlines - Thermal Expansion Design and Implementation
King Flowlines - Thermal Expansion Design and Implementation
Abstract The King flowlines, located in the Mississippi Canyon area of the Gulf of Mexico, are dual Pipe-in-Pipe (PIP), approximately 17 miles (27 km) long, insta...
Dynamic Behavior of a Flexible Line During Installation
Dynamic Behavior of a Flexible Line During Installation
ABSTRACT In order to get information about the forces on the connection between a flexible riser and a wet Christmas tree during a guide lineless lay-away operati...
Automatic Welding Procedures For CRA Pipelines
Automatic Welding Procedures For CRA Pipelines
ABSTRACT The development by Shell Oil Company of the Fairway Field in the Gulf of Mexico, about four miles outside the entrance to Mobile Bay in Alabama, required...
Dynamic Simulation to Predict Self-Restart Potential of Acid Stimulated Wells by Bullhead Treatment in Deepwater Environment
Dynamic Simulation to Predict Self-Restart Potential of Acid Stimulated Wells by Bullhead Treatment in Deepwater Environment
Abstract Matrix stimulation by acid is a technique used to enhance production from underperforming wells. It involves injection of acid at pressures lower than fract...
Pigging In Subsea Flexible Flowlines
Pigging In Subsea Flexible Flowlines
ABSTRACT Subsea flowline pigging is a difficult task because the access to installations involves complex and costly operations requiring high reliability in equi...
Evaluating CDCL Restart Schemes
Evaluating CDCL Restart Schemes
Modern CDCL (conflict-driven clause learning) SAT solvers are used for many practical applications. One of the key ingredients of state-of-the-art CDCL solvers are efficient restar...

Back to Top