Search engine for discovering works of Art, research articles, and books related to Art and Culture
ShareThis
Javascript must be enabled to continue!

Stakeholder Analysis of Socioeconomic Impacts on Chiang Rai-Chiang Khong Rail Project in Chiang Rai Province

View through CrossRef
The objectives of this research are (1) to study the impacts of Chiang Rai - Chiang Khong rail project on Chiang Rai provinces, especially the social and economic impacts which are caused by the rail project, positively and negatively and (2) to analyze advantages and disadvantages of Chiang Rai - Chiang Khong rail project on Chiang Rai province. The scope of study covers 2 main areas including (1) the search for different impacts in 3 different train station areas and (2) the search for different impacts between local people who live within 5 kilometers of the area where train station will be constructed and local people who live farther than 5 kilometers from the area where train station will be constructed. The research has done by employing survey, observation and in-depth interview with local people in Chiang Rai province in order to focus on the districts which are planned to be the location of train station, namely Wiang Chai district, Chiang Khong district and Pa Daet district. These districts can be influenced by the rail project from the beginning such as the impact from the construction, including land expropriation problem, land price increasing, the impact during the construction which may cause traffic jam or block the water flow in agriculture area, and the impact after construction by which the railway may separate villages or communities and cause several other environmental problems. Urban expansion in Chiang Rai may not expand according to the railway or train station because the town has correspondingly been expanded with the highway. However, the railway is mainly to benefit on tourism and hospitality industry, trade and investment, logistic and supply chain, domestically and internationally. Chiang Rai demands the different way of development which is suitable for basic infrastructure after having the railway in the province.
Office of Academic Resources, Chulalongkorn University
Title: Stakeholder Analysis of Socioeconomic Impacts on Chiang Rai-Chiang Khong Rail Project in Chiang Rai Province
Description:
The objectives of this research are (1) to study the impacts of Chiang Rai - Chiang Khong rail project on Chiang Rai provinces, especially the social and economic impacts which are caused by the rail project, positively and negatively and (2) to analyze advantages and disadvantages of Chiang Rai - Chiang Khong rail project on Chiang Rai province.
The scope of study covers 2 main areas including (1) the search for different impacts in 3 different train station areas and (2) the search for different impacts between local people who live within 5 kilometers of the area where train station will be constructed and local people who live farther than 5 kilometers from the area where train station will be constructed.
The research has done by employing survey, observation and in-depth interview with local people in Chiang Rai province in order to focus on the districts which are planned to be the location of train station, namely Wiang Chai district, Chiang Khong district and Pa Daet district.
These districts can be influenced by the rail project from the beginning such as the impact from the construction, including land expropriation problem, land price increasing, the impact during the construction which may cause traffic jam or block the water flow in agriculture area, and the impact after construction by which the railway may separate villages or communities and cause several other environmental problems.
Urban expansion in Chiang Rai may not expand according to the railway or train station because the town has correspondingly been expanded with the highway.
However, the railway is mainly to benefit on tourism and hospitality industry, trade and investment, logistic and supply chain, domestically and internationally.
Chiang Rai demands the different way of development which is suitable for basic infrastructure after having the railway in the province.

Related Results

Competition Into Brazilian and North American Freight Rail Systems: A Comparative Regulatory Assessment
Competition Into Brazilian and North American Freight Rail Systems: A Comparative Regulatory Assessment
Competition is the driving force of any economic system, as it creates a challenging environment for service suppliers to provide affordable and reliable services to customers. Rai...
Design of Flangeway Gap for Restraining Rail
Design of Flangeway Gap for Restraining Rail
The aim of the paper is to classify restraining rail, discuss the advantages and disadvantages of each type of restraining rail, derive the formula to determine the flangeway gap, ...
San Pedro Bay Ports Rail Enhancement Program: 2010 Update
San Pedro Bay Ports Rail Enhancement Program: 2010 Update
The San Pedro Bay Ports of Long Beach and Los Angeles continue to provide vital rail connections to the rest of the country. The Rail Enhancement Program sets forth the rail improv...
Influence of Rail Cant on High Rail Side Wear on Sharp Curve of Urban Transit
Influence of Rail Cant on High Rail Side Wear on Sharp Curve of Urban Transit
The increasing of traffic and operation speed in urban transits has accelerated the degradation of track components. Rail wear, especially extended side wear of the high rail on sh...
A Comparative Test of the Mechanical Properties for New Mesh-Type High-Damping Rail Pad and Traditional Rail Pads
A Comparative Test of the Mechanical Properties for New Mesh-Type High-Damping Rail Pad and Traditional Rail Pads
The commonly used rail pads for urban rail transit fastener systems include prismatic and grooved rail pads. To reduce pad stress, improve the damping effect, and improve the usage...
Fatigue Analysis of Rail-Head-to-Web Fillet at Bolted Rail Joint Under Various Impact Wheel Load Factors and Support Configurations
Fatigue Analysis of Rail-Head-to-Web Fillet at Bolted Rail Joint Under Various Impact Wheel Load Factors and Support Configurations
As one of the weakest locations in the track superstructure, the rail joint encounters different types of defects and failures, including rail bolt-hole cracking, rail head-web cra...
Research on Dynamic Characteristics of Novel Filled Damping Block Mesh-Type Rail Pads for Heavy Haul Railways
Research on Dynamic Characteristics of Novel Filled Damping Block Mesh-Type Rail Pads for Heavy Haul Railways
Currently, the commonly used rail pads for heavy haul railways are grooved rubber rail pads (GRRP) and prismatic thermoplastic polyester elastomer (TPEE) rail pads (PTRP). However,...
Effect of Design Rail Cant on Concrete Crosstie Rail Seat Pressure Distribution
Effect of Design Rail Cant on Concrete Crosstie Rail Seat Pressure Distribution
Previous research has focused on the effect of rail cant on rail wear and wheel/rail interaction, indicating that a steeper rail cant results in increased wear on rails and wheels....

Back to Top