Novel Index for Structural Demolition Efficiency
View through CrossRef
Abstract
The demolition process is just as important as the construction process when the building's life span comes to an end, or if there are construction or soil issues. Although there are various traditional and non-traditional demolition methods used to demolish different structures in various scenarios, there are no criteria or indicators to evaluate the efficiency of demolition methods or scenarios. Thus, an indicator is defined in this research to determine whether the demolition scenario is the optimal one. The use of this indicator provides the selection of appropriate values for parameters that control the demolition process, such as delay time, the columns to be blown up, and the collapse mechanism. The proposed indicator relies on the maximum distance of debris, which is crucial for determining the safe zone during the demolition process. To pronounce the benefit of using this indicator, it is calculated for a real-case explosive demolition radio mast with a height of 220 m and for a tall building consisting of 15 floors by using extreme loading for structures software (ELS) that uses the Applied Element Method (AEM). The delay time parameter is studied in this research to show its effect on demolition efficiency. It is found that a suggested demolition scenario for the mast tower is better than the real demolition by thirteen times, and for the multi-story building demolition, it is found that the optimum value of delay time is 0.3 sec.
Title: Novel Index for Structural Demolition Efficiency
Description:
Abstract
The demolition process is just as important as the construction process when the building's life span comes to an end, or if there are construction or soil issues.
Although there are various traditional and non-traditional demolition methods used to demolish different structures in various scenarios, there are no criteria or indicators to evaluate the efficiency of demolition methods or scenarios.
Thus, an indicator is defined in this research to determine whether the demolition scenario is the optimal one.
The use of this indicator provides the selection of appropriate values for parameters that control the demolition process, such as delay time, the columns to be blown up, and the collapse mechanism.
The proposed indicator relies on the maximum distance of debris, which is crucial for determining the safe zone during the demolition process.
To pronounce the benefit of using this indicator, it is calculated for a real-case explosive demolition radio mast with a height of 220 m and for a tall building consisting of 15 floors by using extreme loading for structures software (ELS) that uses the Applied Element Method (AEM).
The delay time parameter is studied in this research to show its effect on demolition efficiency.
It is found that a suggested demolition scenario for the mast tower is better than the real demolition by thirteen times, and for the multi-story building demolition, it is found that the optimum value of delay time is 0.
3 sec.
Related Results
Environmental Assessment of Demolition Tools Used in Townhouse Demolition: System Dynamics Modeling
Environmental Assessment of Demolition Tools Used in Townhouse Demolition: System Dynamics Modeling
To accommodate population growth and migration to cities, many infrastructures have been demolished to build new residential units. Demolition processes cause various environmental...
Form Follows Force: A theoretical framework for Structural Morphology, and Form-Finding research on shell structures
Form Follows Force: A theoretical framework for Structural Morphology, and Form-Finding research on shell structures
The springing up of freeform architecture and structures introduces many challenges to structural engineers. The main challenge is to generate structural forms with high structural...
Management of safety and health hazards associated with construction and demolition waste in Zimbabwe
Management of safety and health hazards associated with construction and demolition waste in Zimbabwe
AbstractThe management of safety and health hazards associated with construction and demolition waste in Zimbabwe is a critical issue that requires comprehensive attention. Purpose...
Demolition performance of high-pressure water jet based on SPH coupling with FEM for hydraulic demolition robot
Demolition performance of high-pressure water jet based on SPH coupling with FEM for hydraulic demolition robot
Due to the huge computational cost caused by using multi-layer particles to achieve continuous water jet, this work developed a numerical model adopting single-layer particles to r...
Demolition of Buildings – An Overview
Demolition of Buildings – An Overview
We know that every structure is designed for a specific life period, generally 100 years. The existence of the structure after the service life period is very dangerous to its occu...
Living Room
Living Room
Living Room is an interactive, multimodal online documentary. It engages with the demolition of a modernist public housing estate in inner London (UK). The demolition is presented ...
Analytical methods for selection of demolition technology
Analytical methods for selection of demolition technology
Abstract
Demolition of buildings and structures, or their structural elements, is primarily aimed in designing stage – for the reconstruction or renovation of a buil...
ESTIMATING THE DEMOLITION PROBABILITY OF BUILDINGS USING A BOTTOM-UP APPROACH
ESTIMATING THE DEMOLITION PROBABILITY OF BUILDINGS USING A BOTTOM-UP APPROACH
The sources and quantities of construction and demolition waste (CDW) are a major source of uncertainty hindering the optimization of the reverse-logistics network design for this ...