Javascript must be enabled to continue!
How Safe Failure Pressure Ratios are Related to %SMYS
View through CrossRef
Majority of the pipeline operators manage corrosion using inline inspection (ILI). ILIs enable operators to choose which anomalies should be excavated and, on the flip side, which anomalies are safe to remain on the pipe. If the remaining anomalies grow to a critical size before the next ILI cycle there will be in-service failure. This is avoided by forecasting the growth of the measured defects appropriately and assessing them for future integrity.
When an ILI is performed on a pipeline the ILI vendor reports the anomaly sizes, burst pressures and the Failure Pressure Ratios for each anomaly. Failure Pressure Ratio (FPR) for an anomaly is defined as the burst pressure divided by the Maximum allowable operation pressure (MAOP). In order to avoid ruptures, operators will excavate anomalies that have a limiting value of FPR. These limiting values are also referred to as response criteria, excavation criteria, safe failure pressure ratios, or safety factors. As the FPR depends heavily on the operating stress (or %SMYS) the limiting FPR value, below which we respond, should also depend on %SMYS. However, currently there is inconsistency in the use of response criteria in the industry. Some utilize the same response criteria for all pipe irrespective of %SMYS. This study shows that using the same limiting FPR does not provide the same level of safety for different %SMYS scenarios. It shows that the size of remaining anomalies in the lower %SMYS pipe would be significantly larger than in higher %SMYS pipe, leading to lower reliability in pipelines that have lower %SMYS. For gas pipelines, these lower %SMYS pipelines are often in higher location class pipelines with higher consequences of failure.
In other words, even though the FPR value is the same for two anomalies in two different %SMYS pipes, the two anomalies would have very different probabilities of failure, where one anomaly could be safe while the other is not.
This paper examines the ranges of FPR and the safe response criteria as a function of %SMYS. It examines the remaining anomaly sizes in different %SMYS pipe as allowed by current standards. The effect of the uncertainties on the response criteria due to measurement errors, material and geometric properties and model errors are also examined. It examines the response criteria in different jurisdictions. The effect of using different assessment equations, such as Modified B31G or RSTRENG, on the response criteria is also discussed. In order to obtain consistent safety, the consideration of %SMYS and consequences in defining a response criterion is discussed.
Many sets of ILI data, which have pipe in different %SMYS, have been assessed in order to examine practical ranges of FPR with %SMYS. The practical implications of different response criteria are studied and discussed.
American Society of Mechanical Engineers
Title: How Safe Failure Pressure Ratios are Related to %SMYS
Description:
Majority of the pipeline operators manage corrosion using inline inspection (ILI).
ILIs enable operators to choose which anomalies should be excavated and, on the flip side, which anomalies are safe to remain on the pipe.
If the remaining anomalies grow to a critical size before the next ILI cycle there will be in-service failure.
This is avoided by forecasting the growth of the measured defects appropriately and assessing them for future integrity.
When an ILI is performed on a pipeline the ILI vendor reports the anomaly sizes, burst pressures and the Failure Pressure Ratios for each anomaly.
Failure Pressure Ratio (FPR) for an anomaly is defined as the burst pressure divided by the Maximum allowable operation pressure (MAOP).
In order to avoid ruptures, operators will excavate anomalies that have a limiting value of FPR.
These limiting values are also referred to as response criteria, excavation criteria, safe failure pressure ratios, or safety factors.
As the FPR depends heavily on the operating stress (or %SMYS) the limiting FPR value, below which we respond, should also depend on %SMYS.
However, currently there is inconsistency in the use of response criteria in the industry.
Some utilize the same response criteria for all pipe irrespective of %SMYS.
This study shows that using the same limiting FPR does not provide the same level of safety for different %SMYS scenarios.
It shows that the size of remaining anomalies in the lower %SMYS pipe would be significantly larger than in higher %SMYS pipe, leading to lower reliability in pipelines that have lower %SMYS.
For gas pipelines, these lower %SMYS pipelines are often in higher location class pipelines with higher consequences of failure.
In other words, even though the FPR value is the same for two anomalies in two different %SMYS pipes, the two anomalies would have very different probabilities of failure, where one anomaly could be safe while the other is not.
This paper examines the ranges of FPR and the safe response criteria as a function of %SMYS.
It examines the remaining anomaly sizes in different %SMYS pipe as allowed by current standards.
The effect of the uncertainties on the response criteria due to measurement errors, material and geometric properties and model errors are also examined.
It examines the response criteria in different jurisdictions.
The effect of using different assessment equations, such as Modified B31G or RSTRENG, on the response criteria is also discussed.
In order to obtain consistent safety, the consideration of %SMYS and consequences in defining a response criterion is discussed.
Many sets of ILI data, which have pipe in different %SMYS, have been assessed in order to examine practical ranges of FPR with %SMYS.
The practical implications of different response criteria are studied and discussed.
Related Results
Frequency of Common Chromosomal Abnormalities in Patients with Idiopathic Acquired Aplastic Anemia
Frequency of Common Chromosomal Abnormalities in Patients with Idiopathic Acquired Aplastic Anemia
Objective: To determine the frequency of common chromosomal aberrations in local population idiopathic determine the frequency of common chromosomal aberrations in local population...
A New Sour Service 125 ksi SMYS Drillpipe with Sour Service 120 ksi SMYS Tool Joints for Use in Sour Gas Drilling or Non-Sour Offshore Intervention Riser Applications Requiring Higher Load Capacities
A New Sour Service 125 ksi SMYS Drillpipe with Sour Service 120 ksi SMYS Tool Joints for Use in Sour Gas Drilling or Non-Sour Offshore Intervention Riser Applications Requiring Higher Load Capacities
AbstractThe term "sour" is used to refer to drilling environments containing hydrogen sulfide (H2S). In sour wells, H2S causes sulfide stress cracking (SSC) in carbon low-alloy ste...
Extensions of Pressure Build-Up Analysis Methods
Extensions of Pressure Build-Up Analysis Methods
RUSSELL, D.G.,* MEMBER AIME, SHELL DEVELOPMENT CO., HOUSTON, TEX.
Abstract
Two techniques have been developed with which the app...
Implications and Trends in SMYS Built Into Pipelines
Implications and Trends in SMYS Built Into Pipelines
For many the use of SMYS in conjunction with working-strength design for pipelines leads to the expectation that the least strength of the joints in the pipeline is at or above SMY...
[RETRACTED] Keanu Reeves CBD Gummies v1
[RETRACTED] Keanu Reeves CBD Gummies v1
[RETRACTED]Keanu Reeves CBD Gummies ==❱❱ Huge Discounts:[HURRY UP ] Absolute Keanu Reeves CBD Gummies (Available)Order Online Only!! ❰❰= https://www.facebook.com/Keanu-Reeves-CBD-G...
Analyzing Well Performance VII
Analyzing Well Performance VII
Introduction
Analyzing well performance is an important step toward increasing profits by improving production techniques. The analysis is made by field tests and...
Did Covid-19 Pandemic Raised Tax Incomes in Bad Economic Situations?
Did Covid-19 Pandemic Raised Tax Incomes in Bad Economic Situations?
The fact that COVID-19 pandemic affected economic situation is known widely, but many companies actually can use ratios for measuring financial situation. If we look deeper, financ...
Casing Deformation in Ekofisk
Casing Deformation in Ekofisk
Summary
Casing deformation resulting from reservoir compaction occurred in the Ekofisk field operated by Phillips Petroleum Co. Norway and is a serious problem in...